AQUARIUS PLATINUM:  FOURTH QUARTER 2010 - PRODUCTION RESULTS TO 30 JUNE 2010    
Highlights                                                                      
-    Attributable production up 7% quarter-on-quarter to 110,474 4E ounces      
-    Average PGM Dollar prices improved - platinum up 5%, rhodium up 5% and     
palladium up 12%, against a backdrop of continued Rand strength             
-    Anton Lubbe appointed as Managing Director of principal South African      
    operating subsidiary                                                        
-    Implementation and successful re-audit of the ISO 9000 and 14000 and       
OSHAS 18000 management systems undertaken at Kroondal and Marikana          
-    Mine plan review in progress at the Blue Ridge mine                        
-    Regrettably, two fatalities at Blue Ridge during the quarter and five      
    more at Marikana in a single incident subsequent to the quarter end -       
Group-wide safety review underway (see recent separate disclosures and      
    Corporate Matters section below)                                            
                Q4 Operating Results Summary                                    
                Kroon   Marik   Everest   Blue   Mimosa    CTRP    Plat.        
dal     ana     *         Ridg                     Mile         
                                          e +                                   
4E PGM                                                                          
Production                                                                      
Total (100%      108,4   31,88   8,496     10,2   49,709    1,303   2,411       
basis)           38      9                 02                                   
Attributable     54,21   15,94   8,496     5,10   24,855    652     1,206       
                9       5                 1                                     
4E Basket Price                                                                 
R/oz             10,52   10,56   9,912     10,5    -        11,33   9,791       
                1       0                 06               3                    
$/oz             1,402   1,407   1,321     1,39   1,184     1,510   1,300       
9                                     
Cash Costs (4E                                                                  
basis)                                                                          
R/oz             6,037   6,583   9,150     -      n/a       5,927   8,473       
$/oz             805     877     1,219     -      640       790     1,125       
Cash Margin      31      28      (4)       -      54        18      13          
Stay-in-                                                                        
Business Capex                                                                  
R/oz             530     1,507   2,121     955    -         626     -           
$/oz             71      201     283       127     92       83      -           
* In ramp-up           + In development / capitalised                           
Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said:        
"The final quarter of the 2010 financial year has been positive overall, with   
production volumes better than those achieved in the previous quarter, and      
improved average PGM prices. Kroondal and Mimosa performed well during the      
period, which also saw the early and very promising restart of production from  
Everest. However, the quarter was not without its challenges. The two           
fatalities at the Blue Ridge mine in two separate incidents during the quarter  
have prompted us to review and overhaul the safety procedures at this mine,     
and Blue Ridge will also now undergo an extensive review to improve its long    
term mine plan. Marikana experienced a difficult quarter due to the             
intersection of potholes in the drill rig section, followed by the tragic       
accident at 4 Shaft shortly after the quarter end, and feed quality and supply  
volume to the tailings operations remained volatile, with a commensurate        
impact on their results. We are proactively resolving these issues, and we      
have renewed our commitment to best practice safety throughout our              
operations."                                                                    
Production by mine                                                              
PGMs (4E)         Quarter ended                                                 
                  Sep 2009    Dec 2009    March      June 2010                  
                                          2010                                  
Kroondal          88,808      108,254     103,071    108,438                    
Marikana          31,223      37,160      35,147     31,889                     
Everest           -           -           -          8,496                      
Blue Ridge        14,469      18,598      15,338     10,202                     
Mimosa            50,828      50,079      49,008     49,709                     
CTRP              1,740       2,087       1,268      1,303                      
Platinum Mile     5,932       8,539       2,737      2,411                      
Total             193,001     224,717     206,586    212,448                    
Production by mine attributable to Aquarius                                     
PGMs (4E)         Quarter ended                                                 
                  Sep 2009    Dec 2009   March       June 2010                  
                                         2010                                   
Kroondal          44,404      54,127     51,536      54,219                     
Marikana          15,611      18,580     17,574      15,945                     
Everest           -           -          -           8,496                      
Blue Ridge        7,235       9,299      7,669       5,101                      
Mimosa            25,414      25,039     24,504      24,855                     
CTRP              870         1,044      634         652                        
Platinum Mile     2,966       4,270      1,369       1,206                      
Total             96,500      112,359    103,286     110,474                    
Aquarius Group attributable production (PGM ounces) - quarters to 30 June 2010  
(Please refer to www.aquariusplatinum.com for graph)                            
Metals prices                                                                   
The strong PGM price momentum seen in the previous quarter continued into       
April and early May, driven by a recovering automobile sector and to some       
extent investment demand for the physically backed platinum and palladium       
Exchange Traded Funds (ETFs). The US Dollar price of platinum peaked for the    
financial year at $1,738 per ounce on the last day of April and first day of    
May this year.                                                                  
In mid May the Greek sovereign debt crisis reintroduced market uncertainty      
regarding the strength of the global economic recovery, and this was            
exacerbated by rumours of faltering growth in China and weaker-than-expected    
economic indicators reported by the USA. The situation in Greece in particular  
cast doubt on the wider European economy, which is the largest consumer of      
diesel passenger cars in the world. Because of its importance in diesel         
catalytic converters, the platinum price has been affected negatively by these  
events and the associated worsening in consumer sentiment. Uncertainty around   
the strength of the global recovery and European economy persists, and          
continuing market volatility is likely throughout the northern hemisphere       
summer.                                                                         
Despite the price of platinum falling 6% over the quarter and at one point      
losing over $200 per ounce, the volumes of both the physical platinum and       
physical palladium ETFs have remained encouragingly stable, increasing          
slightly in May and falling marginally in June. The platinum ETFs together      
continue to represent approximately 1m oz of underlying metal.                  
Platinum volumes on the Shanghai Gold Exchange (a proxy for Chinese platinum    
jewellery demand) spiked in May and were above average again in June, driven    
largely by recent price falls. Jewellery demand appears to be providing a       
floor for the platinum price of approximately $1,500 per ounce.                 
Switzerland remained a net exporter of platinum over the quarter, indicating    
continuing restocking by automobile manufacturers. Market consensus             
nonetheless continues to suggest a slowing in automobile demand which is        
likely to persist for some time, with sales of palladium-rich gasoline cars     
outperforming those of diesel cars.                                             
As a result of price strength early in the quarter, the average prices of the   
PGMs increased quarter-on-quarter. Platinum and rhodium each rose 5% on         
average, while palladium rose 12%. Gold rose by 8% over the period on average.  
All of the PGMs ended the quarter below the point at which they began,          
however, with platinum falling 6% to $1,532 per ounce, palladium down 9% to     
$446 per ounce and rhodium down 4% to $2,500 per ounce. Gold improved over the  
quarter, rising 11% to $1,243 per ounce.                                        
PGM prices by individual metal - 12 months to 30 June 2010                      
(Please refer to www.aquariusplatinum.com for graph)                            
Rand-Dollar exchange rate                                                       
The Rand remained broadly stable for yet another quarter, averaging R7.55 to    
the US Dollar, a depreciation of 0.4% compared to the average in the prior      
period. The Rand was stronger in April, weakening in May to a low of R7.97 to   
the US Dollar, before rising again in June to end the quarter under review at   
R7.62.                                                                          
Despite weaker PGM prices from mid May, average PGM basket prices once again    
strengthened at all operations in both currencies over the quarter. The US      
Dollar weighted average group basket price increased by 6% to $1,347 per 4E     
PGM ounce compared to the previous quarter, while the weighted average basket   
price at the South African operations was $1,394 per PGM ounce. The South       
African basket price is equivalent to R10,460 per PGM ounce at the average      
exchange rate for the period, a 5% increase over the second quarter. However,   
the South African basket price ended the quarter at R9,979 per PGM ounce, 2%    
lower than at the start of the period. The reduction in the basket price in     
the last portion of the quarter will result in a negative sales adjustment of   
approximately $2 million for this period.                                       
Rand-Dollar exchange rate - 12 months to 30 June 2010                           
(Please refer to www.aquariusplatinum.com for graph)                            
Average PGM basket prices achieved at Aquarius operations: US$ per 4E PGM       
ounce                                                                           
                 Basket prices (Quarter ended)                                  
Sep 2009    Dec 2009   March      June 2010                    
                                        2010                                    
Kroondal          972         1,163      1,328      1,402                       
Marikana          999         1,173      1,328      1,407                       
Everest           -           -          -          1,321                       
Blue Ridge        967         1,138      1,313      1,399                       
Mimosa            805         910        1,074      1,184                       
CTRP              1,074       1,266      1,456      1,510                       
Platinum Mile     1,004       1,192      1,308      1,300                       
Aquarius Group    931         1,094      1,267      1,347                       
average                                                                         
PGM basket prices (Dollar and Rand per 4E PGM ounce) - 12 months to 30 June     
2010                                                                            
(Please refer to www.aquariusplatinum.com for graph)                            
AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum 100%)             
P&SA 1 at Kroondal                                                              
Safety, Health and Environmental                                                
-    The 12-month rolling average disabling injury incidence rate (DIIR per     
    200,000 hours) was 0.57 for the quarter and 0.54 for the 2010 financial     
    year, a 23% improvement on the Q4 2009 rate of 0.74                         
-    During the quarter, Kroondal achieved 18 months without a fatal accident   
-    ISO 9000 and 14000 and OSHAS 18000 management systems implemented and      
    successfully re-audited                                                     
Mining                                                                          
-    Production tonnes for the quarter increased by 11% to 1,635,594 tonnes     
-    Head grade improved from 2.56 g/t to 2.61g/t                               
Processing                                                                      
-    Tonnes processed increased by 2% to 1,604,734 tonnes                       
-    Recoveries increased by 2% to 81%                                          
-    PGM production increased by 5% to 108,438 4E PGM ounces (54,219 4E PGM     
    ounces attributable)                                                        
P&SA1 at Kroondal PGM production and Rand cash costs per PGM ounce (100%)       
(Please refer to www.aquariusplatinum.com for graph)                            
Revenue                                                                         
Revenue for the quarter decreased by 3% to R951 million (R476 million           
attributable) due to negative sales adjustments as a result of the weakening    
of metal prices and stronger Rand in the last weeks of the quarter.             
The Kroondal US Dollar-denominated basket price improved by 6% compared to the  
previous quarter to an average of $1,402 per PGM ounce.  The Rand/Dollar        
exchange rate decreased slightly on average to R/$7.50.                         
Operations                                                                      
The number of mining shifts increased from 65 in Q3 to 69 in Q4, and as a       
result the on-reef stoping square metres mined increased by 5% and primary      
development (currently at 3,388 metres) increased by 6% during the quarter.     
Overall tonnes hoisted increased by 11% to 1,635,594 tonnes for the quarter.    
Improved mining volumes assisted in increasing the amount of ore sent to the    
stockpile. Overall volumes processed improved by 2% to 1,604,734 tonnes with    
stockpiles at the end of the quarter totalling approximately 56 thousand        
tonnes.                                                                         
Off-reef mining increased from 1.1% of the on-reef square meters mined to 4.0%  
as more unforeseen geological structures were encountered. Recoveries           
increased from 79% to 81% as a result of a more stable metallurgical operating  
regime.                                                                         
PGM production increased by 5% to 108,438 4E PGM ounces (54,219 4E PGM ounces   
attributable).                                                                  
Kroondal: Metal in concentrate produced (PGM ounces)                            
Quarter   Pt      Pd      Rh      Au     PGMs    Attributable                   
ended                                            to Aquarius                    
Jun 2010  63,803  32,324  11,789  522    108,43  54,219                         
                                        8                                       
Mar 2010  60,580  30,729  11,228  534    103,07  51,535                         
                                        1                                       
Dec 2009  63,772  32,153  11,808  521    108,25  54,127                         
                                        4                                       
Sep 2009  52,287  26,366  9,708   447    88,808  44,404                         
Operating cash costs                                                            
Mining cash costs increased by 6% to R408 per tonne, and costs per PGM ounce    
increased by 2% to R6,037. Absolute operating costs increasing from R609        
million to R655 million for the quarter, as a result of higher electricity      
cost due to the winter tariffs and engineering cost (major repairs). The        
increased average PGM basket price was offset by the reduction of the basket    
price in the last month of the quarter resulting in a negative sales            
adjustment. This reduced Kroondal`s cash margin for the period from 38 % to     
31%.                                                                            
Kroondal: Operating cash costs per ounce                                        
          4E              6E                  6E net of by-                     
(Pt+Pd+Rh+Au)   (Pt+Pd+Rh+Ir+Ru+Au) products                          
                                              (Ni&Cu)                           
Kroondal   R6,037          R4,942              R4,806                           
Capital expenditure                                                             
Capital expenditure for the quarter was R57 million (R530 per PGM ounce). This  
was due to underground infrastructure enhancement and the establishment and     
mobilising of the K6 project.                                                   
P&SA2 at Marikana                                                               
Safety, Health and Environmental                                                
-    The 12-month rolling average disabling injury incidence rate (DIIR per     
    200,000 hours) was 0.74 and is a 19% improvement on Jun 2009 (0.91)         
-    ISO 9000 and 14000 and OSHAS 18000 management systems implemented and      
successfully re-audited                                                     
-    Marikana achieved 17 fatality free months during the quarter; however on   
    6 July 2010 a serious accident occurred at the mine in which 5 people       
    tragically lost their lives                                                 
-    A detailed note on the fall of ground incident referred to above is        
    included in the Corporate Matters section of this quarterly report          
Mining                                                                          
-    Production tonnes decreased by 1% to 521,712 tonnes, comprising 361,358    
tonnes from underground and 160,354 from open-pit operations                
-    Head grade increased by 4% to 2.68g/t                                      
Processing                                                                      
-    Tonnes processed decreased by 10% to 505,631 tonnes                        
-    Recoveries decreased by 3% to 73%                                          
-    PGM production decreased by 9% to 31,889 4E PGM ounces (15,944 4E PGM      
    ounces attributable)                                                        
P&SA2 at Marikana PGM production and Rand cash costs per PGM ounce (100%)       
(Please refer to www.aquariusplatinum.com for graph)                            
Revenue                                                                         
Revenue at Marikana decreased by 15% to R292 million (R146 million              
attributable) due to negative sales adjustments as a result of the weakening    
of metal prices and a stronger Rand in the last weeks of the quarter, as well   
as a reduction in production.                                                   
The Marikana US Dollar-denominated basket price averaged $1,407 per PGM ounce,  
6% higher than the previous quarter.                                            
Operations                                                                      
Marikana Mine production was negatively affected by the intersection of         
potholes in the drill rig section. Primary development increased by more than   
50% to negate the negative effect of the high geological losses, resulting in   
a significant stay-in-business capital expenditure increase.                    
Processed tonnes mirrored the mining tonnes with total volumes processed at     
505,631 tonnes, 10% lower than in the previous quarter.                         
The head grade improved by 4% to 2.68g/t, as development activities at 5 Shaft  
are now on reef, as explained in the previous quarter.                          
Recoveries were 3% lower at 73%, due to instability in the plant operation as   
a result of intermittent feed.                                                  
PGM production for the quarter decreased by 9% to 31,889 4E PGM ounces (15,944  
4E PGM ounces attributable).                                                    
Marikana: Metal in concentrate produced (PGM ounces)                            
Quarter   Pt       Pd       Rh       Au      PGMs     Attributable              
ended                                                 to Aquarius               
Jun 2010  19,163   9,114    3,423    190     31,889   15,945                    
Mar 2010  21,007   10,236   3,698    206     35,147   17,574                    
Dec 2009  22,838   10,470   3,642    209     37,160   18,580                    
Sep 2009  19,515   8,407    3,100    200     31,222   15,611                    
Operating cash costs                                                            
Cash costs decreased by 7% to R415 per tonne, while costs per PGM ounce         
decreased by 8% to R6,583 as a result of a reduction in stripping ratio from    
27:1 to 14:1 in the open pit as the pit approaches its end of life.             
Underground costs fell as a result of a positive variable cost variance         
because fewer tonnes were mined. Number 1 Shaft (within the pit) at Marikana    
is currently under operating review, as it is currently not contributing        
sufficiently at spot prices. This shaft currently accounts for approximately    
8% of Marikana`s overall production.                                            
Gross revenue decreased by 15% to R292 million as a result of negative sales    
adjustments and a reduction in the ounces produced, resulting in a cash margin  
of 28%.                                                                         
Marikana: Operating cash costs per ounce                                        
         4E               6E                   6E net of by-                    
         (Pt+Pd+Rh+Au)    (Pt+Pd+Rh+Ir+Ru+Au)  products                         
                                               (Ni&Cu)                          
Marikana  R6,583           R5,387               R5,146                          
Capital expenditure                                                             
Stay-in-business capital expenditure totalled R48 million (R1,507 per PGM       
ounce), an increase of 125%. Capital costs increased because of increased       
equipping of infrastructure and development of the Marikana 5 Shaft.            
Contractor dispute with Moolman Mining                                          
As disclosed in previous Aquarius Platinum quarterly updates, this dispute has  
been referred to the courts and provisional dates in September 2010 have been   
allocated for the trial.                                                        
Everest Mine                                                                    
Safety, Health and Environmental                                                
-    No lost time injuries were recorded during the quarter                     
-    The 12 month rolling DIIR for the period was 0.31                          
Operations                                                                      
Phase 2 of the re-establishment project progressed well for the quarter with    
95% of the work completed.                                                      
The establishment of permanent underground services, the reclamation of         
infrastructure, and the equipping of declines and strike sections have all      
been completed. The completion of this infrastructure resulted in early         
delivery of ore from underground and a total of 107,289 tonnes were hoisted     
during this quarter, which is 72% above the initial plan.                       
The overland conveyor belt and chairlift is 95% complete with final touches     
still being applied. Work is scheduled to be completed at the end of July       
2010.                                                                           
Work at the Valley box cut commenced during the quarter. Box cut excavation     
and access road construction is in progress, with completion targeted for the   
end of August 2010. 81,542 tonnes of opencast ore was mined from the remnant    
section around the collapsed decline system during the quarter, bringing        
mining for the quarter to 188,831 tonnes (199,503 for the full year).           
Construction of the Chromite Spiral Plant was completed at the end of May and   
commissioning was completed at the end of June.  The Spiral Plant is currently  
running within the designed criteria.                                           
The processing plant was recommissioned in May with 150,279 tonnes processed    
for the quarter at a grade of 3.09g/ton. A total of 8,496 ounces were produced  
at a recovery rate of 57%. The recovery was negatively affected by the initial  
open pit material which was oxidized, and by challenges experienced with the    
plant PLC system during re-commissioning.                                       
Capital Expenditure                                                             
The total re-establishment project capital (both Phase 1 and Phase 2 as         
previously announced) amounts to R265 million. Project expenditure is within    
budget, at a total of R87 million for the quarter, bringing the project         
expenditure for the year to R217 million. On mine capital projects expenditure  
amounted to R 30.3 million for the year, mainly for the construction of the     
Chrome Spiral plant (R21.2 million), and also for the re-establishment of the   
main decline belts (outside the scope of the project) and the Hoogland EIA      
study.                                                                          
MIMOSA INVESTMENTS (Aquarius Platinum - 50%)                                    
Mimosa Platinum Mine                                                            
Safety                                                                          
-    The 12-month rolling average DIIR for the period improved to 0.07 from     
    0.09 in the previous quarter                                                
-    Zero lost-time injuries were recorded during the quarter under review      
Mining                                                                          
-    Underground production increased by 16% to 563,976 tonnes                  
-    Head grade was static at 3.60g/t                                           
Processing                                                                      
-    Concentrator plant recoveries decreased slightly to 75.7% from 76.1%       
-    Total mine production increased to 49,709 4E PGM ounces (24,855 4E PGM     
    ounces attributable)                                                        
-    The surface stockpile decreased to a total of 72,117 tonnes at the end of  
the quarter                                                                 
Mimosa Mine PGM Production & $ Cash Cost per PGM Ounce (100%)                   
(Please refer to www.aquariusplatinum.com for graph)                            
Revenue                                                                         
The average achieved PGM basket price for the quarter increased by 10% to       
$1,184 per PGM ounce, while the average achieved nickel price increased by 28%  
to $10.34 per pound. Revenue for the quarter increased to $72 million, with     
base metals accounting for approximately 25% of this. A $5 million positive     
price adjustment is included in revenue for the quarter.                        
The cash margin increased to 54% from 49% in the previous quarter, mainly due   
to stronger average metal prices.                                               
Operations                                                                      
Mimosa mining operations hoisted 563,976 tonnes of ore in the current period    
compared to 486,804 tonnes in the previous quarter. Volumes milled and          
processed totalled 567,845 tonnes, with 3,869 tonnes being taken from the       
stockpile. As a result the surface stockpile totalled 72,117 tonnes at the      
quarter end.                                                                    
The average plant head grade was static at 3.60g/t, and recoveries decreased    
to 75.7% from 76.1% in the previous quarter.                                    
As a result of these factors, PGM production increased by 2% to 49,709 4E PGM   
ounces (24,855 4E PGM ounces attributable) during the quarter, with base        
metals production rising by a similar margin.                                   
Mimosa: PGMs in concentrate produced (ounces)                                   
Quarter    Pt       Pd      Rh      Au     PGMs     Attributable                
ended                                               to Aquarius                 
Jun 2010   25,264   19,053  1,999   3,393  49,709   24,855                      
Mar 2010   24,898   18,744  1,972   3,394  49,008   24,504                      
Dec 2009   25,388   19,237  2,012   3.442  50,079   25,039                      
Sep 2009   25,691   19,569  2,096   3,473  50,829   25,414                      
Mimosa: Base metals in concentrate produced (tons)                              
            Mine production           Attributable to Aquarius                  
Quarter      Ni       Cu      Co       Ni       Cu       Co                     
ended                                                                           
Jun 2010     691      565     19       346      283      10                     
Mar 2010     685      561     19       343      281      10                     
Dec 2009     695      574     19       348      287      10                     
Sep 2009     705      572     19       353      286      10                     
Operating cash costs                                                            
During the quarter, cash costs decreased by 4% to $56 per ROM tonne, and costs  
per PGM ounce decreased by 3% to $640. This was largely as a result of cost     
saving initiatives that are being implemented in the mine.                      
Net of by-products, cash costs were $265 per PGM ounce, compared with $333 per  
PGM ounce in the previous quarter, primarily due to the decrease in operating   
cash costs.                                                                     
Mimosa operating cash costs per ounce                                           
         4E               6E                   4E net of by-                    
         (Pt+Pd+Rh+Au)    (Pt+Pd+Rh+Ir+Ru+Au)  products                         
                                               (Ni, Cu & Co)                    
Mimosa     $640            $607                 $265                            
Economic and Political Update                                                   
The inclusive government continues to function and there is continued hope      
that this will result in an improved economic environment. In the 2010 Mid      
Term Fiscal Policy Statement which was presented on 14 July 2010, royalties on  
precious metals were increased from 3.5% to 4% of gross revenue while that      
applied to base metals remained unchanged. The minister indicated that the      
multicurrency regime would continue until 2012. Inflationary pressures from     
wage increases, public utility charges and the strengthening of the South       
African Rand against the US dollar caused the inflation figure to reach 6.1%    
in May 2010 from 0.7% in January 2010. The US dollar and South African Rand     
remain the most widely used currencies in the economy.                          
A draft revised Income Tax Act was published in June 2010 for comments. The     
proposed changes include restrictions on deductible expenditure for taxable     
income, and changing the Special Initial Allowance for mining entities from     
100% in the year of expenditure to 25% over four years. However, the income     
tax rate for mines remained unchanged at 25%.                                   
Update on the Indigenisation Bill                                               
Following the signing into law of the Indigenisation Bill, companies were       
required to submit to the Zimbabwean Ministry of Youth Development,             
Indigenisation and Economic Empowerment their indigenisation plans and          
proposals by 15 April 2010. As reported last quarter, Mimosa has complied with  
this requirement. There have been no formal developments since then in respect  
of the Indigenisation Bill.                                                     
RIDGE MINING LIMITED                                                            
Blue Ridge Platinum Mine (Aquarius Platinum - 50%)                              
Safety                                                                          
-    The 12-month rolling average DIIR for the quarter deteriorated to 1.86     
from 1.43 in the previous quarter                                           
-    Regrettably, 2 fatalities occurred in two separate incidents during June   
-    Senior management personnel changes and a safety review at Blue Ridge      
    have been initiated                                                         
Mining                                                                          
-    Production from underground operations increased by 20% to 162,526 tonnes  
-    Head grade improved to 2.32 g/t                                            
-    Surface stockpiles largely depleted at the end of the quarter              
Processing                                                                      
-    Tonnes processed decreased by 40% to 179,209 tonnes due largely to         
    depleted stockpiles                                                         
-    Recoveries increased from 72% to 76%                                       
-    PGM production decreased by 33% to 10,202 ounces (5,101 ounces             
    attributable to Aquarius)                                                   
Revenue                                                                         
Revenue for the quarter decreased by 35% to R96.5 million (R48 million          
attributable to Aquarius) as a result of lower PGM production. The achieved     
mine basket price for the quarter improved by 6% to an average of $1,399 per    
PGM ounce.                                                                      
Operations                                                                      
Following the two fatalities that occurred during June a decision was taken by  
Aquarius to halt all operations at the Blue Ridge mine for a two week period,   
during which time all employees were retrained. All codes of practice, safe     
operating procedures and base line risk assessments were reviewed. All          
employees were taken through a "Stop Think" behaviour program which included    
an industrial theatre performance and a workshop on the importance of           
reporting injury incidence. Staged mock ups were erected showing the dangers    
associated with 10 cardinal rules of safety. The section 54 suspension which    
was issued was lifted on 25 June and mining recommenced on 29 June.             
Production for the 4th quarter saw the initiation of the managed contract       
model at Blue Ridge, as used throughout Aquarius` other South African           
operations. By the first day of the quarter all relevant mining personnel were  
formally employed by Murray and Roberts Cementation.                            
Extremely high levels of labour turnover were experienced at the beginning of   
the quarter, largely due to the active poaching of skilled personnel by         
competitors. This had a negative effect on the production achieved overall.     
This was exacerbated by the loss of 22 production days as a result of section   
54 stoppages imposed by the DMR during their eight inspections of the mine      
during the quarter.                                                             
Underground mining for the quarter improved from the 135,621 tonnes achieved    
in the previous quarter to 162,526 tonnes.                                      
As a result, processed tonnes at 179,209 tonnes were materially lower than the  
297,826 treated in the previous quarter, as surface stockpiles were depleted    
and only ROM material was processed.                                            
The head grade improved to 2.32g/t from 2.24g/t, an improvement of 4%.          
PGM production was 10,202 PGM ounces (5,101 ounces attributable to Aquarius).   
Development improved compared to the previous quarter.  Primary development     
achieved was 1,681m for the quarter against the 1,513m achieved for the         
previous quarter.                                                               
Blue Ridge: Metal in concentrate produced (PGM ounces)                          
Quarter   Pt      Pd     Rh     Au    PGMs       Attributable                   
ended                                                                           
to Aquarius                     
Jun 10    6,144   2,995  963    100   10,202     5,101                          
Mar 10    9,237   4,499  1,452  150   15,338     7,669                          
Dec 09    11,201  5,454  1,762  181   18,598     9,299                          
Sep 09    8,598   4,383  1,347  141   14,469     7,235                          
Operating cash costs                                                            
Total operating expenditure during the quarter amounted to R96 million, a 24%   
decrease on the previous quarter. Blue Ridge remains in project phase, and as   
a result operating expenditure continued to be capitalised during the quarter.  
The resultant capitalisation of costs and revenue to the project (including     
finance costs) amounted to R34 million for the quarter (on a 100% basis).       
Update on review of Blue Ridge business plan                                    
Further to the announcement on 1 July 2010 regarding the safety review at the   
Blue Ridge mine, the shareholders (Aquarius and Imbani Platinum) are now in     
the process of finalising a substantially revised Life of Mine business plan    
to optimise the operation. The current lower Rand 4E basket price at Blue       
Ridge and the ongoing focus on safe mining operations has necessitated the      
initiation of a fundamental redevelopment programme at the mine, which is       
expected to run for a 10 to 12 month period. This optimisation programme will   
focus on mine access, ore and waste mass flows. It will provide for a third     
mine access point and reinstates the construction of a second decline, the      
plans for which were shelved by the prior managers. Underground waste surge     
capacity infrastructure and aggressive on- and off-reef development will also   
be provided for. The redevelopment programme is focused on the efficient and    
sustainable operation of the mine in the medium and long term.                  
The shareholders of Blue Ridge Platinum Mine are currently evaluating a number  
of options for the execution of this programme. Given certain short term        
geological and mining infrastructure limitations, management has proposed that  
one of the options to be considered is the termination of production at the     
mine for up to seven months. This will provide a period to be used exclusively  
for the implementation of fundamental mining infrastructure alterations and     
key development initiatives on the mine. It is management`s view that this      
option will prove the most cash-efficient. Blue Ridge will continue to be       
treated as a project for accounting purposes throughout this process.           
If the proposed optimisation plan for Blue Ridge is approved by its             
shareholders and implemented as described above, the expected PGM production    
from Blue Ridge for the 2011 financial year will be substantially lower than    
guided, pending conclusion of the plan. Management is committed to the          
redevelopment of the Blue Ridge mine in the short term, in order to realise     
its potential as a safe, sustainable and profitable mine in the medium and      
long term, and to ensure its survival in the current market conditions.         
AQUARIUS PLATINUM (SA) CORPORATE SERVICES (PTY) LTD                             
Chromite Tailings Retreatment Plant (CTRP) (ACS (SA) - 50%)                     
Safety                                                                          
-    The DIIR remained at zero for the quarter.                                 
Resource development                                                            
Treatment of material from one of the recently acquired tailings dams           
commenced during the quarter. The material proved to be challenging to treat    
in that it was more oxidised than expected and necessitated a number of         
circuit changes to be undertaken in the CTRP plant to accommodate the change    
in feed material characteristics. Aquarius believes that the changes that have  
now been made to the plant will deliver improved results going forward.         
Processing                                                                      
Material processed decreased by 1% to 75,000 tonnes                             
Grade increased by 22% to 2.50g/t - but this grade was influenced by higher     
levels of oxidation                                                             
Recoveries decreased by 14% to 22%                                              
Production increased by 3% to 1,303 4E PGM ounces (652 ounces attributable)     
CTRP PGM production and Rand cash costs per PGM ounce (100%)                    
(Please refer to www.aquariusplatinum.com for graph)                            
Revenue                                                                         
The achieved mine basket price for the quarter averaged $1,510 per PGM ounce,   
4% higher than the previous period.                                             
Operations                                                                      
Material processed decreased slightly to 75,000 tonnes for the quarter, at a    
higher head grade of 2.50g/t. Recoveries decreased to 22% from 25% in the last  
quarter. The higher grade material was sourced from the treatment of a new      
tailings dam in the Kroondal area. However, the new dam has higher levels of    
oxidation which led to lower recoveries over the quarter. The net result was a  
marginal increase in the production of 4E ounces to 1,303 PGM ounces (652 PGM   
ounces attributable).                                                           
CTRP: Metal in concentrate produced (PGM ounces)                                
Quarter ended  Pt      Pd    Rh   Au    PGMs      Attribut                      
                                       (4E)      able to                        
                                                 Aquarius                       
Jun 2010       800     297   203  3     1,303     652                           
Mar 2010       777     279   210  3     1,268     634                           
Dec 2009       1,267   464   353  4     2,087     1,044                         
Sep 2009       1,048   381   308  3     1,740     870                           
Operating costs                                                                 
Cash costs increased by 32% to R5,927 per PGM ounce primarily as a result of    
the costs of transporting feed material to the CTRP plant, important circuit    
changes effected in the plant and higher than usual levels of maintenance and   
equipment replacement in the plant.                                             
Capital Expenditure                                                             
Capital expenditure in the plant over the quarter was approximately R816,000.   
The cash margin for the period was 18%, down from 55% in the previous quarter.  
CTRP Operating cash costs per ounce                                             
4E               6E                   4E net of by-                     
        (Pt+Pd+Rh+Au)    (Pt+Pd+Rh+Ir+Ru+Au)  products                          
                                              (Ni, Cu& Co)                      
CTRP     R5,927           R4,208               n/a                              
Platinum Mile Resources (ACS (SA) - 50%)                                        
Safety                                                                          
-    The DIIR was zero for the quarter                                          
Processing                                                                      
-    Tailings processed totalled 1,203 million tonnes.                          
-    PGM grade was 0.57g/t, an increase of 12% on the previous quarter          
-    Production was 2,411 4E PGM ounces (1,206 ounces attributable)             
Platinum Mile PGM production and Rand cash costs per PGM ounce (100%)           
(Please refer to www.aquariusplatinum.com for graph)                            
Revenue                                                                         
Revenue decreased to R23 million (R11.5 million attributable). The achieved     
mine basket price for the quarter averaged $1,300 per PGM ounce, 2% lower than  
the previous quarter.                                                           
Operations                                                                      
Production levels decreased by only 12% during the quarter despite 35% lower    
volumes processed. Recoveries increased to 12%, an increase of 33% on the       
previous quarter. The head grade of the tailings processed increased to         
0.57g/t from 0.51g/t in the previous quarter. Merensky reef tailings were       
received and treated throughout the quarter, while no UG2 tailings were         
treated in May or June due to low grades.                                       
As a result of lower volumes processed, production fell to 2,411 4E PGM ounces  
(1,206 4E PGM ounces attributable).                                             
Options to improve metal output from Platinum Mile are being explored by        
securing additional feed from Kroondal`s K1 and K2 operations.                  
Platinum Mile: Metal in concentrate produced (PGM ounces)                       
Quarter     Pt    Pd    Rh    Au    PGMs      Attributable                      
ended                               (4E)      to Aquarius                       
Jun 2010    1,45  694   192   73    2,411     1,206                             
2                                                                    
Mar 2010    1,60  835   243   58    2,737     1,369                             
           1                                                                    
Dec 2009    4,95  2,64  769   170   8,539     4,269                             
3     7                                                              
Sep 2009    3,44  1,83  534   119   5,932     2,966                             
           0     9                                                              
Operating costs                                                                 
Cash costs were R8,473 per PGM ounce, marginally higher than the R8,236 per     
PGM ounce the previous quarter.                                                 
Platinum Mile operating cash costs per ounce                                    
          4E              6E                  4E net of by-                     
(Pt+Pd+Rh+Au)   (Pt+Pd+Rh+Ir+Ru+Au) products                          
                                              (Ni, Cu& Co)                      
Platinum   R8,473          R6,713              n/a                              
Mile                                                                            
Capital expenditure                                                             
Capital expenditure was zero for the quarter.                                   
CORPORATE MATTERS                                                               
Appointment of Managing Director of Aquarius Platinum (South Africa) (Pty) Ltd  
("AQPSA")                                                                       
Aquarius is pleased to announce that Mr Anton Lubbe has been confirmed in the   
role of Managing Director of AQPSA, with effect from 1 August 2010. Mr Lubbe    
replaces Hugo Holl, who resigned in March. Mr Lubbe was previously Operations   
Director for Aquarius` Western Limb Operations, and has been Acting Managing    
Director of AQPSA since Mr Holl`s departure.                                    
Mr Lubbe has 29 years of mining experience, with exposure to gold, platinum,    
chrome and copper. He has 10 years of experience as a General Manager, three    
years as Divisional Director New Business for DRDGOLD, and three years          
contracting experience as Operations Director of JIC (Mining). He also served   
on the boards of DRDGOLD and its subsidiaries, and Westdawn Investments         
(Trading as JIC Mining). He joined AQPSA in October 2008.                       
Other AQPSA appointments                                                        
Paul Smith has been appointed Director: New Business, Projects and Long-Range   
Planning, a new AQPSA Board position. He transfers into AQPSA from Aquarius     
Corporate Services (South Africa), a Group company that is due to be absorbed   
into AQPSA in due course.                                                       
Mkhululi Duka has been appointed as Director: Human Capital, a new AQPSA Board  
position. Prior to this appointment he was General Manager: Human Resources     
and Transformation, based at Kroondal.                                          
Abraham van Ghent has been appointed as Senior General Manager - Operations,    
an AQPSA Executive position responsible for operations on all AQPSA managed     
mines in South Africa. Prior to this appointment he was General Manager:        
Kroondal.                                                                       
A new General Manager for Kroondal will be appointed in due course.             
Safety Initiatives - Marikana Mine Multiple Fatal Accident - 6 July 2010        
(to be read in conjunction with Aquarius` announcement released on 26 July      
2010 regarding the lifting of the s54 suspension notice at Marikana)            
Summary of Events                                                               
On 6 July 2010 at approximately 6:30pm, a block of ground measuring 18.6m long  
by 5.4m wide by 1.7m thick fell from the hanging wall (roof of mine shaft) in   
Workplace 75S of 4 Shaft at the Marikana Platinum Mine on the Western Limb of   
the Bushveld Igneous Complex near Rustenburg, South Africa. Workplace 75S is    
70 vertical metres deep, which is relatively shallow in the context of          
platinum mining. This fall of ground killed five employees and injured two      
others. The employees were busy drilling the working face at the time of the    
accident.                                                                       
Persons involved and affected by the tragic incident were given psychological   
counselling. The families have been assisted with funeral arrangements and      
financial benefits.                                                             
A memorial ceremony was held in association with the relevant trade unions and  
other employee associations and local government, and attended by the           
workforces of both the Kroondal and Marikana mines. The memorial was also       
attended by the Minister of Mines, Ms. Susan Shabangu.                          
As announced at the time, the Department of Mineral Resources ("DMR") issued a  
s54 suspension notice in respect of Marikana 4 Shaft, and thereafter            
instructed all mining operations employing the bord and pillar mining method    
(as used at Marikana and other Aquarius operations) in the North West area to   
reduce their bord widths to 6m. This instruction was clarified after a meeting  
with the DMR to mean that mines using bords wider than 6m were required to      
present action plans to move to more safe and conservative mining methods.      
Aquarius duly presented action plans in respect of Marikana 4 Shaft to the DMR  
on Thursday 22 July, and these were mutually agreed. Aquarius is currently      
rolling these new measures out at its Kroondal and Marikana mines, while it     
continues to review its safety practices at the Everest and Blue Ridge mines.   
What follows below is a summary of the current generally accepted safety        
design methodology for mines in the Bushveld Igneous Complex, and the new       
initiatives and measures that AQPSA plans to implement in order to modify it    
to world best practice.                                                         
Current Generally Accepted Mine Design Methodologies                            
AQPSA currently design stope hanging wall systems using the generally accepted  
methodologies (the "Standard Design Methodologies") laid out in South African   
rock engineering handbooks that, with respect to stope hanging wall support     
design, are supported by the Safety in Mining Research Advisory Council         
("SIMRAC") sponsored research reported in Project Reports GAP 032 and GAP 067   
(the "Standard References").                                                    
The Standard References and the Standard Design Methodologies suggest that the  
heights of hanging wall failure in South African platinum mines rarely exceed   
one metre above a cut reef hanging wall, however -                              
-    databases of the heights of failure above a cut reef hanging wall should   
    be compiled on a mine-specific basis (Figure 1);                            
-    within the scope of design, consideration should be given to any           
preferential parting plane or planes/plane or planes of weakness that       
    might exist in a hanging wall sequence;                                     
-    designs (support lengths and densities) should be based on the height of   
    failure that encompasses 95 percent of all the recorded falls-of-ground     
at a mine in question/of interest (the "95 Percent Rule"); and              
-    site-specific criteria should be defined, adopted and applied to assess    
    additional support requirements for the remaining five percent of           
    assessed heights of failure, based on site-/location-specific rock mass     
ratings (either the RMR, Q or MRMR system, as appropriate or preferred).    
The Standard References also describe the methodologies for the design of       
minimum safe tendon and bolt lengths and maximum safe support densities for     
the assessed design height of instability, which methodologies may reasonably   
be described as being consistent with standard rock engineering practice.       
Figure 1 - AQPSA`s Fall-of-Ground Database for Marikana Platinum Mine           
(Please refer to www.aquariusplatinum.com for figure 1)                         
Although the AQPSA database suggests that for the 95 Percent Rule, the maximum  
height of failure is less than 0.5 m, the design maximum height is 1.0 m.  The  
designed standard support systems encompass 1.5 m long, 18 mm diameter resin    
grouted and tensioned rebar bolts.  The design concept is based on the          
reinforced Voussoir arch concept, illustrated in Figure 2.  Stability           
assessments are undertaken for the standard bord width of 10 metres.            
Figure 2 - An Illustration of the Reinforced Voussoir Arch Concept              
(Please refer to www.aquariusplatinum.com for figure 2)                         
The remaining five percent of potential falls of ground are covered by a        
management system (Trigger Actions and Response, or TARP) that relies on the    
assessment of instability potential and the additional support required to      
overcome the assessed risk (Figure 3).                                          
Figure 3 - A Summary of AQPSA`s TARP System (for illustrative purposes)         
(Please refer to www.aquariusplatinum.com for figure 3)                         
New safety measures adopted                                                     
AQPSA is now proposing to move to hanging wall stope support systems that       
cover 100% of the potential fallout height.  The means and methods of           
accomplishing this are being developed in conjunction with an international     
mining consultant.  Additional work is required before the methods and systems  
can be finalised, but at present, where the potentially unstable layer is less  
than 2 m thick (which covers the majority of AQPSA`s mines), support design is  
based on the suspension method (Figure 4).  Where the potentially unstable      
layer is found to be more than 2 m thick, it will be reinforced with cable      
anchors.                                                                        
Figure 4 - An Example of the Suspension Method of Hanging Wall Support          
(Please refer to www.aquariusplatinum.com for figure 4)                         
In addition, the TARP system has been enlarged to include remote sensing of     
the hanging wall mass to identify the position of key controlling rock mass     
features and any anomalous geology.  Instruments to monitor rock mass movement  
will also be installed.                                                         
Figure 5 - Ground Penetrating Radar and a Ground Movement Meter                 
(Please refer to www.aquariusplatinum.com for figure 5)                         
As part of an integrated design package, the mining layouts have been modified  
to a room and pillar system, to minimize instability risk and at the same time  
maintain a productive mining environment.  The principal jointing directions    
(Figure 6) have been fully considered within the scope of the layout designs,   
such that the pillars will now intersect these.                                 
Figure 6 - The Dominant Jointing Directions at AQPSA`s Western Bushveld Mines   
(Please refer to www.aquariusplatinum.com for figure 6)                         
More information on all corporate matters can be found at                       
www.aquariusplatinum.com                                                        
Statistical Information: Kroondal P&SA1                                         
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Marikana P&SA2                                         
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Mimosa                                                 
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Everest                                                
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Blue Ridge                                             
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Chrome Tailings Retreatment Plant                      
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Statistical Information: Platinum Mile                                          
(Please refer to www.aquariusplatinum.com for the Statistical Information)      
Aquarius Platinum Limited                                                       
Incorporated in Bermuda                                                         
Exempt company number 26290                                                     
Board of Directors                                                              
Nicholas Sibley                 Non-executive Chairman                          
Stuart Murray                   Chief Executive Officer                         
David Dix                       Non-executive                                   
Tim Freshwater                  Non-executive                                   
Edward Haslam                   Non-executive                                   
Sir William Purves              Non-executive (Senior                           
Independent Director)                            
Kofi Morna                      Non-executive                                   
Zwelakhe Mankazana              Non-executive                                   
                                                                                

Audit/Risk Committee                                                            
Sir William Purves (Chairman)                                                   
David Dix                                                                       
Edward Haslam                                                                   
Kofi Morna                                                                      
Nicholas Sibley                                                                 
                                                                                
Remuneration/Succession Planning Committee                                      
Edward Haslam (Chairman)                                                        
David Dix                                                                       
Zwelakhe Mankazana                                                              
Nicholas Sibley                                                                 
                                                                                
Nomination Committee                                                            
The full Board comprises the Nomination Committee                               

Company Secretary                                                               
Willi Boehm                                                                     
                                                                                
Investor Relations                                                              
Gavin Mackay                    Business Development &                          
                               Communications Executive                         
                                                                                
AQPSA Management                                                                
Stuart Murray                   Executive Chairman                              
Anton Lubbe                     Managing Director                               
Helene Nolte                    Director: Finance                               
Hulme Scholes                   Commercial Director                             
Paul Smith                      Director: New Business,                         
                               Projects and Long-Range                          
                               Planning                                         
Mkhululi Duka                   Director: Human Capital                         
Abraham van Ghent               Senior General Manager:                         
                               Operations                                       
Graham Ferreira                 General Manager: Group Admin &                  
Company Secretary                                
Wessel Phumo                    General Manager: Marikana                       
Gabriel de Wet                  General Manager: Engineering                    
Augustine Simbanegavi           General Manager: Everest                        
Anthony Joubert                 General Manager: Blue Ridge                     
                                                                                
Mimosa Mine Management                                                          
Winston Chitando                Managing Director                               
Herbert Mashanyare              Technical Director                              
Peter Chimboza                  Resident Director                               
Fungai Makoni                   General Manager Finance &                       
                               Company Secretary                                
Platinum Mile Management                                                        
Richard Atkinson                Managing Director                               
Paul Swart                      Financial Director                              
                                                                                
Issued Capital                                                                  
At 30 June 2010, the Company had in issue: 463,070,936 fully paid common        
shares and 702,566 unlisted options.                                            
Substantial Shareholders 30 June  Number of     Percentage                      
2010                              Shares                                        
Savannah Consortium               68,658,728    14.83                           
HSBC Custody Nominees             38,718,101    8.36                            
(Australia) Limited                                                             
JP Morgan Nominees Australia      34,587,626    7.47                            
Limited                                                                         
National Nominees Limited         26,529,839    5.73                            
Chase Nominees Limited            25,729,854    5.56                            
Trading Information                                                             
ISIN number BMG0440M1284                                                        
ADR ISIN number US03840M2089                                                    
Convertible Bond ISIN number XS0470482067                                       
Broker (LSE) (Joint)  Broker (ASX)         Sponsor (JSE)                        
Liberum Capital       Euroz Securities     Rand Merchant Bank                   
Limited               Level 14, The        (A division of                       
City Point, 1         Quadrant             FirstRand Bank                       
Ropemaker Street,     1 William Street,    Limited)                             
London, EC2Y 9HT      Perth WA 6000        1 Merchant Place                     
Telephone: +44 (0)    Telephone: +61 (0)   Cnr of Rivonia Rd                    
20 3100 2000          8 9488 1400          and Fredman Drive,                   
Bank of America                            Sandton 2146                         
Merrill Lynch                              Johannesburg South                   
2 King Edward St                           Africa                               
London, EC1A 1HQ                                                                
Telephone: +44 (0)20                                                            
7628 1000                                                                       
                                                                                
                                                                                
Aquarius Platinum (South Africa) (Proprietary) Ltd                              
100% Owned                                                                      
(Incorporated in the Republic of South Africa)                                  
Registration Number 2000/000341/07                                              
1st Floor, Building 5, Harrowdene Office Park, Western Service Road, Woodmead   
2191, South Africa                                                              
Postal Address:                                                                 
PO Box 76575, Wendywood, 2144, South Africa.                                    
Telephone:     +27 (0)11 656 1140                                               
Facsimile:     +27 (0)11 802 0990                                               
Aquarius Platinum Corporate Services Pty Ltd                                    
100% Owned                                                                      
(Incorporated in Australia)                                                     
ACN 094 425 555                                                                 
Level 4, Suite 5, South Shore Centre, 85 The Esplanade, South Perth, WA 6151,   
Australia                                                                       
Postal Address:                                                                 
PO Box 485, South Perth, WA 6151, Australia                                     
Telephone:     +61 (0)8 9367 5211                                               
Facsimile:     +61 (0)8 9367 5233                                               
Email:         info@aquariusplatinum.com                                        
For further information please visit www.aquariusplatinum.com or contact:       
In Australia                                                                    
Willi Boehm                                                                     
+61 (0) 8 9367 5211                                                             
In the United Kingdom and South Africa                                          
Gavin Mackay                                                                    
gavin.mackay@aquariusplatinum.com                                               
+ 44 7909 547 042                                                               
Glossary                                                                        
A$                     Australian Dollar                                        
Aquarius               Aquarius Platinum Limited                                
APS                    Aquarius Platinum Corporate Services                     
                      Pty Ltd                                                   
AQPSA                  Aquarius Platinum (South Africa) (Pty)                   
                      Ltd                                                       
ACS(SA)                Aquarius Platinum (SA) Corporate                         
                      Services (Pty) Ltd                                        
BEE                    Black Economic Empowerment                               
BRPM                   Blue Ridge Platinum Mine                                 
CTRP                   Chromite Ore Tailings Retreatment                        
                      Operation. Consortium comprising                          
                      Aquarius Platinum (SA) (Corporate                         
                      Services) (Pty) Limited (ASACS),                          
Ivanhoe Nickel and Platinum Limited and                   
                      Sylvania South Africa (Pty) Ltd                           
                      (SLVSA).                                                  
DIFR                   Disabling injury frequency rate - being                  
the number of lost-time injuries                          
                      expressed as a rate per 1,000,000 man-                    
                      hours worked                                              
DIIR                   Disabling injury incidence rate - being                  
the number of lost-time injuries                          
                      expressed as a rate per 200,000 man-                      
                      hours worked                                              
DME                    formerly South African Government                        
Department of Minerals and Energy                         
                      Affairs                                                   
DMR                    South African Government Department of                   
                      Mineral Resources and Energy, formerly                    
the DME                                                   
Dollar or $            United States Dollar                                     
Everest                Everest Platinum Mine                                    
Great Dyke Reef        A PGE bearing layer within the Great                     
Dyke Complex in Zimbabwe                                  
g/t                    Grams per tonne, measurement unit of                     
                      grade (1g/t = 1 part per million)                         
JORC code              Australasian code for reporting of                       
Mineral Resources and Ore Reserves                        
JSE                    JSE Limited                                              
Kroondal               Kroondal Platinum Mine or P&SA1 at                       
                      Kroondal                                                  
LHD                    Load haul dump machine                                   
Marikana               Marikana Platinum Mine or P&SA2 at                       
                      Marikana                                                  
Mimosa                 Mimosa Mining Company (Private) Limited                  
nm                     Not measured                                             
PGE(s) (6E)            Platinum group elements plus gold.                       
                      Five metallic elements commonly found                     
                      together which constitute the                             
platinoids (excluding Os (osmium)).                       
                      These are Pt (platinum), Pd                               
                      (palladium), Rh (rhodium), Ru                             
                      (ruthenium), Ir (iridium) plus Au                         
(gold)                                                    
PGM(s) (4E)            Platinum group metals plus gold.                         
                      Aquarius reports the PGMs as comprising                   
                      Pt+Pd+Rh plus Au (gold) with the Pt, Pd                   
and Rh being the most economic                            
                      platinoids in the UG2 Reef                                
P&SA1                  Pooling & Sharing Agreement between                      
                      AQPSA and RPM Ltd on Kroondal                             
P&SA2                  Pooling & Sharing Agreement between                      
                      AQPSA and RPM Ltd on Marikana                             
R                      South African Rand                                       
Ridge                  Ridge Mining Limited                                     
ROM                    Run of mine. The ore from mining which                   
                      is fed to the concentrator plant. This                    
                      is usually a mixture of UG2 ore and                       
                      waste.                                                    
Tonne                  1 Metric tonne (1,000kg)                                 
UG2 Reef               A PGE-bearing chromite layer within the                  
                      Critical Zone of the Bushveld Complex                     
29 July 2010                                                                    
Sponsor                                                                         
RAND MERCHANT BANK (A division of FirstRand Bank Limited)                       
Date: 29/07/2010 08:00:01 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: