Thu 9 Jun 2011, 9:00 PAN - Pan African Resources PLC - Encouraging Results of Drilling Programme at
PAN
PAN                                                                             
PAN - Pan African Resources PLC - Encouraging Results of Drilling Programme at  
Bramber Tailings Dam at Barberton Mines (Pty) Ltd                               
Pan African Resources PLC                                                       
(`Pan African` or the `Company` or the `Group`)                                 
Incorporated and registered in England and Wales under Companies Act 1985 with  
the registered number: 3937466 on 25 February 2000                              
Share Code on AIM: PAF                                                          
Share code on JSE: PAN                                                          
ISIN: GB0004300496                                                              
ENCOURAGING RESULTS OF DRILLING PROGRAMME AT BRAMBER TAILINGS DAM AT BARBERTON  
MINES (PTY) LTD                                                                 
Pan African Resources PLC (`Pan African`), the African focused precious metals  
producer, announces the results of a drilling programme on the Bramber tailings 
dam at Barberton Mines (Pty) Ltd (`Barberton Mines`).                           
Highlights:                                                                     
- Indicated mineral resource declared of 148koz (3.130Mt @ 1.47g/t in situ)     
independently verified at a cut off grade of 0.5g/t                             
- Initial metallurgical test work indicates recoveries of 45% to 55%            
- Order of Magnitude (`OME`) study estimates capital for the project for a      
Carbon-in-Leach plant at ZAR120 million (approximately GBP11m) to treat 1.2Mt of
tailings per annum at Barberton Mines for a period of approximately three years 
- An additional 9Mt of dump material is currently being investigated that could 
increase the life of project (`LOP`) from three years to ten years              
- If viable this project could increase production at Barberton Mines by another
20koz per annum over the LOP                                                    
- Feasibility study on the project will be completed by Q2 of 2011/12 financial 
year                                                                            
Jan Nelson, Chief Executive Officer of Pan African, commented: "We are very     
encouraged by these results that show that the re-treatment of tailings at      
Barberton Mines is developing into a significant stand alone gold project. Not  
only could it increase the current production profile of the Company by 20koz   
per annum but also increase the operating margin and reduce unit costs. The     
project at a 10% real discount rate yields a net present value of approximately 
ZAR350 million with an internal rate of return of approximately 85% assuming a  
gold price of ZAR300,000/kg. We continue to focus on organic growth             
opportunities within the Group to grow our earnings."                           
The Bramber tailings dam, which has been used as a tailings storage facility at 
Barberton Mines since 1986, reached the end of its operational life in January  
2011. A new tailings facility was commissioned at that time. Due to the current 
high gold price and low cost associated with the re-treatment of tailings dams, 
the Company undertook a drilling programme to evaluate the dam as a source of   
additional production ounces.                                                   
A total of 308 auger drillholes were drilled on a grid of 20 metre x 20 metre   
representing approximately 6,074 metres. Samples of each hole were taken at 1.5 
metres intervals and composited at 3 metres intervals representing a total of   
2,344 samples taken for assaying. Modeling and geological profiling of the      
boreholes confirmed two distinct depositional populations across the tailings   
dam which is the result of separate historical deposition that took place in two
separate compartments, a higher grade BIOXRegistered tail section and a lower   
concentrator/flotation tail section. Geostatistical modeling indicates 74.6koz  
(758kt at 3.06g/t in situ) for the BIOXRegistered section and 72.9koz (2.369Mt  
at 0.96g/t in situ) for the concentrator/flotation section. This represents a   
total indicated resource of 148koz (3.130Mt at 1.47g/t in situ).                
A total of 10 composite samples representative of the tailings dam were         
submitted for metallurgical recovery test work. Initial excess cyanide test work
indicates recoveries varying between 45% and 55%. Kinetic test work is being    
done to determine residence time that guides the process flow design for plant  
optimum configuration to be used in the feasibility study. The feasibility study
covering plant design, final process flow design, volume throughput, chemical   
and reagent consumption, recoveries and capital and operating expenditure will  
be completed by quarter two of the 2011/12 financial year. If feasible a new    
plant will be constructed to treat 1.2Mt per annum of tailings for three years. 
An OME study completed by Matomo Projects (Pty) Ltd (`Matomo`) estimates the    
capital cost of the plant at approximately ZAR120 million (approximately        
GBP11m). Plant construction is estimated to take 12 months.                     
The Company is currently drilling another 9Mt of tailings which if viable could 
extend the LOP from approximately three to ten years and increase the annual    
production profile at the mine by approximately 20koz. The drilling programme   
and associated metallurgical test work applicable to the expansion is expected  
to be completed within three months.                                            
Bramber Tailings Mineral Inventory                                              
Project      Resource       Mass        Grade      Mineral Resource             
            Category                                                            
                           (kt)        (g/t)      (kg)       (koz)              
Surface Tailings                                                                
Bramber      Measured                                                           
Tailings                                                                        
Dam                                                                             
            Indicated      3,130       1.47       4,600      148                
Inferred                                                            
            Total          3,130       1.47       4,600      148                
Total Surface Tailings      3,130       1.47       4,600      148               
Barberton Mines Mineral Inventory                                               
* Inclusive of the Bramber Tailings Mineral Inventory                           
Barbeton     Resource       Mass        Grade      Contained Gold               
Mines        Category                                                           
Mineral                                                                         
Inventory                                                                       
                           (kt)        (g/t)      (kg)       (koz)              
            Measured       2,750       8.45       23,300     750                
            Indicated      7,340       5.50       40,300     1,300              
Inferred       2,510       8.01       20,100     650                
            Total          12,600      6.64       83,700     2,700              
Total Measured and          10,090      6.30       63,600     2,050             
Indicated                                                                       
Reserve Category            Mass        Grade      Contained Gold               
                           (kt)        (g/t)      (kg)       (koz)              
Proved                      1,220       7.27       8,900      290               
Probable                    2,610       8.48       22,200     710               
Total Proved and Probable   3,830       8.12       31,100     1,000             
Notes:                                                                          
- Please note differences may occur due to rounding.                            
- The table above is only with respect to Barberton Mines.                      
The Company is currently updating the Group`s Mineral Inventory statement and   
this will be announced in due course.                                           
- Frans Chadwick, a member of the South African Council for Professional and    
Technical Surveyors and an employee of Barberton Mines, has signed off on the   
above Mineral Inventory for Barberton Mines.                                    
- Dave Briggs, a member of South African Council for Natural Scientists and an  
independent Geological Consultant signed off on the Mineral Inventory for the   
Bramber Tailings Inventory.                                                     
- The above resource is compliant with the South African Mineral Resources Code.
Johannesburg                                                                    
9 June 2011                                                                     
JSE Sponsor:                                                                    
Macquarie First South Advisers (Pty) Limited                                    
Enquiries:                                                                      
South Africa                 UK                                                 
                                                                                
Pan African                  RBC Capital Markets                                
Jan Nelson, Chief Executive  Martin Eales                                       
Officer                      +44 (0) 20 7653 4000                               
+27 (0) 11 243 2900                                                             
Pan African                  St James`s Corporate                               
Nicole Spruijt, Public       Services Limited                                   
Relations                    Phil Dexter                                        
+27 (0) 11 243 2900          +44 (0) 20 7499 3916                               

Macquarie First South        Gable Communications                               
Advisers (Pty) Ltd           Justine James                                      
Natalie Di-Sante/Melanie de  +44 (0)20 7193 7463                                
Nysschen                                                                        
+27 (0) 11 583 2000                                                             
Date: 09/06/2011 09:00:06 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: