Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Tue 11 Aug 2009, 8:06 GBG - Great Basin Gold Successfully Completes Refurbishment of Esmeralda Mill
GBG
GBG                                                                             
GBG - Great Basin Gold Successfully Completes Refurbishment of Esmeralda Mill   
GREAT BASIN GOLD LIMITED                                                        
(Incorporated in Canada and registered as an External Company in South Africa)  
(Registration No. 2006/021304/10)                                               
Share Code: GBG & ISIN Number: CA3901241057                                     
("Great Basin Gold" or "the Company")                                           
GREAT BASIN GOLD SUCCESSFULLY COMPLETES REFURBISHMENT OF ESMERALDA MILL         
August 10, 2009, Vancouver, BC - Great Basin Gold Ltd, ("Great Basin" or the    
"Company"), (TSX: GBG; NYSE Amex: GBG; JSE: GBG) announces that it has completed
the refurbishment of the Esmeralda Mill. The Esmeralda Mill will process        
material extracted from the Hollister Gold Project at which trial mining is     
currently underway.                                                             
The commissioning process at Esmeralda commenced in mid July. The commissioning 
will proceed in two phases. Following the completion of a concrete ore pad, low 
grade material from Hollister was shipped to Esmeralda. This material will be   
used for the first-phase cold commissioning of the mill with higher grade       
material to follow in the second phase. A Gekko float and gravity circuit will  
be installed and commissioned by the end of October 2009 to allow for maximum   
throughput of 350 tons per day and an estimated 91% recovery of the high metal  
content material from Hollister.                                                
Until the Gekko float and gravity section has been commissioned, the rate of    
milling will be determined by the grade of material. The mill will achieve the  
designed rate of 350 tons per day on material with a contained grade 0.5 oz/ton 
Au and 3 oz/ton Ag or less, using a standard concentrator. In the interim,      
higher grade material will be restricted to allow for extended leach time to get
optimal recovery as well as the elution of the higher metal values from the     
loaded carbon.                                                                  
Construction of a new refinery at Esmeralda will coincide with a design         
completion that incorporates the new state-of the-art emission controls         
consistent with the Nevada Department of Environmental Protection Mercury       
Control Program. Commissioning of the refinery will commence upon receipt of the
air quality Permit to Construct. In the interim, concentrate will be refined off
site.                                                                           
Capital expenditure on the refurbishment has increased as a result of an        
additional upgrade cost (US$1.8 million) that would allow for the plant to be   
expanded to a 700 tons per day operation in future as well as the cost (US$1.2  
million) of certain additional environmental requirements which affect the final
design and construction of the mill and associated infrastructure. The total    
cost of refurbishment (excluding refurbishment and commissioning of the smelter 
and additional investment to upsize the mill) is forecast to be US$11 million.  
Ferdi Dippenaar, CEO commented; "We are pleased with the manner in which the    
refurbishment and upgrade of the facility was completed. No problems have thus  
far been encountered with the commissioning of the facility. The addition of the
flotation and gravity section will allow higher throughput and recoveries of the
high grade material being extracted at Hollister. Projected milling costs of    
approximately US$110/ton, transportation included, are significantly lower than 
the treatment costs currently incurred. Since acquiring the Esmeralda mill and  
property, the Company has evaluated the option of increasing the capacity of the
mill to 700 tons per day. A decision to increase the capacity of the mill will  
be determined by the conclusions from the desk top study due for completion in  
August. This study includes a review of the Esmeralda deposit, a past producer, 
to determine the potential to re-open the mine."                                
Johan Oelofse, Pr.Eng, FSAIMM, Great Basin`s Chief Operating Officer, a         
Qualified Person as defined by Canadian Securities Regulations in National      
Instrument 43-101, has reviewed and approved the information in this news       
release.                                                                        
Ferdi Dippenaar                                                                 
President and CEO                                                               
For additional details on Great Basin and its gold properties, please visit the 
Company`s website at www.grtbasin.com or contact Investor Services:             
Tsholo Serunye in South Africa                    27 (0)11 301-1800             
Michael Curlook in North America                  1 888 633-9332                
Barbara Cano at Breakstone Group in the USA       (646) 452-2334                
No regulatory authority has approved or disapproved the information contained in
this news release.                                                              
This release includes certain statements that may be deemed "forward-looking    
statements". All statements in this release, other than statements of historical
facts, that address possible future commercial production, reserve potential,   
exploration drilling results, development, feasibility or exploitation          
activities and events or developments that Great Basin Gold expects to occur are
forward-looking statements. Although the Company believes the expectations      
expressed in such forward-looking statements are based on reasonable            
assumptions, such statements are not guarantees of future performance and actual
results or developments may differ materially from those in the forward-looking 
statements. Factors that could cause actual results to differ materially from   
those in forward-looking statements include market prices, exploitation and     
exploration successes, continuity of mineralization, uncertainties related  to  
the ability to obtain necessary permits, licenses and title and delays due to   
third party opposition, geopolitical uncertainty, changes in government policies
regarding mining and natural resource exploration and exploitation, and         
continued availability of capital and financing, and general economic, market or
business conditions. Investors are cautioned that any such statements are not   
guarantees of future performance and those actual results or developments may   
differ materially from those projected in the forward-looking statements. For   
more information on the Company, Investors should review the Company`s annual   
Form 40-F filing with the United States Securities and Exchange Commission and  
its home jurisdiction filings that are available at www.sedar.com.              
Date: 11/08/2009 08:06:01 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: