Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Tue 24 Jan 2012, 16:37 EPS - Eastern Platinum Limited - Eastplats reports production results for the
EPS
EPS                                                                             
EPS - Eastern Platinum Limited - Eastplats reports production results for the   
quarter ended December 31, 2011                                                 
EASTERN PLATINUM LIMITED                                                        
(Incorporated in Canada)                                                        
(Canadian Registration number BC0722783)                                        
(South African Registration number 2007/006318/10)                              
Share Code TSX: ELR ISIN: CA2768551038                                          
Share Code AIM: ELR ISIN: CA2768551038                                          
Share Code JSE: EPS ISIN: CA2768551038                                          
January 24, 2012                                                                
Trading Symbol: ELR (TSX & AIM) EPS (JSE)                                       
NEWS RELEASE                                                                    
EASTPLATS REPORTS PRODUCTION RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2011    
Eastern Platinum Limited ("Eastplats") reports operating results from the       
Crocodile River Mine ("CRM") for the fourth quarter ended December 31, 2011.    
Production statistics for the current quarter and historical quarters are as    
follows:                                                                        
                       Quarter ended                                            
Production statistics   Dec 31     Sep 30   Jun 30      Mar 31 2011  Dec 31     
2011       2011     2011                     2010        
Ounces produced         19 854     26 955   20 528      25 387       32 752     
Run-of-mine tonnes      200 919    265 889  203 166     247 369      324 879    
hoisted                                                                         
Run-of-mine tonnes      194 532    261 280  201 986     245 500      327 872    
processed                                                                       
Development (meters)    2 929      3 976    3 562       4 219        3 501      
On-reef development     1 591      2 248    2 090       2 434        1 925      
(meters)                                                                        
Stoping units (square   31 767     40 594   31 828      44 674       53 044     
meters)                                                                         
Head grade              4.05       4.08     3.93        3.93         3.97       
(grams/tonne)                                                                   
Concentrator recovery   76%        78%      76%         79%          78%        
from ROM ore*                                                                   
Chrome dispatched       62 791     77 531   64 913      62 498       79 461     
(tonnes)                                                                        
                             Increase (decrease)                                
Production statistics         Q4 2011 vs     Q3  Q4 2011 vs                     
                             2011               Q4 2010                         
Ounces produced               (7 101)            (12 898)                       
Run-of-mine tonnes hoisted    (64 970)           (123 960)                      
Run-of-mine tonnes processed  (66 748)           (133 340)                      
Development (meters)          (1 047)            (572)                          
On-reef development (meters)  (657)              (334)                          
Stoping units (square meters) (8 827)            (21 277)                       
Head grade (grams/tonne)      (0.03)             0.08                           
Concentrator recovery from    (2%)               (2%)                           
ROM ore*                                                                        
Chrome dispatched (tonnes)    (14 740)           (16 670)                       
*  Concentrator recovery has been rounded to the nearest percentage point.      
Fourth quarter mining and production at the Crocodile River Mine ("CRM") were   
negatively impacted by strike action by employees of CRM`s main mining          
contractor, JIC Mining Services, in October, and by a Section 54 shut-down of   
operations following the fatality at CRM in November.  Both incidents resulted  
in stoppages of mining operations.  Concentrator recovery decreased as a result 
of the subsequent disruptions to the steady state operation of the processing   
plant.                                                                          
As previously reported on December 19, 2011, mine development projects are on   
track at the Zandfontein section with the new infrastructure for underground ore
and waste handling systems on 3 and 4-Level having been successfully installed, 
and the ongoing development of the conveyor decline required to mine between 5  
and 9-Levels making steady progress.                                            
At the Maroelabult Section, decline development and conveyor installations are  
proceeding and the mine life of this section of CRM has been extended by two    
years to 2016.                                                                  
The Company does not expect a repeat of the negative events of 2011 at CRM      
during 2012 and anticipates production from CRM to be approximately 125,000 PGM 
ounces.                                                                         
The qualified person having reviewed the operating results presented in this    
press release is Mr. Brian Montpellier, P.Eng.                                  
Eastplats will release its full fourth quarter and year-end results on Tuesday, 
March 6, 2012.                                                                  
Total shares issued and outstanding: 928,187,807                                
For further information contact:                                                
Investor Relations                                                              
Website: www.eastplats.com                                                      
Email: info@eastplats.com                                                       
Tel: 1-(604)-685-6851, Fax: 1-(604)-685-6493                                    
NOMAD:                                                                          
Rob Collins/Bhavesh Patel                                                       
Canaccord Genuity Limited, London                                               
Tel: +44 20 7050 6500                                                           
JSE SPONSOR:                                                                    
Johan Fourie                                                                    
PSG Capital (Pty) Limited                                                       
Email: johanf@psgcapital.com                                                    
Tel: +27 21 887 9602                                                            
No stock exchange, securities commission or other regulatory authority has      
approved or disapproved the information contained herein.                       
Cautionary Statement on Forward-Looking Information                             
Certain statements included herein constitute "forward-looking statements"      
within the meaning of applicable Canadian securities legislation. These forward-
looking statements are based on certain assumptions by the Company and          
therefore, readers are cautioned that forward-looking statements are not a      
guarantee of future performance. There can be no assurance that such statements 
will prove to be accurate and actual results could differ materially from those 
expressed or implied in such forward-looking statements due to factors such as  
general economic and market conditions, changes in government legislation,      
controls, regulations and political developments.                               
The Company disclaims any intention or obligation to update or revise any       
forward-looking statements whether as a result of new information, future events
or otherwise, except to the extent required by applicable laws.                 
Date: 24/01/2012 16:37:01 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: