Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Tue 21 Dec 2010, 10:20 EPS - Eastern Platinum Limited - Final updated Technical Reports filed on
EPS
EPS                                                                             
EPS - Eastern Platinum Limited - Final updated Technical Reports filed on       
SEDAR and clarification news release                                            
EASTERN PLATINUM LIMITED                                                        
(Incorporated in Canada)                                                        
(Canadian Registration number BC0722783)                                        
(South African Registration number 2007/006318/10)                              
Share Code TSX: ELR ISIN: CA2768551038                                          
Share Code AIM: ELR ISIN: CA2768551038                                          
Share Code JSE: EPS ISIN: CA2768551038                                          
December 20, 2010                                                               
Trading Symbol: ELR (TSX & AIM) EPS (JSE)                                       
S&P TSX Composite Index                                                         
NEWS RELEASE                                                                    
FINAL UPDATED TECHNICAL REPORTS FILED ON SEDAR AND CLARIFICATION NEWS RELEASE   
Eastern Platinum Limited (the "Company" or "Eastplats") reports that it has     
filed the following final Technical Reports on SEDAR in connection with the     
Company`s short form prospectus offering:                                       
-    "Technical Report Update on the Crocodile River Mine, Eastern Platinum,    
    North West Province, South Africa";                                         
-    "Technical Report Update on the Mareesburg Platinum Project Limpopo"; and  
-    "Technical Report for the Kennedy`s Vale Project".                         
In connection with the filings, the Company is pleased to provide a statement   
of current resources and reserves supported by the report on the Crocodile      
River Mine ("CRM"), and summaries of the results as reported in updated         
reports on the Mareesburg and Kennedy`s Vale/Spitzkop projects.                 
The Company also wishes to clarify certain of its prior disclosure relating to  
its Kennedy`s Vale/Spitzkop project.                                            
CROCODILE RIVER MINE                                                            
Resources and reserves as reported in the Technical Report update are provided  
in the following tables. The resources are effective as of May 30, 2009. The    
reserves are effective as of November 30, 2010.                                 
Table 1:  Classified Resources - CRM                                            
Resource   Tonnes       Metal Concentration              Contained Metal        
Area                                                                            
                       4E     Pt      Pd     Rh      Au     4E                  
(g/t)   (g/t)   (g/t)  (g/t)   (g/t)                       
                                                            (Kg)      (Oz)      
Measured                                                                        
Crocette   2,806,950    3.78   2.40    0.95   0.39    0.02   10,599    340,772  
Maroelabul 614,442      3.98   2.51    1.02   0.42    0.02   2,443     78,558   
t                                                                               
ZF above 9 1,619,995    4.15   2.60    1.09   0.43    0.03   6,726     216,232  
level                                                                           
ZF below 9 -            -      -       -      -       -      -         -        
level                                                                           
Total      5,041,387    3.92   2.48    1.00   0.41    0.02   19,768    635,562  
Indicated                                                                       
Crocette   2,541,629    3.81   2.42    0.96   0.40    0.02   9,688     311,492  
Maroelabul 2,587,973    3.90   2.47    0.99   0.41    0.02   10,094    324,523  
t                                                                               
ZF above 9 22,435,194   4.02   2.53    1.04   0.42    0.02   90,274    2,902,394
level                                                                           
ZF below 9 8,524,977    4.22   2.64    1.11   0.44    0.03   36,002    1,157,501
level                                                                           
Total      36,089,773   4.05   2.54    1.05   0.42    0.02   146,059   4,695,910
Total Measured and Indicated                                                    
Crocette   5,348,579    3.79   2.41    0.95   0.40    0.02   20,288    652,264  
Maroelabul 3,202,415    3.91   2.48    1.00   0.41    0.02   12,537    403,081  
t                                                                               
ZF above 9 24,055,189   4.03   2.54    1.04   0.42    0.02   97,000    3,118,626
level                                                                           
ZF below 9 8,524,977    4.22   2.64    1.11   0.44    0.03   36,002    1,157,501
level                                                                           
Total      41,131,160   4.03   2.54    1.04   0.42    0.02   165,827   5,331,472
Inferred                                                                        
Crocette   826,471      3.84   2.44    0.97   0.40    0.02   3,173     102,005  
Maroelabul -            -      -       -      -       -      -         -        
t                                                                               
ZF above 9 2,234,991    4.06   2.55    1.05   0.42    0.02   9,081     291,949  
level                                                                           
ZF below 9 19,007,813   4.09   2.57    1.06   0.43    0.03   77,780    2,500,690
level                                                                           
Total      22,069,275   4.08   2.56    1.06   0.43    0.03   90,033    2,894,644
Inferred                                                                        
Table 2:  Classified Reserves - CRM                                             
Reserve   Tonnes       Metal Concentration              Contained Metal         
Area                                                                            
                      4E     Pt      Pd     Rh      Au     4E                   
                     (g/t)  (g/t)  (g/t)  (g/t)   (g/t)                         
(Kg)      (Oz)       
Proven                                                                          
Crocette  -            -      -       -      -       -      -         -         
Maroelabu 132,000      3.91   2.42    1.06   0.4     0.04   515       16,600    
lt                                                                              
Zandfonte 842,000      4.08   2.53    1.10   0.4     0.04   3,435     110,400   
in                                                                              
Total     974,000      4.06   2.52    1.09   0.4     0.04   3,950     127,000   
Proven                                                                          
Probable                                                                        
Crocette  3,530,000    3.78   2.41    0.95   0.4     0.02   13,340    102,005   
Maroelabu 2,173,000    3.91   2.48    1.00   0.4     0.02   8,487     272,900   
lt                                                                              
Zandfonte 22,748,000   4.08   2.56    1.06   0.4     0.03   92,896    2,986,600 
in                                                                              
Total     28,451,000   4.03   2.54    1.04   0.4     0.02   114,723   3,688,400 
Probable                                                                        
Total     29,425,000   4.03   2.54    1.04   0.42    0.03   118,673   3,815,400 
Full details of the methodology used in the estimation of reserves and          
resources, along with details of the mining operations at CRM are provided in   
the Technical Report filed on SEDAR.                                            
MAREESBURG                                                                      
Revised resource and reserve estimates were prepared for the UG2 reef on        
Mareesburg as part of the economic analysis for the project. The Resource       
estimate is shown in Table 3 below.                                             
Table 3:  Classified Resources - Mareesburg                                     
                 Tonnes      Grade 4E  Contained 4E    Cu      Ni               
                           (g/t)     (ounces)                                   
Measured          8,940,000   5.26      1.51 million    .035%   .082%           
Resources                                                                       
Indicated         6,950,000   2.19      0.49 million    .015%   .056%           
Resources                                                                       
Total M&I         15,890,000  3.92      2.00 million    .026%   .070%           
Resources                                                                       
This Resource estimate conforms to the requirements of NI 43-101 and includes   
the Probable Reserves outlined in Table 4 below.                                
Table 4:  Classified Reserves - Mareesburg                                      
                Tonnes            Grade  (4E)      4E                           
                                (g/t)             (Ounces)                      
Probable Reserve 4,557,810         4.0              586,213                     
Eastplats proposes to mine the UG2 reef by open pit mining methods.             
The mined reef material would be processed in a concentrator to be built on     
land currently owned by Eastplats in the Steelpoort valley, some 30 km away     
from Mareesburg. An all-weather road connects the two sites. The concentrator   
is planned to process 90,000 tpm of feed.                                       
Metallurgical testing confirms that the UG2 reef at the Mareesburg deposit is   
amenable to standard concentrating processes for UG2 material and that a        
saleable grade concentrate should be produced.                                  
Concentrator recoveries are estimated to be in the order of 80%. Initial        
process test work indicates that a saleable concentrate containing              
approximately 200 g/t of 6E PGMs should be achievable. The concentrator should  
also produce a by-product chromite concentrate which should also be             
marketable.                                                                     
Eastplats currently has a sales contract with Impala Refining Services for      
concentrate from its operating Crocodile River Mine.  A similar contract is in  
the process of being negotiated for the Mareesburg concentrate.                 
The Mareesburg deposit should support a mine that could be placed into          
production relatively quickly and with a relatively low capital cost.           
Estimated capital costs for the Mareesburg mine and concentrator were           
developed in April 2010 based on engineering work performed by qualified South  
African engineering and mining companies in 2008 and 2009. These costs include  
the necessary infrastructure to support mining operations, such as power,       
water, maintenance and warehouse facilities and other operating facilities, as  
well as for capitalized pre-stripping for the open pit mine.                    
Costs were reviewed in early 2010 and have been escalated to April 2011 to      
reflect the current estimated construction start date.  All conversions to US   
dollars from South African Rand (ZAR) are at a rate of US$1.00 = ZAR7.00.       
Estimated capital costs are US$288 million. A full breakdown of capital costs   
is provided in the Technical Report filed on SEDAR.                             
The mining operations at Mareesburg are estimated to produce on average         
115,000 6E PGM ounces per year.                                                 
Operating costs for the Mareesburg open pit mine were developed from bids from  
qualified contract miners based on a scope of work developed by Eastplats.      
Operating costs for the concentrator were developed by Eastplats based on       
current operating experience at the Crocodile River Mine, adjusted for the      
smaller throughput at the new concentrator. All capital costs are converted to  
US dollars from South African Rand (ZAR) at an exchange rate of US$1.00 =       
ZAR7.00.                                                                        
Total operating costs per ton milled are estimated at US$62.80. A full          
breakdown of estimated operating costs is provided in the Technical Report      
filed on SEDAR.                                                                 
A financial analysis was performed internally by Eastplats on the project.      
The project shows an NPV of ZAR 593 million (US$85 million) and an IRR of 27%.  
A full breakdown of the financial analysis and parameters used is provided in   
the Technical Report filed on SEDAR.                                            
KENNEDY`S VALE/SPITZKOP                                                         
The updated Technical Report filed on SEDAR describes the Kennedy`s Vale        
Project, covering the farms Kennedy`s Vale 361 KT, Belvedere 362 KT, De         
Goedeverwachting 332 KT, Spitzkop 333KT and portions of the farms Tweefontein   
360 KT and Boschkloof 331 KT.                                                   
Exploration has been undertaken on properties within the Kennedy`s Vale         
Project since 1988. The primary target has always been the UG2 chromitite, due  
to its high grade with the separate Merensky Reef being a secondary target.     
Exploration to date has included geological mapping, aeromagnetic surveys, a 3- 
D seismic survey and extensive diamond drilling with a total of 207,062 metres  
of drilling having been completed to date.                                      
Mineral Resource estimates have been completed and are reported in compliance   
with National Instrument 43-101, Standards of Disclosure for Mineral Projects.  
The resources shown in Tables 5 and 6 have been classified as Measured,         
Indicated and Inferred in accordance with NI 43-101 reporting requirements.     
Geological losses applied were 20% for the UG2 reef and 25% for the Merensky    
reef.                                                                           
Table 5 shows the diluted UG2 reef resource reported in the updated Technical   
Report that can be practically mined at Spitzkop and is the resource that will  
be used when project economics are assessed.                                    
Resources for the Merensky Reef are shown in Table 6.                           
Table 5: Classified Resources for the Diluted Interval in the UG2 Reef -        
Kennedy`s Vale/Spitzkop                                                         
LC2 To U2MC           Width     SG      Million  Ni      Cu      3PGE+Au        
                                    Tonnes                                      
                     (m)               20% Geol (g/t)   (g/t)   (g/t)           
                                    Loss                                        
Measured                                                                        
Boschkloof            1.50      3.88    20.9     618     286     5.13           
De Goedeverwachting   1.49      3.93    28.6     574     158     5.20           
Kennedy`s Vale        1.50      3.82    42.3     520     150     4.43           
Spitzkop              1.48      3.81    41.8     481     158     5.21           
Total                 1.49      3.85    133.6    535     175     4.95           
Indicated                                                                       
Belvedere             1.50      3.84    15.3     560     192     3.94           
Boschkloof            1.50      3.86    13.8     560     213     4.84           
Kennedy`s Vale        1.50      3.83    21.5     494     146     4.15           
Tweefontein           1.48      3.85    3.1      614     148     4.43           
Total                 1.50      3.84    53.8     537     177     4.28           
Total Measured and    1.49      3.85    187.4    535     176     4.76           
Indicated                                                                       
Inferred                                                                        
Belvedere             1.50      3.84    51.3     543     142     4.71           
Boschkloof            1.50      3.83    2.9      711     288     4.52           
Tweefontein           1.49      3.83    20.9     548     124     4.58           
Total Inferred        1.50      3.84    75.1     551     143     4.67           
                                                                                
LC2 To U2MC           3PGE+Au   5PGE+   Pt       Pd      Rh      Au             
                    Million   Au                                                
                    Ounces                                                      
                               (g/t)   (g/t)    (g/t)   (g/t)   (g/t)           
20% Geol                                                    
                    Loss                                                        
Measured                                                                        
Boschkloof            3.45      6.11    2.70     1.83    0.55    0.06           
De Goedeverwachting   4.79      6.22    2.81     1.81    0.53    0.06           
Kennedy`s Vale        6.03      5.31    2.36     1.57    0.45    0.05           
Spitzkop              7.00      6.26    2.83     1.83    0.48    0.07           
Total                 21.3      5.93    2.65     1.75    0.49    0.06           
Indicated                                                                       
Belvedere             1.9       4.72    2.11     1.40    0.38    0.05           
Boschkloof            2.2       5.81    2.59     1.71    0.49    0.06           
Kennedy`s Vale        2.9       5.00    2.26     1.41    0.43    0.05           
Tweefontein           0.4       5.27    2.36     1.56    0.47    0.05           
Total                 7.4       5.15    2.31     1.50    0.43    0.05           
Total Measured and    28.7      5.70    2.55     1.67    0.48    0.05           
Indicated                                                                       
Inferred                                                                        
Belvedere             7.8       5.59    2.43     1.73    0.49    0.05           
Boschkloof            0.4       5.43    2.39     1.63    0.44    0.06           
Tweefontein           3.1       5.43    2.39     1.66    0.48    0.05           
Total Inferred        11.3      5.54    2.42     1.71    0.49    0.05           
Table 6: Classified Resources for the separate Merensky Reef - Kennedy`s        
Vale/Spitzkop                                                                   
Merensky Reef        Width   SG      Million  Ni      Cu      3PGE+Au           
Tonnes                                         
                    (m)             25% Geol (g/t)   (g/t)   (g/t)              
                                 Loss                                           
Measured                                                                        
Boschkloof           2.51    3.27    16.26    1104    666     2.30              
De Goedeverwachting  2.53    3.25    36.75    1040    605     2.35              
Kennedy`s Vale       2.50    3.26    59.22    1210    635     2.79              
Spitzkop             2.49    3.21    48.92    1147    670     2.53              
Totals               2.50    3.25    161.15   1141    642     2.56              
Indicated                                                                       
Belvedere            2.47    3.28    24.33    1408    645     3.98              
Boschkloof           2.51    3.28    30.89    1283    659     2.65              
De Goedeverwachting  2.48    3.30    0.98     1092    654     2.42              
Kennedy`s Vale       2.49    3.27    25.91    1192    612     3.62              
Tweefontein          2.53    3.27    5.95     1416    673     3.52              
Totals              2.50    3.28    88.06    1298    642     3.36               
Total Measured and   2.50    3.26    249.21   1197    642     2.84              
Indicated                                                                       
Inferred                                                                        
Belvedere            2.52    3.28    64.47    1338    610     3.04              
Boschkloof           2.61    3.27    3.33     1416    569     3.07              
Tweefontein          2.50    3.28    26.28    1555    668     3.50              
Total Inferred      2.52    3.28    94.08    1401    624     3.17               
Merensky Reef        3PGE+ Au  5PGE    Pt       Pd      Rh      Au              
Million   Au                                                 
                   Ounces                                                       
                    25%       (g/t)   (g/t)    (g/t)   (g/t)   (g/t)            
                   Geol                                                         
Loss                                                         
Measured                                                                        
Boschkloof           1.20      2.53    1.37     0.68    0.11    0.14            
De Goedeverwachting  2.78      2.56    1.36     0.75    0.09    0.16            
Kennedy`s Vale       5.30      3.04    1.59     0.91    0.12    0.17            
Spitzkop             3.98      2.77    1.44     0.80    0.11    0.19            
Totals               13.26     2.79    1.47     0.82    0.11    0.17            
Indicated                                                                       
Belvedere            3.11      4.34    2.24     1.35    0.16    0.23            
Boschkloof           2.63      2.90    1.49     0.89    0.12    0.15            
De Goedeverwachting  0.08      2.62    1.37     0.79    0.09    0.17            
Kennedy`s Vale       3.01      3.95    2.00     1.25    0.15    0.21            
Tweefontein          0.67      3.83    1.98     1.21    0.13    0.20            
Totals              9.50      3.67    1.88     1.14    0.14    0.20             
Total Measured and   22.8      3.10    1.61     0.93    0.12    0.18            
Indicated                                                                       
Inferred                                                                        
Belvedere            6.31      3.31    1.72     1.04    0.12    0.17            
Boschkloof           0.33      3.35    1.71     1.06    0.12    0.18            
Tweefontein          2.96      3.81    2.00     1.17    0.13    0.20            
Total Inferred      9.60      3.45    1.79     1.08    0.12    0.18             
Full details of the methodology and resource estimates are provided in the      
updated Technical Report filed on SEDAR.                                        
In news releases dated April 10, 2008 and April 22, 2008, the Company made      
reference to anticipated production rates that it considered could be achieved  
at Spitzkop (being the shallower section of the Kennedy`s Vale/Spitzkop         
project), that were based upon its operational experience in underground        
mining in the UG2 reef at CRM. The Company wishes to clarify that it has not    
received an economic evaluation or other economic analysis for an underground   
mining operation at the Kennedy`s Vale/Spitzkop project and that this resource  
is not planned to be exploited as part of the Mareesburg project.               
In the news release dated April 22, 2008, the Company incorrectly made          
reference to "ore" production at Spitzkop. The reference to "ore" for the UG2   
resource at Spitzkop was not supported by an economic analysis as required by   
NI 43-101 reporting requirements for reserve/resource classification and the    
Company wishes to retract that reference.                                       
References made to other production aspects for an underground mine in the UG2  
reef at Spitzkop were based on Eastplats` operating experience in underground   
mining of the UG2 reef at CRM, and are not supported by an economic analysis    
for Spitzkop. The Company has not yet prepared mining plans for Spitskop, does  
not have a timetable for the development of the Spitzkop section, and has not   
yet made a production decision for its development.                             
Long lead items were purchased for the proposed mill for treatment of material  
from Mareesburg, and while this mill could be used for treatment of UG2 reef    
material from Spitzkop, they were not acquired for Spitzkop.                    
Some initial work was previously done by Eastplats to estimate the capital      
cost of adding a milling line to the Mareesburg concentrator to treat a         
possible 90,000 t/m of feed from an underground mine at Spitzkop. The           
Mareesburg concentrator will be treating 90,000 t/m of open cast ore from the   
Mareesburg mine and is located relatively close to Spitzkop. If economic        
conditions permit, another concentrating line could be added to the plant in    
the future to run Spitzkop material in parallel with Mareesburg ore.            
No costing or economic modeling have been done on these scenarios other than a  
preliminary capital cost on expanding the concentrator that was derived from    
part of the capital cost estimate for the Mareesburg project. The estimated     
cost for the second milling line is US$98M. A full breakdown of the costs for   
the second milling line is provided in the Technical Report filed on SEDAR.     
All work on the Kennedy`s Vale/Spitzkop project remains on hold.                
The updated Technical Report recommends that once Eastplats decides to          
reinitiate work on the Kennedy`s Vale/Spitzkop project, a feasibility study     
will be done to develop a project timeline, capital costs, operating costs,     
project economics, and a corresponding mineable reserve. Such a study is        
estimated to take 12 to 18 months and would cost approximately US$2 million in  
2010 dollars.                                                                   
The Qualified Person having prepared the contents of this news release is Mr.   
Brian Montpellier, P.Eng.                                                       
Total shares issued and outstanding - 683,223,948                               
For further information, please contact:                                        
Ian Rozier, President & C.E.O.                                                  
Tel: +1-604-685-6851                                                            
Fax: +1-604-685-6493                                                            
info@eastplats.com                                                              
www.eastplats.com                                                               
NOMAD:                                                                          
Ryan Gaffney / Ryan Cohen                                                       
Canaccord Genuity Limited, London                                               
Email: rgaffney@canaccordgenuity.com / rcohen@canaccordgenuity.com              
Tel: +44 20 7050 6500                                                           
JSE SPONSOR:                                                                    
Johan Fourie                                                                    
PSG Capital (Pty) Limited                                                       
Email: johanf@psgcapital.com                                                    
Tel: +27 21 887 9602                                                            
No stock exchange, securities commission or other regulatory authority has      
approved or disapproved the information contained herein.                       
Cautionary Statement on Forward-Looking Information                             
Certain statements included herein constitute "forward-looking statements"      
within the meaning of applicable Canadian securities legislation. These         
forward-looking statements are based on certain assumptions by Eastplats and    
as such are not a guarantee of future performance. Such statements include      
those about the commencement of development of the Eastern Limb projects and    
future production levels.  Actual results could differ materially from those    
expressed or implied in such forward-looking statements due to factors such as  
general economic and market conditions, increased costs of production and a     
decline in metal prices.  Eastplats is under no obligation to update or revise  
any forward-looking statements, whether as a result of new information, future  
events or otherwise, except as required by applicable laws.                     
Date: 21/12/2010 10:20:01 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: