Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Thu 21 Jun 2012, 9:07 KBO - Kibo Mining Plc - Operational Update
KBO
KBO                                                                             
KBO - Kibo Mining Plc - Operational Update                                      
Kibo Mining Plc                                                                 
(Incorporated in Ireland)                                                       
(Registration Number: 451931)                                                   
(External registration number: 2011/007371/10)                                  
Share code on the JSE Limited: KBO                                              
Share code on the AIM: KIBO                                                     
ISIN: IE00B61XQX41                                                              
("Kibo" or "the Company")                                                       
Operational Update                                                              
Dated: 21 June 2012                                                             
Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO, AltX: KBO) the mineral    
exploration and development company focused on gold, nickel, coal and uranium   
projects in Tanzania, is pleased to provide an operations update. The Company   
has received final results from its Stage 1 exploration programme at its Lake   
Victoria, Haneti amd Morogoro projects which it implemented over the period     
October 2011 to March 2012. The results highlights are shown below and discussed
in detail later in this announcement. The results are very encouraging, and     
support the programme`s primary objective of identifying initial targets for    
near term drilling. Drilling together with extension of early stage exploration 
surveys over more of the Company`s large licence portfolio will be part of a    
Stage 2 programme to commence in Quarter 3, 2012.                               
Summary Highlights                                                              
*Lake Victoria - Drill and trenching targets resolved on three Prospecting      
Licences;                                                                       
*Haneti - Drill targets for nickel sulphide mineralisation resolved from        
ground electromagnetic surveys at Mwaka and Mihanza Hills;                      
*Morogoro South - Six gold-in-soil anomalies identified from regional           
sampling along the central 28 km strike length of the Ruvu Nappe;               
*Morogoro North - Ten gold-in-stream anomalies identified from regional         
stream sediment sampling over two southern Morogoro North Prospecting           
Licences.                                                                       
Louis Coetzee CEO of Kibo commented:                                            
"The Board is pleased to provide this operational update and to inform          
shareholders that all the objectives set for Stage 1 of Kibo`s two stage        
exploration program have been achieved, i.e. technical, cost and time. With     
regard to cost and time it is worth noting that the company completed Stage 1   
two months ahead of schedule and within the approved budget"                    
Operations Details                                                              
Introduction                                                                    
Kibo`s Lake Victoria, Haneti and Morogoro projects give the Company access to an
approximate 18,000 km2 land package of highly prospective early stage           
exploration ground for gold and base metals within Tanzania`s established and   
newly emerging mineral exploration areas. Stage 1 field exploration, the results
of which are being reported here, had a budget of GBP1.3M and was the first     
stage of a board approved GBP5.3M exploration programme to comprehensively      
evaluate these projects with the objective of discovering and outlining gold    
(Lake Victoria and Morogoro) and base metal (Haneti) resources. The Company     
implemented the Stage 1 programme to follow up on priority target areas which   
were selected based on positive results from previous regional sampling surveys 
and geological reconnaissance. The programme comprised three main elements of   
early stage exploration surveys as follows:                                     
1. In-fill soil surveys over gold anomalous areas identified from previous      
regional soil surveys within selected prospecting licences on the Lake          
Victoria project;                                                               
2. Pitting and ground geophysics at Haneti to test both laterite and sulphide   
nickel targets identified from previous soil, trenching and geophysical         
surveying;                                                                      
3. First pass regional stream and soil sampling surveys over priority areas     
identified on Morogoro South (Ruvu Nappe geological target) and Morogoro        
North (Berega and Gairo areas).                                                 
The areas identified for this initial work represent about 5% of the total      
ground area potentially available to the Company and covers those Prospecting   
Licences ("PLs") which have been recently issued ("active PLs") from the large  
portfolio of Company applications, renewals and offers that are in the pipeline.
As Tanzanian licence regulations do not permit commencement of field work in an 
area until the relevant PL becomes active and there is a system delay of up to 1
year in processing and issuing PLs, the Company did not have all the licences   
available to it for exploration for which exploration expenditure had been      
allocated.                                                                      
This has resulted in just GBP0.6M expenditure from the Stage 1 budget of GBP1.3M
during the exploration period with the shortfall affecting the Lake Victoria    
project in particular. The balance will be carried forward as part of Stage 2   
exploration to be expended as PLs become active. It should be noted that many of
these PLs encompass highly prospective areas which remain to receive first pass 
exploration.                                                                    
The following section describes in detail the field work carried out during     
Stage 1 exploration. Maps to accompany this section can be found under the      
"Projects" menu on the Company`s website www.kibomining.com.                    
Lake Victoria                                                                   
Introduction                                                                    
Work on the Lake Victoria project focused primarily on areas where previous     
reconnaissance soil sampling has produced anomalous gold values. Three PLs were 
selected for follow up infill soil sampling, 6283/2010, 7589/2012 and 7590/2012.
A fourth, 5243/2008, which had not received previous work was also selected for 
detailed soil sampling based on its proximity to a small historic gold showing. 
PL 6283/2010                                                                    
A total of 397 infill soil samples were taken on PL 6283/2010 centred on a small
banded ironstone ridge over which regional sampling from 2007 had produced a    
number of values in excess of 100 ppb gold. An area of 3.7 km2 on a grid spacing
of 100 m by 100 m was sampled to verify and provide infill soil sample coverage.
The results confirm and further resolve the previous anomaly which now extends  
to the NW from the ridge over 2 km and remains open-ended to the NW. Soil gold  
values on the ridge where bedrock is exposed are up to 219 ppb while the anomaly
is defined by gold values in the range 20 to 50 ppb off the ridge towards the   
NW. Further work in this area will comprise trenching and sampling across the   
anomaly on the ridge top to ascertain if zones of economic gold grades can be   
established in bedrock. Soil sampling will also be extended to the NW to define 
the full extent of the gold anomaly. Should the results of this work prove      
encouraging, Rotary air blast (RAB) drilling will be undertaken to test for gold
mineralised zones particularly in areas where the soil anomaly may persist over 
deeper regolith cover to the NW.                                                
PL 7589/2012                                                                    
A total of 266 infill soil samples were taken on PL 7589/2012 over an area of   
1.8 km2 on a banded ironstone ridge where soil regional sampling from 2007      
showed values in the general range 20-50 ppb with a maximum outlier value of 524
ppb. The infill soil sampling was undertaken on a grid at 50 m by 100 m and the 
results define a gold anomaly broadly coincident with the NW trending ridge over
a distance of 1.5 km. The gold anomaly is defined on gold values in the range of
20 to 50 ppb and a maximum value of 149 ppb. The gold values whilst considered  
anomalous are not exceptional given their location on a ridge of ironstone      
outcrop and rubble where they most likely reflect the background gold values to 
be expected in this type of rock. However they are sufficiently interesting to  
warrant additional prospecting, rock sampling and trenching particularly at     
locations where gold-in- soil values are highest.                               
PL 7590/2012                                                                    
A total of 353 infill soil samples were taken on PL 7590/2012 over an area of   
3.2 km2 where previous regional soil sampling results showed some multi-point   
anomalous gold values in the range 20 -50 ppb on four sample lines 400 m apart. 
The infill soil sample results are very encouraging and have resolved the       
previous sample results into a number of multi-point and individual high gold in
soil values which collectively show a NW trend. Anomalous gold values are in the
general range 20 to100 ppb with high outlier values of 543, 133 and 187 ppb. The
sampled area which covers flat cultivated land provides an immediate RAB        
drilling target for the Company`s Stage 2 exploration programme.                
PL 5243/2008                                                                    
A soil sampling survey was undertaken on PL 5243/2008 immediately to the south  
of a small historic gold working on an area of mapped greenstone to test for    
possible additional mineralised structures associated with this working. The    
soil sampling grid was orientated N-S, sample lines were 400 m apart and        
sampling was at 200 m stations. A total of 180 samples were taken over an area  
of approximately 15 km2. Apart from one single anomaly point of 50 ppb, 30% of  
the samples showed gold values in the range 1 to 20 ppb and the remainder had   
gold values less than the detection limit. The soil results here are            
disappointing and this PL will not be a priority for follow up during Stage 2   
exploration.                                                                    
Planned Stage 2 work at Lake Victoria                                           
Specific follow up work on PLs 6283/2010, 7589/2012 and 7590/2012 where         
encouraging results have been obtained from Stage 1 exploration will comprise   
extension of infill soil sampling, trenching, geological mapping, rock sampling 
and RAB drilling. It is likely that a RAB drilling programme will be undertaken 
on PL 7590/12 in the near term while the other PLs will require further surface 
evaluation (trenching, rock sampling and geological mapping) to see if drilling 
programmes are warranted. Concomitant with the work on these areas, geological  
appraisal of the remaining large number of Kibo licences within Lake Victoria is
on-going and field programmes will be implemented according as the PLs become   
active.                                                                         
Haneti                                                                          
Field exploration at Haneti followed up on the anomalous nickel values          
previously obtained from soils, pitting and trenching in the Kwahemu, Yobo,     
Mihanza and Mwaka hill areas east of Haneti Village. Previously reported results
included 93 m at 0.4% nickel from trenching Mwaka Hill and a soil anomaly with  
values of 0.1% to 0.3% nickel at Kwahemu Hill. The field programme at Haneti    
comprised two elements:                                                         
A. Initial pitting programme to evaluate depth of weathering and nickel laterite
potential in the lower relief areas between and adjacent to the small hills such
as Kwahemu and Yobo where modestly nickel enriched laterite profiles have been  
established from previous pitting and sampling surveys;                         
B. Ground EM and magnetic surveys over Mwaka and Mihanza Hills to verify nickel 
sulphide potential on these target areas where a previous Induced Polarisation  
(ground geophysical method) survey at Mihanza had already identified a conductor
suggesting the possible occurrence of nickel sulphide mineralisaton at depth.   
Pitting                                                                         
The pitting programme at Haneti was undertaken between the NW end of Kwahemu    
Hill and Mwaka Hill over an area of 10 km2. Pits were manually excavated at 400 
m spacing along three NE-SW lines of lengths 2, 2.8 and 3.2 km respectively. A  
total of 23 pits were planned but hard ground conditions allowed for just 14    
pits to be successfully excavated and sampled. Pits were dug to depths varying  
from 1.7 m to 4.9 m (depending on ground conditions) and channel sampled down   
the sidewalls in contiguous intervals varying from 0.3 m to 1 m. The pit        
profiles showed poor laterite development over the area sampled and the majority
of the pits encountered bedrock of serpentinite, amphibolites or granite-gneiss 
at shallow depth. A total of 52 samples including QC samples were submitted to  
ALS labs in Mwanza (preparation) and onward to Johannesburg for 30 g gold fire  
assay and multi-element analyses. As expected from the shallow regolith profiles
the sample results showed no significant values for all elements and the maximum
nickel value was 0.27%.                                                         
The pitting survey was a trial programme to test the potential for the          
development of a deep laterite profile with economic nickel grades at the       
sampled locations. While the results show no laterite nickel potential in the   
area tested, the results do provide valuable geological information and confirm 
serpentinite sub-outcrop over a wider area than had been previously mapped.     
Weathering of this rock in a favourable geological environment provides the     
source for lateritic nickel and the area tested represents <10% of a larger belt
which extends up to 80 km along strike and uncertain maximum width which is     
believed to be underlain by this type of rock. Based on the results and         
difficulties encountered in penetrating the hard ground, further testing of     
laterite nickel potential will be by RAB drilling.                              
Ground EM & magnetic survey                                                     
The ground electromagnetic (EM) and and magnetic surveys were carried under     
contract by Spectral Geophysics of Botswana (Spectral) over areas of 7.2 km2 and
7.56 km2 at Mwaka and Mihanza Hills respectively. Time domain EM surveying      
(TDEM) was conducted over 500 m by 200 m rectangular transmitter loops at 50 m  
stations on NW-SE trending lines 200m apart using a 3 component time domain     
system with a base station frequency of 1 Hz.                                   
Magnetic surveying was carried out over the same gridded area. The results      
presented below are summarised from the geophysical report prepared by Spectral 
on their interpretation of the results from the surveys.                        
At Mwaka Hill, the EM results have indicated two NW-SE trending conductors of   
800m and 400m in length respectively which could be associated with nickel      
sulphide mineralisation at depth. The significance of these conductors can now  
only be ascertained by drilling and they provide two well resolved drill targets
which will be tested as part of Stage 2 exploration at this locality.           
At Mihanza Hill, the EM results has indicated a large formational conductor,    
which is most likely associated with serpentinised ultramafics. However, the    
geophysical report suggests a possibility that this conductor may be caused by  
nickel sulphide mineralisation at depth and it is likely that the Company will  
also test this target as part of a Stage 2 drill programme at Haneti.           
Planned Stage 2 work at Haneti                                                  
The initial Stage 2 exploration activity at Haneti will comprise the            
implementation of a diamond drill programme to test the drill targets identified
in the Spectral geophysical report at Mwaka and Mihanza. Exploration for nickel 
sulphide targets and gold will take priority over nickel laterite exploration   
during during Stage 2. Should the planned drilling at Mwaka and Mihanza         
encounter nickel sulphide mineralisation, it is planned to implement an airborne
EM survey over the entire Haneti ultramafic belt in order to generate more drill
targets for this type of mineralisation. Prospecting, rock sampling and mapping 
will continue in the southern and western parts of the Haneti project during    
Stage 2 where on-going artisanal mining indicates potential for the discovery of
significant greenstone related gold mineralisation.                             
Recent Developments                                                             
The Company`s recent announcement of the 8th May 2012 on the signing of a       
Memorandum of Understanding to pursue a strategic joint venture with Brazilian  
industrial conglomerate Votorantim for the further exploration of the Haneti    
project represents an independent affirmation of the prospectivity of this area.
Contingent on the conclusion of a Joint Venture, Votorantim will be required to 
spend up to GBP2.7M in exploration over a period of three years to earn a 50%   
interest. This will allow the Company to accelerate exploration over this large 
project for both nickel-PGMs and gold at minimum cost.                          
Morogoro South                                                                  
Field exploration at Morogoro South focused on a regional geological structure, 
the Ruvu Nappe which is associated with both artisanal alluvial and hard rock   
mining at various locations along 45 km of its length. Kibo undertook regional  
soil sampling across the central 28 km portion of the structure over which it   
holds active PLs.                                                               
Soil sampling was carried out at 100 m stations on 8 E-W trending lines, 3 to 4 
km apart and 9 km to 13 km in length. The sampling lines were orientated to cut 
across the strike of the N- S trending Ruvu Nappe at wide spaced intervals to   
target any gold mineralised zones that may be coincident with, or parallel to   
the structure. A total of 922 samples including QC samples were submitted to ALS
labs in Mwanza (preparation) and onward to Johannesburg for 30 g gold fire assay
and multi-element analyses.                                                     
The majority of the gold values were at or below expected background values of 1
to 5 ppb. However within this population there are a number of anomalous values 
up to a maximum of 156 ppb which occur in clusters of 1-3 consecutive sample    
points. These provide 6 target areas for follow up sampling, prospecting and    
geological mapping during Stage 2 exploration. Significantly, one of these gold 
anomalies shows coincident anomalous geochemistry for arsenic, bismuth and      
stibnite which are important gold pathfinder elements in some geological        
terrains and should prove useful in follow up work and extension of regional    
soil & stream sediment sampling surveys to other areas within the Morogoro South
tenements.                                                                      
Planned Stage 2 work at Morogoro South                                          
Near term Stage 2 exploration at Morogoro South will comprise detailed          
evaluation of the anomalous gold-in-soil anomalies identified from the Stage 1  
results by detailed infill soil sampling and geological prospecting, mapping and
rock sampling. Should drill targets emerge from this work, these will be tested 
later in the Stage 2 work programme. Regional soil and stream sediment sampling 
and geological prospecting, mapping and rock sampling surveys will be extended  
to other PLs in the Morogoro South Block as they become active.                 
Morogoro North                                                                  
Kibo`s Stage 1 exploration at Morogoro North comprised an extensive stream      
sediment sampling survey for gold on the southern part of the exploration block 
on PLs 6717/2010 and 6598/2010 around the villages of Gairo and Berega. This    
area is hilly with a good drainage and the Company considered stream sediment   
sampling to be as an efficient early stage exploration technique for this region
to resolve areas for more detailed follow up work. The survey encompassed an    
area of about 200 km2 and was sampled at a density of 2-3 samples per km2 for a 
total of 563 samples. Following an initial first pass survey and review of gold 
results, follow up sampling was undertaken around some anomalous areas to       
provide greater resolution of the anomalies.                                    
97% of the samples show gold values in the range <1 to 20 ppb with the remaining
3% of the samples (16 samples) showing anomalous values in the ranges 20 -50 ppb
(8 samples) and >50 to 826 ppb (8 samples). These anomalous values with greater 
than >20 ppb gold-in- stream provide 10 priority sub-areas for follow up work.  
Planned Stage 2 work at Morogoro North                                          
Regional stream sediment sampling has been successful at Morogoro North in      
resolving 10 sub-areas for follow up work during Stage 2 exploration. Stage 2   
work will include infill stream sampling, soil sampling, prospecting/rock       
sampling and geological mapping over these areas. In addition to these          
activities, the stream sediment sampling survey will be extended to other       
licences in the Morogoro North block where the terrain is appropriate to this   
type of early stage regional survey. Should drill targets emerge quickly from   
this work, they will be tested later during Stage 2 exploration.                
Review by Qualified Person                                                      
The information in this announcement that relates to exploration results,       
mineral resources or ore reserves is based on information reviewed by Noel      
O`Keeffe, PGeo who is a member of the Institute of Geologists of Ireland. Noel  
O`Keeffe is also the Exploration Director of Kibo. Noel O`Keeffe has at least   
five years experience within the sector which is relevant to the style of       
mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a qualified person under the AIM Rules. Noel    
O`Keeffe consents to the inclusion in this announcement of the matters based on 
his information in the form and context in which it appears.                    
Enquiries                                                                       
Louis Coetzee +27 (0)83 2606126  Kibo Mining plc    Chief Executive Officer     
Noel O`Keeffe +353 (0)91 865367  Kibo Mining plc    Exploration Director        
Stuart Laing  +61 8 9480 2506    RFC Ambrian        Nominated Adviser           
                                Limited                                         
Andreas       +27 (0)83 4408365  River Group        Corporate Adviser and       
Lianos                                              Designated Adviser (AltX)   
Matthew       +44 (0)207 7968829 Northland Capital  Broker (Assistant Director, 
Johnson                                             Corporate Finance)          
Nick Bealer   +44 (0)207 7109612 Cornhill Capital   Broker (Corporate Broking)  
                                Ltd                                             
Matt Beale    +44 (0)7966 389196 Fortbridge         Public Relations            
General Background & Strategy                                                   
Kibo is a public company registered in Ireland (company number 451931). Its     
registered office is Kibo Mining plc, Suite 3, One Earlsfort Centre, Lower Hatch
Street, Dublin 2, Ireland. Kibo was established in early 2008 to explore and    
develop mineral deposits in Tanzania, East Africa and was admitted to AIM on 27 
April 2010 and AltX in South Africa on 30 May 2011.                             
The Board of Kibo is composed of experienced professionals spanning mineral     
exploration, mine development, mining finance and financial control of public   
companies. It is supported by well trained and motivated Tanzanian staff that   
operates from Kibo`s exploration offices in Dar es Salaam and Mwanza.           
The mineral assets of the Company comprise three existing and two newly acquired
projects in Tanzania - Haneti (nickel, platinoid elements and gold), Morogoro   
(Gold) and Lake Victoria (Gold) which give Kibo access to over 18,000 km2 of    
early stage exploration licences in Tanzania`s premier gold mining region, the  
Lake Victoria Goldfield and within the newly emerging gold exploration regions  
in eastern Tanzania.                                                            
The Company has recently also acquired, subject to certain suspensive closing   
conditions and approvals, coal and uranium exploration projects as publicly     
announced on 2 April 2012 in accordance with its multi-commodity exploration    
strategy.                                                                       
Kibo`s objective is to enhance Shareholder value through acquisition,           
exploration and development of mineral assets in Tanzania. This objective will  
be pursued primarily through active exploration, particularly drilling on its   
current projects and by using the Company`s experience in Tanzania to acquire   
further quality mineral projects on competitive terms that can be quickly       
evaluated and taken to the next stage of development. Kibo will undertake       
continual risk assessment of its projects and take whatever actions it believes 
are necessary to ensure that these risks are mitigated.                         
Updates on the Company`s activities are regularly posted on its website         
www.kibomining.com                                                              
London                                                                          
Corporate and Designated Advisor                                                
River Group                                                                     
21 June 2012                                                                    
Date: 21/06/2012 09:07:56 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.                                          
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: