OPERATIONAL UPDATE                                                              
DiamondCorp plc, the African diamond mine development and exploration company,  
is pleased to provide an update of kimberlite bulk testing at the Lace mine in  
South Africa.                                                                   
*    To date, a total of 5,514 tonnes of volcaniclastic kimberlite has been     
    sampled from between the 25 and 26 levels on the southern margin of the     
main Lace pipe. The kimberlite in this contact zone of the pipe is heavily  
    diluted with up to 75% country rock (waste) inclusions.                     
*    An additional 1,500 tonnes of kimberlite from the south west side of the   
    pipe has been hauled to surface in readiness for processing and mining      
continues in a northeast direction across the pipe.                         
*    The tonnage processed to date represents less than 20% of the total tonnage
    from the planned bulk test of 30,000 tonnes and less than 20% of the total  
    area of the pipe to be sampled.                                             
*    From the total kimberlite processed to date, 759 carats of diamonds have   
    been extracted, with the biggest stone being a 16.08 carat non-gem diamond. 
*    Of the 759 carats, the first 561 carats have been valued by the SA Diamond 
    Exchange at an average of $205 per carat, 71% higher than the Company`s     
base case of $120 per carat, and 28% higher than the Company`s upper case   
    of $160 per carat.                                                          
*    To date the largest diamond in the parcel is a sawable gem of 5.52 carats  
    valued at $1,500 per carat. The bulk of the value in the parcel lies in gem 
stones of between 1 and 4 carats, and more than 80% of the diamonds         
    recovered to date are gem quality. This is an exceptionally high proportion 
    for run-of-mine kimberlite.                                                 
*    The average recovered grade of `diluted contact kimberlite material`       
processed to date is 13.76 carats per hundred tonne ("cpht"). This should   
    not be considered indicative of the whole pipe at this level, as less than  
    20% of the pipe area has been sampled to date.                              
*    Sampling started in what historically was described as the "stony ground"  
side of the pipe, where waste inclusions dilute the grade and is moving     
    progressively northeast across the pipe into the zone where historically    
    the best recoveries (higher grades) were reported.                          
*    The pipe is being sampled in this manner so that development drives put in 
place for sampling can be used for full-scale mining in a sequence which    
    allows the expected highest grade kimberlite in the northeast of the pipe   
    to be mined first, and then progressively mine in a retreat manner to the   
    lower grade southwest side.                                                 
*    Forecast revenue per tonne on the kimberlite extracted to date is US$28.21 
    per tonne, which represents 98 per cent of the Company`s base case of       
    $28.80 per tonne, though the parcel valued to date is less than 10% of      
    diamonds expected to be recovered from the bulk test.                       
*    The Lace processing plant is operating efficiently and no damage to any    
    diamonds recovered to date has been identified.                             
*    The sampling rate is slower than planned due to poor ground conditions in  
    and around development drives put in place ahead of mining operations on    
the 25 and 26 levels in the 1930s. To ensure mining takes place in as safe  
    a manner as possible, the 30,000 tonne bulk sample will now take until      
    September to complete as a consequence of the additional hanging wall       
    support required.                                                           
*    These poor ground conditions in the upper level of the first 70m mining    
    block will not affect full-scale mine development or mining rates at the    
    planned production level on the 33 level where pre-existing development     
    drives are minimal. To the contrary, it is expected to assist with caving   
of the kimberlite.                                                          
Commenting on the activities, DiamondCorp CEO, Paul Loudon said: `While we wish 
it was possible to extract the bulk sample at a faster rate, for safety reasons 
this is not possible.                                                           
`As a result, we are reporting on what we expect to be the lowest grade sections
of the pipe at this level as this area has been sampled first. Nonetheless, we  
are absolutely delighted with the quality of the diamonds we are recovering.    
`Further, the dramatic increase in carat value has the potential to lower our   
forecast breakeven grade from 13 cpht to 8 cpht, meaning Lace could be a        
significantly higher cash generator than initially thought.                     
`Opening up old workings which have been under water for more than 75 years has 
particular challenges and our emphasis is always on ensuring the safety of our  
workforce.                                                                      
`Pleasingly, the old mine plans have proven to be very accurate both in terms of
elevation and the position of old tunnels. And now, as we are sampling, the     
kimberlite descriptions from the old manager`s reports are also proving         
accurate.`                                                                      
The 1931 manager`s annual report says: "The total (development) footage in the  
Mine amounted to 16,979ft., of which 7,733ft. represented the work done in the  
block from 780ft. (24 level) to 1,100ft. (33 level) The development continued to
expose good ground in the North, North-East and East sections of the Mine, and  
stony ground in the South-East and West."                                       
A full copy of this report has been uploaded to the Company`s website at        
www.diamondcorp.plc.uk, along with some photos of the diluted kimberlite which  
has been sampled to date.                                                       
The Company plans to release another update on Lace bulk sampling in            
approximately four weeks time.                                                  
London                                                                          
2 August 2011                                                                   
The Competent Person responsible for the technical information contained in this
announcement is Mr Paul Zweistra (Pr. Sci. Nat., Registration number 400016/93) 
a full-time employee of VP3 Geoservices (Pty) Ltd.  VP3 and Mr Zweistra have    
revieved the information contained herein and approved the contents of this     
press release.                                                                  
AIM Nomad: Fairfax I.S. plc                                                     
AIM Brokers: Fairfax I.S. plc, Ocean Equities Ltd                               
JSE Sponsor: PSG Capital (Pty) Limited                                          
DiamondCorp plc, Paul Loudon +44 20 3151 0970/+27 56 212 2308                   
Ewan Leggat, Fairfax I.S. plc +44 207 598 5368                                  
Guy Wilkes, Ocean Equities Limited +44 207 786 4370                             
John-Paul Dicks, PSG Capital (Pty) Limited +27 21 887 9602                      
Charmane Russell/Marion Brower, Russell & Associates +27 11 880 3924            
Date: 02/08/2011 08:02:58 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: