Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Wed 30 Nov 2011, 12:57 VIL - Village Main Reef Limited - Village intersects Merensky Platinum Reef
VIL
VIL                                                                             
VIL - Village Main Reef Limited - Village intersects Merensky Platinum Reef     
at 204m below surface at Lesego                                                 
Village Main Reef Limited                                                       
(formerly known as Village Main Reef Gold Mining Company (1934) Limited)        
(Registration number 1934/0057034/06)                                           
Share Code: VIL                                                                 
ISIN: ZAE000154761                                                              
("Village")                                                                     
VILLAGE INTERSECTS MERENSKY PLATINUM REEF AT 204m BELOW SURFACE AT LESEGO       
-    13 additional holes drilled, with 5 holes remaining to complete            
    shallow drilling program                                                    
-    Continued intersection of economic Merensky Reef and UG2 Chromitite at     
    depths between 350m and 700m                                                
-    Large, shallow to medium depth, high grade ore body                        
-    Consistent return of high grade reef intersections from deeper             
drilling                                                                    
As part of Lesego`s continued shallow drilling program, Village today           
announces that the borehole LES049 has intersected the Merensky Reef at a       
shallower depth of 204m below surface. The reef has a width of about 1 m        
and contains visible sulphide mineralisation which indicates that the reef      
may contain economic grades of platinum group elements (3 PGE`s) plus gold.     
As the reef is intersected closer to the surface, both the Merensky Reef        
and UG2 Chromitite tend to steepen up to a near-vertical dip but maintain       
thicknesses and grades that Lesego believes are economically mineable using     
a sub-level open stoping method. This mining method, which is well              
established in the mining industry, lends itself to mechanization which in      
turn significantly reduces operational costs and enhances safety.               
Drill intersections from drill holes LES029, LES031, LES032, LES035, LES036     
and LES037 with assay results are presented below.                              
Drill hole   Reef                  Depth below       Width      3PGE + Au       
                                Surface                                         
LES029U0     UG2 Chromitite        1522m             2.08m      5.00 g/t        
LES029U1     UG2 Chromitite        1522m             1.32m      6.77 g/t        
LES029U2     UG2 Chromitite        1522m             1.57m      6.28 g/t        
LES031M7     Merensky Reef         1870m             1.31m      6.26 g/t        
LES031M8     Merensky Reef         1871m             1.38m      5.65 g/t        
LES031M10    Merensky Reef         1871m             1.26m      7.58 g/t        
LES031U0     UG2 Chromitite        2106m             1.23m      5.63 g/t        
LES031U3     UG2 Chromitite        2106m             1.53m      6.07 g/t        
LES031U6     UG2 Chromitite        2106m             1.40m      7.40 g/t        
LES032U2     UG2 Chromitite        1906m             2.39m      5.62 g/t        
LES032U5     UG2 Chromitite        1906m             1.98m      5.23 g/t        
LES032U7     UG2 Chromitite        1906m             1.95m      5.98 g/t        
LES35U0      UG2 Chromitite        448m              1.18m      4.74 g/t        
LES35U0      UG2 Chromitite        448m              0.97m      2.93 g/t        
LES35U0      UG2 Chromitite        448m              1.08m      3.82 g/t        
LES036M0     Merensky Reef         362m              0.99m      3.37 g/t        
LES036U0     UG2 Chromitite        551m              0.99m      1.89 g/t        
LES036U1     UG2 Chromitite        551m              0.99m      1.93 g/t        
LES036U2     UG2 Chromitite        551m              0.99m      3.04 g/t        
LES037M3     Merensky Reef         347m              1.33m      7.23 g/t        
The drilling program has successfully delineated additional Merensky Reef       
between depths of 204m and 700m below surface, whilst the UG2 Chromitite        
has been intersected at depths of between 470m and 900m, along strike           
lengths of approximately 2 km.                                                  
Lesego`s prefeasibility study is due to be released early next year. The        
Bankable Feasibility Study scheduled for completion at end 2012/ beginning      
2013.                                                                           
CEO, Bernard Swanepoel commented, "Our consistent drilling results continue     
to demonstrate that this ore body is economically viable at shallow depths      
and also at depths of greater than 700m, where high grades averaging 6.61       
g/t 3PGE + gold over an average width of 1.17m have previously been             
reported. The shallower, consistent grade intersections have greatly            
improved the capex, opex and mining requirements for a future potential         
mine. We continue to increase the value of Lesego, proving it up into a         
large, shallow to medium depth, high grade ore body".                           
Contacts:                                                                       
Village CEO: Bernard Swanepoel, bernard@villagemainreef.co.za, 083 303 9922     
Vestor: Media and Investor Relations, Louise Brugman, louise@vestor.co.za,      
011 787 3015, 083 504 1186                                                      
Note to editors                                                                 
About the Lesego Project                                                        
Village controls a 77% interest in the Lesego project with the Industrial       
Development Corporation (IDC) owning the remaining 23%. Situated near           
Burgersfort, South Africa, Lesego is fully funded to the bankable               
feasibility study, by the IDC, to the tune of R142 million.                     
The ore body at the Phosiri dome consists of both the UG2 Chromitite and        
the Merensky Reef, which occur as distinct layers of contrasting rock type      
to the surrounding rocks. They are part of a 3 to 6 km layered package          
known as the Rustenburg Layered Suite, which forms part of the Bushveld         
Igneous Complex. The Bushveld Igneous Complex formed from molten rock           
injected into the sedimentary rocks of the Transvaal Supergroup about 2,055     
million years ago, and which crystallised into distinct layers, a few of        
which contain concentrations of valuable metals. The Bushveld Complex           
therefore contains the greatest concentration of known mineral wealth on        
the planet and includes platinum group element (PGE) ores, base metals such     
as chromium, iron, tin, titanium and vanadium and industrial minerals such      
as andelusite, dimension stone and magnesite.                                   
30 November 2011                                                                
Date: 30/11/2011 12:57:06 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: