Thu 10 Dec 2009, 17:00 SEP - Sephaku Holdings - Definitive Feasibility Study On The Proposed Nokeng
SEP
SEP                                                                             
SEP - Sephaku Holdings - Definitive Feasibility Study On The Proposed Nokeng    
    Fluorspar Mine Completed And Approved As A Competent Person`s Report        
Sephaku Holdings Limited                                                        
(Incorporated in the Republic of South Africa)                                  
(Registration number: 2005/003306/06)                                           
Share code: SEP                                                                 
ISIN: ZAE000138459                                                              
("Sephaku Holdings" or "the company")                                           
Definitive Feasibility Study on the proposed Nokeng fluorspar mine completed and
approved as a Competent Person`s Report                                         
In May 2009, the directors of Sephaku Holdings requested Venmyn Rand (Pty)      
Limited ("Venmyn") to complete an independently compiled Definitive Feasibility 
Study ("DFS") on the company`s proposed Nokeng fluorspar mine in the form of a  
Competent Person`s Report ("CPR") in accordance with the requirements of:       
-    the South African Code for the Reporting of Exploration Results, Mineral   
Resources and Mineral Reserves ("the SAMREC Code"); and                     
-    the South African Code for the Reporting of Mineral Asset Valuation ("the  
    SAMVAL Code").                                                              
The Nokeng mine is held by Nokeng Fluorspar Mine (Pty) Limited, which is a      
wholly owned subsidiary of Sephaku Fluoride (Pty) Limited, itself a wholly owned
subsidiary of Sephaku Holdings.                                                 
The Nokeng mine complex will comprise an open cast mining operation,            
concentrator plant, tailings disposal facility ("TDF") and associated           
infrastructure and services.  Sephaku Holdings intends to develop the Nokeng    
mine to produce on average 130,000tpa acid grade (97.2% CaF2) fluorspar (also   
referred to as acidspar) by the second quarter of 2012.                         
The proposed Nokeng mine will be located immediately south of the Vergenoeg mine
in the Gauteng Province of South Africa.  For purposes of the DFS, two locations
for the concentrator plant and TDF were considered:-                            
-    the "Base Case", on portion 11 of the farm Kromdraai 209JR ("Kromdraai");  
    and                                                                         
-    the "Alternative Option", on portion 1 of the farm Naauwpoort 208JR        
    ("Naauwpoort").                                                             
The Nokeng mine will exploit two geographically separated fluorspar deposits:-  
-    a haematite-fluorspar deposit in the northern region of Kromdraai,         
immediately south of the Vergenoeg mine, which has been named the Plattekop 
    deposit; and                                                                
-    a placer outwash fan further south, which straddles the Kromdraai and      
    Naauwpoort farm boundary. This deposit has been termed the Outwash Fan      
deposit.                                                                    
The Nokeng mine CPR focuses entirely on the "Base Case" option for the location 
of the concentrator plant and TDF.  In addition, the "Base Case" assumes:-      
-    mining will be performed entirely by the owner operator;                   
-    road transportation of all construction materials, reagents and product to 
    and from the Nokeng mine; and                                               
-    the following high level mine schedule:-                                   
    -    total life of mine ("LOM") of exactly 19 years, at an average run of   
mine ("ROM") feed rate of 600,000tpa;                                  
    -    maximum ROM throughput and CaF2 production rate of =708,000tpa and     
         =180,000tpa respectively;                                              
    -    overall CaF2 recovery from material from the Plattekop and Outwash Fan 
deposits of 85% and 75% respectively;                                  
    -    CaF2 content in the product of 97.2%;                                  
    -    feeding material solely from the higher grade Plattekop deposit for    
         the first 4 years (ore production is scheduled to commence in May      
2012);                                                                 
    -    feeding a blend of material from both the Plattekop and the Outwash    
         Fan deposits between years 5 and 9; and                                
    -    feeding material solely from the lower grade Outwash Fan deposit       
between years 10 and 19 (ore production is scheduled for completion at 
         end of April 2031).                                                    
Steffen Robertson Kirsten Consulting Engineers and Scientists ("SRK") performed 
Mineral Resource estimates on both Plattekop and Outwash Fan deposits. Mineral  
Reserve estimates, based on the SRK Mineral Resource estimates, on both         
Plattekop and Outwash Fan deposits were performed by Sound Mining Solutions     
(Pty) Limited  ("SMS") during the DFS, taking cognisance of all the required    
modifying factors, as prescribed by the SAMREC Code and determined during the   
DFS.                                                                            
Mineral Resource Estimate                                                       
The following table outlines the Mineral Resources of the Nokeng mine, as       
estimated by SRK according to the requirements of the SAMREC Code, and is       
considered to appropriately reflect the nature and technical parameters of both 
the Plattekop and Outwash Fan deposits:-                                        
DEPOSIT    TONNES (`000)  CONTAINED      CaF2 (%)                               
                         CaF2 (`000t)                                           
Inferred Mineral Resources                                                      
Plattekop  361.0          138.0          38.4%                                  
Outwash    0.0            0.0            0.0%                                   
Fan                                                                             
Sub-Total  361.0          138.0          38.4%                                  
Indicated Mineral Resources                                                     
Plattekop  2,917.0        1,236.0        42.4%                                  
Outwash    0.0            0.0            0.0%                                   
Fan                                                                             
Sub-Total  2,917.0        1,236.0        42.4%                                  
Measured Mineral Resources                                                      
Plattekop  0.0            0.0            0.0%                                   
Outwash    8,182.5        2,010.9        24.6%                                  
Fan                                                                             
Sub-Total  8,182.5        2,010.9        24.6%                                  
Total Mineral Resources                                                         
Total      11,460.5       3,384.9        29.5%                                  
Notes :                                                                         
1. Quoted at a cut-off grade of 15% CaF2.                                       
2. Plattekop based on April 2009 SRK Mineral Resource estimate.  Outwash Fan    
based on November 2008 SRK Mineral Resource estimate.                           
3. All tabulated data has been rounded to one decimal point for tonnage, grade  
and contained CaF2.                                                             
4. Mineral Resources are quoted inclusive of Mineral Reserves.                  
Mineral Reserve Estimate                                                        
The Mineral Reserve estimation by SMS was restricted to the two open pit designs
(Plattekop and Outwash Fan). The pit shells were determined from an open pit    
optimisation exercise, which indicated:-                                        
-    for the Plattekop pit, the mining sequence removes the Plattekop Hill, and 
    results in the establishment of a new surface topography; and               
-    the Outwash Fan pit can be mined to a maximum pit depth of 60m below       
    surface.                                                                    
The following table outlines the Mineral Reserves of the Nokeng mine, as        
estimated by SMS according to the requirements of the SAMREC Code. The total    
Mineral Reserves for the Nokeng mine are estimated at 12,194.7kt at an average  
grade of 27.2% CaF2, with 3,314.1kt of contained CaF2:-                         
DEPOSIT      TONNES (`000)   CONTAINED      CaF2 (%)                            
                            CaF2 (`000t)                                        
Proven Mineral Reserves                                                         
Plattekop    0.0             0.0            0.0%                                
Outwash Fan  9,065.1         2,055.1        22.7%                               
Sub-Total    9,065.1         2,055.1        22.7%                               
Probable Mineral Reserves                                                       
Plattekop    3,129.6         1,259.1        40.2%                               
Outwash Fan  0.0             0.0            0.0%                                
Sub-Total    3,129.6         1,259.1        40.2%                               
Total Mineral Reserves                                                          
Total        12,194.7        3,314.1        27.2%                               
Note:                                                                           
Based on an air dried basis                                                     
Capital and Operating Cost Estimates                                            
Capital and operating cost estimates were compiled by the respective Specialist 
Consultants, and only co-ordinated by Venmyn.  The total initial (pre-          
commissioning) capital expenditure required for the Nokeng mine was estimated at
a base date of 1 October 2009 at ZAR810.071m (+10%-10% accuracy) and excludes:  
growth allowance, escalation, contingencies, accuracy provisions, allowances for
ongoing capital expenditure and working capital. In addition, a total additional
capital provision of ZAR17.442m was allowed for in later years to purchase      
additional mining equipment to mine the Outwash Fan pit.                        
The total operating cost, based on an average annual concentrator plant         
throughput of 600,000tpa ROM, producing on average 130,000tpa acidspar, was     
estimated at ZAR1,333.09/t CaF2 produced (+10%-10% accuracy) at a base date of 1
October 2009.                                                                   
Valuation                                                                       
The valuation of the Nokeng mine conducted by Venmyn was based on the cash flow 
and market valuation approaches, using the following parameters:-               
-    a CaF2 price of USD314.48/t;                                               
-    a real discount rate of 12.0%; and                                         
-    an exchange rate of ZAR8.20/USD.                                           
Using the cash flow approach, Venmyn determined a "fair" (attributable) value   
for the Nokeng mine of ZAR279.338m, with an upper and lower valuation range of  
ZAR365.515m and ZAR193.161m respectively.                                       
The total Mineral Reserve tonnage for the Nokeng mine of 12.195Mt of ore, at an 
average grade of 27.2% CaF2, equates to 3.314Mt of contained CaF2. Applying the 
total Mineral Reserve tonnages for the Nokeng mine of 3.314Mt contained CaF2 to 
the respective ZAR/t CaF2 values determined from the recent disposal by Metorex 
Limited ("Metorex") of its interest in the Vergenoeg mine, the "fair"           
(attributable) value for the Nokeng mine using the market approach was          
determined as ZAR374.708m, with an upper and lower valuation range of           
ZAR401.892m and ZAR347.524m respectively.                                       
Venmyn, as the Competent Valuator, is of the view that the 25.5% discount to the
"fair" value when comparing the cash flow approach to the market approach is    
justified for the following reasons:-                                           
-    the Vergenoeg mine is a production property with a long history, compared  
to the Nokeng mine which is a development property;                         
-    the Mining Right Application and the Environmental Impact Assessment have  
    been submitted and accepted but the Environment Management Programme Report 
    is in process and has not been approved; and                                
-    the funding required for the Nokeng mine has not yet been secured.         
The Competent Valuator prefers the results of the cash flow approach to the     
market approach since there was only one transaction which was comparable with  
the Nokeng mine valuation i.e. the disposal by Metorex of its interest in the   
Vergenoeg mine.  Consequently, the concluding opinion of value for the Nokeng   
mine is based on the cash flow approach as follows:-                            
-    a "fair" value of ZAR279.338m; and                                         
-    an upper and lower valuation range of ZAR365.515m and ZAR193.161m          
respectively.                                                               
The "fair" value of ZAR279.338m equates to an internal rate of return (IRR) for 
the Nokeng mine of 20.9%.                                                       
Venmyn has approved the information presented above, in writing, to the board of
Sephaku Holdings.                                                               
Pretoria                                                                        
10 December 2009                                                                
Sponsor                                                                         
QuestCo Sponsors (Pty) Limited                                                  
Date: 10/12/2009 17:00:06 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: