Overview and Production Statistics                                              
PALABORA MINING COMPANY LIMITED                                                 
(Incorporated in the Republic of South Africa)                                  
Registration number - 1956/002134/06                                            
JSE Code: PAM - ISIN: ZAE000005245                                              
("Palabora" or "the Company")                                                   
SECOND QUARTER 2009 - OPERATIONS OVERVIEW AND PRODUCTION STATISTICS             
                                                                                
                  2Q        3Q        4Q       1Q         2Q      1H     1H     
                 2008      2008      2008     2009       2009    2008   2009    
Palabora mine                                                                   
Tonnes hoisted    3,026     3,086     3,019    2,966      3,009   5,725  5,975  
(`000 tonnes)                                                                   
Ore treated (`000 3,027     3,096     3,150    2,789      2,940   6,208  5,729  
tonnes)                                                                         
Average ore       0.71      0.66      0.67     0.68       0.68    0.71   0.68   
grade: copper (%)                                                               
Copper            89.4      56.5      66.7     67.7       76.1    163.3  143.80 
concentrates                                                                    
produced                                                                        
(`000 tonnes)                                                                   
Average           29.2      30.3      29.6     30.5       29.9    29.5   30.2   
concentrate grade:                                                              
copper (%)                                                                      
Copper in          26.1      17.1      19.7     20.5       22.8    48.2   43.3  
concentrates (`000                                                              
tonnes)                                                                         
Palabora                                                                        
smelter/refinery                                                                
New concentrate    72.3      52.5      70.0     72.8       68.0    138.8  140.80
smelted on site                                                                 
(`000 tonnes)                                                                   
New copper anodes  22.3      14.9      20.7     20.2       18.9    40.4   39.10 
produced                                                                        
(`000 tonnes)                                                                   
Refined new copper 21.6      17.0      19.1     21.0       19.5    39.8   40.5  
produced                                                                        
(`000 tonnes)                                                                   
By-products:                                                                    
Magnetite          475       562       469      772        617     921    1,389 
concentrate (`000                                                               
tonnes)                                                                         
Nickel contained   26        13        19.3     21.4       39.9    68     61.30 
(tonnes)                                                                        
Copper sold as     3.2       1         4.5      0          9.1     5      9.1   
concentrate (`000                                                               
tonnes)                                                                         
Vermiculite plant                                                               
Vermiculite        50        50        49       52         46      100    98.0  
produced (`000                                                                  
tonnes)                                                                         
Palabora, a member of the Rio Tinto Group of Companies, situated in the Ba-     
Phalaborwa area of Limpopo, operates a large block cave copper mine and         
smelter complex.                                                                
Daily production from the underground mine averaged 33,066 tonnes for the       
quarter. The production during the quarter was slightly above the previous      
quarter`s tonnes and consistent with the previous quarter`s grade. In total,    
3,008,982 tonnes of ore were hoisted during the quarter with a copper grade of  
0.68%, which is consistent with that of the previous quarter`s grade.           
Ore treated was 5,4% higher compared with the previous quarter and 2,9% lower   
than the corresponding period in 2008. The reduction is mainly attributed to    
the absence of 76,2 kt of surface oxide material.                               
Copper concentrate production improved by 12.4% sequentially, but 14.8% lower   
year on year. This was mainly due to the reduction in the milled throughput.    
The quarterly increase is attributable to a combination of the reclaiming and   
transferring of 12,628 tonnes of low grade concentrate from the pond inventory  
to sale.                                                                        
Copper in concentrate was 11,2% higher than the previous quarter and 12,6%      
lower than the corresponding period in 2008, mainly due to the sale of 3,193    
tonnes of copper in concentrate from the concentrate ponds.                     
The new concentrate smelted was mainly in line with concentrate supplied.       
Converter reliability and acid plant performance affected smelting during the   
first part of the second quarter. The planned shutdown of the waste heat-       
boiler, reverb and acid plant has been postponed until the third quarter of     
2009.                                                                           
Refined copper production was in line with anode supply from the smelter. The   
tank house efficiencies were negatively affected by the lower copper tenor in   
electrolyte.                                                                    
The nickel plant production has steadily increased as the plant has been        
optimised to achieve design capacity. The second quarter was negatively         
affected by the failure of the heat exchanger on the crystalliser circuit and   
the reduction of the feed to the plant in order to regain copper tenor in the   
tank house.                                                                     
Magnetite                                                                       
Magnetite production for the quarter was 20% lower than the first quarter and   
30% higher year on year as a result of the commissioning of stockpile reclaims  
operation and improved magnetite recoveries. The reduction is maninly           
attributed to the reduced current arising feed to the magnetite plant due to    
processing of smelter secondaries blended with sulphide ore for higher copper   
output.                                                                         
Vermiculite Operations                                                          
Vermiculite production for the quarter was negatively affected by a planned 7   
day shutdown of the entire plant, resulting in 10% lower output compared to     
last quarter and 6% lower than the corresponding period in 2008.                
The above information has not been reviewed or reported on by the Company`s     
auditors.                                                                       
Phalaborwa                                                                      
14 July 2009                                                                    
Sponsor:                                                                        
Barnard Jacobs Mellet Corporate Finance (Proprietary) Limited                   
Date: 14/07/2009 16:00:01 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: