Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Thu 23 May 2002, 0:00 Energy Africa Limited - Preliminary Results For Th
Energy Africa Limited - Preliminary Results For The Year Ended 31 March 2002    
ENERGY AFRICA LIMITED                                                           
Registration number: 1995/007140/06                                             
(Incorporated in the Republic of South Africa)                                  
JSE code  :  ENR                                                                
ISIN code :  ZAE000010427                                                       
PRELIMINARY RESULTS FOR THE YEAR ENDED 31 MARCH 2002                            
Energy Africa, the South African-based international oil and gas exploration    
and production company which is listed on the Johannesburg and Luxembourg       
Stock Exchanges, reports a 21% increase in average production and               
substantial increase in oil reserves.                                           
*  Five significant discoveries in Equatorial Guinea to the year end and        
further success thereafter                                                      
*  Major potential for further discoveries                                      
*  Average production increased by 21% to 21 400 bpd                            
*  Commercial oil reserves rose by 22% to 58 million barrels                    
*  Potentially commercial oil reserves rose by 118% to 37 million barrels       
*  Cash inflow from operations was up 2% to $96 million, despite 18% lower      
average oil price and planned Ceiba shut down                                   
*  Strong balance sheet to support future activity                              
*  Important additions to exploration portfolio                                 
*  Active development program                                                   
Commenting on the results, Rhidwaan Gasant, Managing Director of Energy         
Africa, said:                                                                   
"This has been a highly successful year for Energy Africa. We have achieved     
considerably higher production levels and had outstanding exploration           
success which has all been financed out of our cash resources. We are very      
confident about the future with a busy exploration and development line-up.     
We look forward to an exciting and active exploration and development           
program ahead."                                                                 
23 May 2002                                                                     
Enquiries:                                                                      
Energy Africa Limited                                                           
Rhidwaan Gasant                                                                 
Adrian Nel                                                                      
Tel: +27 21 400 7600                                                            
Corporate Image, Cape Town                                                      
Tamra Veley                                                                     
Tel: +27 21 426 1233                                                            
College Hill, London                                                            
Nicholas Williams                                                               
Tel: +44 20 7457 2020                                                           
Chairman`s statement                                                            
Since my last statement twelve months ago your Company has enjoyed              
phenomenal success with its exploration drilling activities in Equatorial       
Guinea. With significant additional prospectivity on Blocks F and G, the        
Company is well positioned for further success there.                           
There has also been encouraging progress in relation to the Company`s           
development project portfolio in Congo, the United Kingdom Continental          
Shelf, Gabon and Equatorial Guinea. Importantly also, the Company`s             
exploration portfolio has been expanded through the acquisition of new          
exploration acreage in Uganda, Mauritania and Gabon.  The asset base of the     
Company is under constant review so that appropriate portfolio management       
decisions can be made.                                                          
During the period total commercial oil reserves increased by 22% to 58          
million barrels and potentially commercial oil reserves increased by 118% to    
37 million barrels. Production increased by 21% to 21 400 barrels per day.      
Cash flow from operations increased despite the significantly lower oil         
prices ruling during the year.  Your Company`s balance sheet remains strong     
with net cash at the year-end, having funded an active development and          
exploration program entirely from internal cash resources. The active           
development program will require external funding - the $50 million limited     
recourse facility secured this year will be augmented by another tranche of     
debt. Additional funding will be required when the optimised development of     
the Okume/Oveng complex is implemented and  there is  more time to  consider    
the  available options in this regard.                                          
Oil prices have remained strong notwithstanding a period when the demand        
side has been weak, particularly after the tragic events of September 11        
2001. Although short-term market fundamentals combined with continuing          
political tensions in the Middle East have underpinned crude oil prices,        
these are likely to remain volatile. Fortunately your company`s business        
remains resilient to lower oil prices.                                          
During the financial year, our partner and operator in Equatorial Guinea        
Triton Energy, was acquired by Amerada Hess. We are pleased to report that      
the very good working relationship we have had with Triton has continued        
with our new partner, who brings valuable deep water operating experience to    
the joint venture.  It is also encouraging that Amerada and industry            
analysts consider the deal to have attributed significant upside, in terms      
of future discoveries and value, to Triton`s Equatorial Guinea interest.        
Recent excellent performance by Exploration and Production companies in the     
United Kingdom where many of your Company`s peers are domiciled, has            
rekindled interest in the Exploration and Production sector there.  It is       
particularly encouraging that your Company is regarded as one of the pre-       
eminent small cap E&P companies in that sector.                                 
I believe that your Company is well positioned to achieve substantial future    
growth in its net asset value per share.                                        
As reported in this year`s Interim Report, Rhidwaan Gasant was appointed to     
the Board as Managing Director in August 2001.  At that time, he was joined     
on the Board by Andrew Windham as Commercial Director, while Adrian Nel was     
appointed Chief Operating Officer.  Since then both Almorie Maule and Ahmad     
Said have resigned from their positions as non-executive directors and I        
would like to thank them both, on behalf of the Company, for their              
significant contributions whilst serving on the Board.                          
I am very pleased to welcome in their places as non-executive directors,        
George Paul, who joined the Board in March and Tunku M Fawzy bin Muhiyiddin,    
the new Chief Executive of Engen Petroleum Ltd, who joined the Board in         
April.                                                                          
Once again I would like to record my gratitude and appreciation to the          
management and staff at Energy Africa for all their hard work and commitment    
during this extraordinarily successful year. Their contribution is, as you      
will be well aware, vital to the continued success of your Company.             
Dato` M Idris Mansor                                                            
Chairman                                                                        
Managing director`s review                                                      
It gives me great pleasure to present my first review as Managing Director      
at a time when Energy Africa has enjoyed the most successful period in its      
history.                                                                        
The Company has achieved almost continuous success with its exploration         
drilling activities in Equatorial Guinea - its last six exploration and four    
of five appraisal wells there have been successful. What is even more           
encouraging is that there is still significant additional prospectivity on      
the Blocks and several exploration wells are expected to be drilled there in    
the next twelve months.                                                         
In total, nine exploration wells and nine appraisal wells were drilled, 13      
of which were successful and one of which has been suspended as a potential     
water injection well. This excellent level of performance with the drill bit    
has deservedly attracted most attention, but there has been considerable        
activity elsewhere in the business.                                             
In the Congo, following the successful Bilondo appraisal well, development      
of the field is likely to proceed if the tendering process results in an        
acceptable capex profile. The successful test of the Nkossa South South         
prospect has also added significant incremental reserves to the Nkossa          
field. On the UK Continental Shelf, the Alba Extreme South and Caledonia        
developments were approved and are on schedule for first oil production in      
October 2002.  As a consequence of the additional discoveries close to Okume    
and Oveng in Equatorial Guinea, the opportunity to optimise the development     
of the whole complex is being pursued in order to minimise development cost     
through economies of scale.                                                     
As reported at the Interim stage we have acquired new exploration acreage in    
Uganda and drilling on one of the licences is expected to take place later      
this year.  Since then we have also acquired a new exploration interest         
offshore Mauritania and have recently announced the acquisition of a new,       
operated, exploration block named Akoum, offshore Gabon in the area             
surrounding our existing producing Tchatamba fields.                            
The result of the Kudu-6 exploration well in Namibia, drilled at a location     
some 27km north of the Kudu main field to achieve the magnitude of              
additional reserves required for an LNG project, proved disappointing. The      
well failed to intersect the aeolian (dune) sand reservoir present in the       
main field, and the floating LNG project has therefore been shelved for the     
immediate future. An appraisal well, Kudu-7, sited to prove additional          
reserves for the South African market, is currently being drilled.              
Commercial oil reserves have increased from 47 million to 58 million barrels    
after production during the period of 8 million barrels.  Potentially           
commercial oil reserves have increased from 17 million to over 37 million       
barrels. Gas reserves have remained unchanged.                                  
Notwithstanding the anticipated temporary reduction in production levels        
from Equatorial Guinea, which resulted from declining reservoir pressure        
prior to the installation of water injection and the 14 day shutdown during     
the successful changeout of the FPSO at Ceiba, average production for the       
year increased by 21% to 21 400 barrels per day, exceeding our forecast.        
Since the resumption of production at Ceiba, the Company`s share of             
production has increased to over 9 000 barrels per day, lifting March 2002      
average production for the Company to around  24 000 barrels per day. We        
expect average production for the financial year 2003 to approximate 25 000     
barrels per day.                                                                
The higher production was offset by the significantly lower average oil         
price for the current year and the higher per barrel cost of production at      
Ceiba (partially as a result of the temporary decline in production)            
limiting the increase in net cash inflow from operations of $96 million, to     
2%. We expect that cash operating costs per barrel will decline in the year     
ahead.                                                                          
The Company is well placed to pursue growth opportunities in the future with    
the strong balance sheet reflecting net cash (after deducting borrowings) of    
almost                                                                          
$9 million at the year-end, having funded the continuing active development     
and exploration program from internal cash resources. During the year we        
secured a $50 million limited recourse revolving facility based on the Alba     
oil field, to fund our development cost program. To date we have drawn $10      
million of this facility. We are currently negotiating a further tranche of     
debt, which is likely to be completed by the end of the calendar year.          
Additional funding will also be required when the optimised development of      
the Okume/Oveng complex is implemented, although, as the Chairman has           
stated, there is now more time for consideration to be given to the question    
of our funding options.                                                         
Crude oil prices are, as the Chairman says in his Statement, likely to          
remain volatile. Although our business remains resilient to lower oil           
prices, we are considering the possibility of some limited form of              
protection for the Company from the downside of significantly lower oil         
prices, during a period when our active development program is being funded     
by increased borrowings.                                                        
Turning to the year ahead, we again have a very active development program.     
In addition to the Alba Extreme South, Caledonia and Moho-Bilondo               
developments, which I have already mentioned, the current phase of the Ceiba    
development will be completed with the drilling of three further production     
wells and two additional water injectors. Installation of multi-phase subsea    
pumps will also commence. In Gabon the onshore Niungo field should come         
onstream in September as should the offshore Etame field in which EAGSA has     
an option to participate. Further development drilling is also planned for      
the Turnix and Limande fields. Development of the complex of fields in the      
Okume/Oveng area referred to above, is still in the planning and design         
phase but it is anticipated that some development activity will occur in the    
current year, in addition to a number of appraisal wells which are planned      
to determine reserves and field boundaries more accurately.                     
Our planned exploration program for the coming twelve months includes at        
least eight exploration wells in Blocks F and G in Equatorial Guinea, mainly    
to test play fairways away from the area of the current discoveries and a       
number of appraisal wells. Additionally we plan two exploration wells in the    
recently acquired Akoum permit in Gabon, one in Egypt, one in Uganda and one    
or two in the Congo joint development area.  We also anticipate that at         
least two wells will be drilled in permits in Gabon where EAGSA has the         
option to participate in the event of success. An appraisal well is also        
currently being drilled in the Kudu licence in Namibia.                         
Further appraisal drilling may be required in the event of exploration          
success elsewhere.                                                              
Total development expenditure for the year ahead is estimated at                
approximately $85 million, while exploration expenditure is projected at        
approximately $35-$45 million. We expect that strong internally generated       
cash flows, augmented by appropriate credit facilities will provide the         
funding for another active year ahead.                                          
Rhidwaan Gasant                                                                 
Managing Director                                                               
Financial and operating review                                                  
Results for the year ended 31 March 2002                                        
In order to reflect Energy Africa`s financial results in a more meaningful      
way, the Directors have decided to change the Group reporting currency from     
Rands to US dollars.  All revenues and almost all costs are US dollar           
denominated.  The assets and liabilities are also principally in US dollars.    
This change brings the company into line with the oil exploration and           
production industry worldwide.  The comparatives have accordingly been          
restated to US dollars.                                                         
Summary                                                                         
Energy Africa reports another set of solid financial results.  The group`s      
financial performance reflects its sustained growth in production offset by     
the significantly lower oil prices over the year.  The strong cash              
generation, demonstrated in the increase of 2% in cash flow from operations,    
enables the group to continue to aggressively pursue its reinvestment plans.    
Cash flow                                                                       
Net cash inflow from operations was $95.5 million (2001: $93.7 million), a      
2% increase from 2001.  This increase reflects the increase in production of    
21% from 17 700 bbl per day in 2001 to 21 400 bbl per day in 2002.  Average     
oil prices for 2002, however declined by 18% compared to 2001.                  
Exploration expenditure amounted to $31.2 million (2001: $39.5 million).        
Development expenditure comprised $69.3 million (2001: $71.5 million), of       
which $46.9 million was in Equatorial Guinea on the development of the Ceiba    
field.  Net cash outflow before financing was $17.4 million (2001: $31.5        
million).                                                                       
Financing activities resulted in a net cash inflow of $7.1 million (2001:       
outflow $3.0 million).  Proceeds from the issue of shares was $1.7  million     
(2001: $1.3 million).  Loan drawings on the $50 million revolving credit        
facility amounted to $10.0 million.  Loan repayments, comprising mainly the     
final repayments on the Nkossa project loans, were $4.6 million (2001: $5.3     
million).  The resulting net cash outflow after financing was $10.3 million     
(2001: $34.5 million).                                                          
Income statement                                                                
Turnover for the year increased by 4% to $144.0 million from $138.5 million     
in 2001.  Production sold during the year was 7.1 MMbbl (2001: 5.5 MMbbl),      
an increase of 28%, which was largely offset by the 18% decline in the          
average realised oil price per barrel to $20.56 from $25.16 in 2001.            
Turnover is reflected after delivering 0.7 MMbbl (2001: 0.9 MMbbl) of           
hydrocarbons to host governments under the terms of Production Sharing          
Agreements.                                                                     
Cost of production was $74.8 million compared to $50.8 million in 2001.  On     
a per barrel basis, total cost of production was $9.56 per barrel (2001:        
$7.86 per bbl).  Cash operating cost increased to $4.49 per bbl from $3.87      
per bbl in 2001 mainly as a result of the shut down of Ceiba for the            
commissioning of the new FPSO, the Sendje Ceiba, and the decline in             
production prior to the shut down.  This per bbl operating cost is expected     
to decline toward historic levels in the future.  Depletion also increased      
to  $4.53 per bbl from $3.60 per bbl in 2001.  This increase reflects the       
greater contribution of the deep water Ceiba field and Gabon, both of which     
have higher costs per bbl.                                                      
Exploration/appraisal costs written off in the year decreased to $26.8          
million (2001: $35.7 million) reflecting the capitalisation during the year     
of $10.6 million of successful appraisal drilling in Equatorial Guinea and      
Congo.  After administration charges of $7.9 million in the year (2001:         
$10.6 million), operating profit in 2001 was $34.4 million (2001: $43.2         
million).                                                                       
Taxation decreased to $12.6 million in 2002 from $20.0 million in 2001          
mainly due to lower revenues in the UK and South Africa.  The decrease in       
the effective tax rate was primarily due to the lower exploration               
expenditures in jurisdictions which do not have corporation tax regimes or      
those areas in which exploration expenditure could not be set off against       
income from producing assets.                                                   
Profit after taxation was $20.6 million for 2002 compared to $25.1 million      
in 2001.                                                                        
Balance sheet                                                                   
Fixed assets at year end were $199.2 million (2001: $142.6 million) and         
comprise mainly the net book values of the producing assets.                    
Current assets included cash of $18.8 million (2001: $29.3 million).  In        
December 2001 a $50 million limited recourse reducing revolving credit          
facility was concluded and at the year end $10.0 million was drawn on the       
facility.  During the year the project loans to finance Nkossa were repaid      
in full.  At the end of the year Energy Africa had net cash of $8.8 million     
(2001: $24.7 million).                                                          
Operations                                                                      
Production and development                                                      
Energy Africa`s working interest share of production for the year ended 31      
March 2002 was 7 823 000 bbls of oil and LPG, an average of 21 430 bpd          
(2001: 17 700 bpd).  Production from the Ceiba Field rose some 2 900 bpd and    
together with increased production from Gabon, accounted for the 21% rise in    
production.  Development activities continued in the Ceiba Field in             
Equatorial Guinea and in January 2002 the Sendje Berge FPSO was replaced by     
the Sendje Ceiba with larger fluid handling capacity (160 000 bbls/d) and       
water injection facilities.  In the UK North Sea, Government approval for       
the Alba Extreme South and Caledonia developments was received and in Gabon     
the development of the Niungo field was initiated following the successful      
Niungo-5 appraisal well.                                                        
The average Brent oil price for the year was $23.28 per bbl, an 18% decrease    
relative to the $28.22 achieved in 2001.  The average realised oil price        
declined from $25.16 to $20.56, a decrease of 18%.  The increase in the         
average percentage discount is attributable to a general increase in the        
discount for heavy crudes which affects the Alba field in particular,           
partially offset by the elimination of the introduction discount for the        
Ceiba crude.                                                                    
Exploration and appraisal                                                       
Nine exploration wells were completed in the year.  Six resulted in oil         
discoveries, one in a sub-commercial oil discovery and two were dry.  Five      
of the oil discoveries were in Blocks G and F in the Rio Muni Basin in          
Equatorial Guinea and one in the Haute Mer Permit in the Congo.                 
Seven appraisal wells were completed by year-end, and two thereafter.  Of       
the nine wells, five were in Equatorial Guinea, two in Gabon and one each in    
the Congo and Namibia.  Four of the wells in Equatorial Guinea were             
successful and were suspended for possible use as production wells.  In the     
Congo, the Bilondo-2 well was successfully tested.  In Gabon, the Turnix TUM-   
B2 well was completed and brought on production and in the Niungo field the     
Niungo-5 well was successful, triggering a development decision.                
Numerous new opportunities were evaluated and interests were acquired in two    
licences in Uganda and one in Mauritania.  Shortly after year-end the Akoum     
licence in Gabon was signed. In Morocco 3-D seismic surveys were acquired in    
both of the company`s licence areas and a 2-D seismic survey was acquired in    
the onshore area of the Uganda licences.                                        
Reserves                                                                        
At 31 March 2002, the net commercial oil reserves attributable to Energy        
Africa totalled 57.9 MMbbls.  This is an increase of 10.6 MMbbls (22%) over     
the 47.3 MMbbls brought forward at the beginning of the year.  The increase     
comprises transfers from potentially commercial reserves and revisions to       
reserves offset by production of 7.8 MMbbls during the year.                    
Oil reserves in the potentially commercial category rose from 17.1 MMbbls to    
37.3 MMbbls, an increase of 118%.                                               
Potentially commercial gas reserves remained at 210 BCF or an oil equivalent    
of 35 MMbbls.                                                                   
Angola                                                                          
An exploration well was completed in Block 9 (Energy Africa 15%) in December    
2001.  The target was potential carbonate and clastic intervals of Albian       
age in a rafted structure in shallow water.  Only minor shows of bio-           
degraded oil were encountered.  As the remaining prospects were similar to      
the one drilled, the exploration licence was terminated in April 2002.          
Congo (Brazzaville)                                                             
Gross production from the Nkossa field (Energy Africa 4%, operator              
TotalFinaElf) averaged 43 630 bpd of oil and 11 640 boepd of LPG (2001: 53      
100 bpd and 12 250 boepd).  The decline is in line with expectations.  The      
appraisal well drilled in the Nsoko satellite structure at the end of the       
previous year yielded disappointing results but potential remains for           
significant reserves and development options are being studied.  The            
exploration well drilled to test the Nkossa South South prospect was            
successful, adding significant reserves which can be produced through the       
Nkossa facilities.  Development is likely to commence late in 2003 with         
first oil in 2005.                                                              
As reported in mid-year, agreement has been reached by the Angolan and          
Congolese authorities in respect of a joint development area for the Nkoumbi    
Prospect which straddles the boundary between Angola Block 14 and the Haute     
Mer Permit.  It is anticipated that a well will be drilled by end-2002, the     
costs of which will be shared by the Haute Mer/Block 14 contractor groups.      
Egypt                                                                           
Activity on the Matruh licence (Energy Africa 20%, operator Shell) during       
the past year was focussed on prospect generation.  This resulted in the        
definition of three attractive prospects, one of which is likely to be          
drilled early in 2003.  More immediately, a well is to be drilled in the        
adjacent Obaiyed Production Area to test a gas-condensate prospect which        
extends into the Matruh licence.  If successful, the discovery can be           
produced through the Obaiyed facilities and provide early cash flow for the     
Matruh partnership.                                                             
Evaluation of acreage on offer in the March 2002 bid round did not identify     
attractive prospects and consequently no bids were submitted.  More             
attractive acreage is expected to be offered later in 2002.                     
Equatorial Guinea                                                               
In the Ceiba field (Energy Africa 14.25%) oil production for the full year      
averaged 33 050 bpd.  The change out of the Berge Hus, renamed the Sendje       
Ceiba, for the Sendje Berge FPSO, was successfully achieved in January 2002     
and by year-end eight production wells and two water injection wells were       
online.  A peak rate of over 75 000 bpd was achieved late in March.  In the     
remainder of 2002 it is planned to complete a previously drilled water          
injection well on the western flank and to drill and complete three             
additional production wells and two additional water injection wells.  The      
first phase of installation of subsea pumps is scheduled to commence in the     
last quarter of 2002.  Average production in the coming year is forecast to     
exceed 60 000 bpd but rates will be strongly influenced by the results of       
the drilling programme and the efficacy of the water injection in               
maintaining reservoir pressure.                                                 
The exploration programme in Blocks F and G (Energy Africa 15%, operator        
Amerada Hess), in contrast to the previous year, yielded outstanding            
results; the five exploration wells drilled yielded a 100% success rate,        
resulting in the Okume, Oveng, Ebano, Akom and Elon discoveries.  Three         
appraisal wells were drilled on Okume and one each on Oveng and Ebano.  Four    
of these have been suspended as potential production wells and one as a         
potential water injection well.                                                 
The discoveries are in a fairly confined area located some 20km north east      
of the Ceiba field in water depths ranging from 50m to 800m.  The proximity     
of the discoveries is favourable for a phased, integrated development and       
various options are being evaluated with a view to achieving maximum            
synergies and minimising development costs on a per barrel basis.               
Consequently the possible fast-track development option for Okume, which was    
being considered at mid-year, has been discarded and capital expenditures       
have been delayed.  First oil from this area is now likely to be achieved in    
2004.                                                                           
To date exploration drilling has been focussed in the central toe-thrust        
area.  Further prospects remain to be tested in this area but the emphasis      
in the coming twelve months will be to test prospects in the other              
prospective areas in both Blocks G and F.                                       
Gabon                                                                           
Energy Africa Gabon S A (EAGSA), in which Energy Africa has a 50% beneficial    
interest, increased its production to 13 870 bpd (2001 : 9800 bpd).  Energy     
Africa`s equity share increased from 4 900 bpd to 6 940 bpd reflecting both     
the increased production and the larger holding in EAGSA (which was             
increased from 37.5% to 50% in March 2001 with the purchase of 12.5% from       
the Gabon State).                                                               
In the Tchatamba fields (Energy African net 12.5%, operator Marathon Gabon)     
production levels were maintained at approximately 41 000 bpd (2001 : 37 000    
bpd) by development of the shallower Cap Lopez reservoir in the Tchatamba       
South field.  The Azile reservoir, also in the Tchatamba South field, will      
be brought into production in 2002 and will mitigate the natural decline in     
production from the Madiela Formation which is the main producing reservoir     
in the Tchatamba fields.  Subsequent to year-end, EAGSA signed for a 100%       
interest in the Akoum Permit which surrounds the Tchatamba fields.  A number    
of structures similar to the producing fields remain to be tested and two       
wells are planned in late 2002 / early 2003.                                    
In the Turnix field (Energy Africa net 13.75%, operator Perenco Gabon),         
reservoir performance was well below expectation and the field average for      
the year was 4 260 bpd.  A successful appraisal well was drilled in a           
southern extension to the field and came online late in March 2002.             
Depending on the well performance, a further well may be drilled later in       
the year.                                                                       
The Limande field (Energy Africa net 10%, operator Agip) averaged               
approximately 2 620 bpd for the year.  An additional production well is         
scheduled later in the year and should result in a marginal increase in         
production levels.  Subsequent to year-end, an exploration well was drilled     
in the Limande North prospect.  Good oil shows were recorded but reservoir      
development in the target intervals was very poor.                              
Two development wells were drilled in the onshore Echira field (Energy          
Africa net 20%, operator Perenco Gabon).  Mechanical problems resulted in       
inadequate reservoir intersections and flow rates have been disappointing.      
The field average for the year was 2 790 bpd, marginally below the level        
achieved in March 2001.                                                         
The Moukouti field (EA net 20%, operator Perenco Gabon), some 10km north of     
Echira, contrary to forecast, continued to produce throughout the year,         
averaging 1 490 bpd.  However the water cut is now in excess of 90% and the     
economic cut-off is likely to occur late in 2002.  In the Ganga field           
(Energy Africa net 20%, operator Perenco Gabon) an extended well test           
continued production at an average rate of 400 bpd but further development      
of the field is unlikely.                                                       
In the Niungo field (Energy Africa net 20%, operator Perenco Gabon), located    
some 40km east of Echira, the Niungo-5 well confirmed the reserve estimates     
and development of the field was commenced.  However delays in procuring        
certain items of production equipment has delayed commencement of oil           
production to September 2002.                                                   
In the ten offshore licences in which EAGSA retains options to acquire          
various levels of interest in the event of discovery or is carried through      
exploration expenditures, wells were completed in the Tolo permit (EAGSA        
10%) where the results were negative, and in the Kenguerie permit (EAGSA        
15%) where the Kenpil-1 well was sufficiently encouraging to suggest that       
the structure may contain commercial reserves although the intersection in      
the well itself was sub-commercial. Additionally a third successful             
appraisal well was completed on the discovery in the Etame permit (EAGSA        
7.5%) and first oil from a fast-track development is expected in August         
2002. Oil production net to EAGSA is expected to be of the order of 1 000       
bpd.                                                                            
The wells planned for the Agip-operated Chaillu and Mpolo permits (EAGSA 10%-   
25%) were again delayed due to rig availability and are now scheduled to be     
drilled in the third quarter of 2002.  The prospects to be drilled are both     
in water depths in excess of 1 000m and in the event of success, EAGSA`s        
options will be limited to 10% participations in terms of the production        
sharing contracts.                                                              
Libya                                                                           
Energy Africa retains a 20% interest in Blocks NC184/185 in the onshore         
Sirte Basin and has an obligation to drill one further well.  In the absence    
of viable prospects negotiations are in progress for the transfer of the        
commitment to more prospective acreage.  In the event that agreement cannot     
be reached, Energy Africa will have a liability of $800 000 in lieu of          
drilling the well.                                                              
Mauritania                                                                      
In February 2002, Energy Africa finalised the acquisition of a 20% interest     
in Block 2, (operator Woodside) offshore Mauritania from the contractor         
group comprising Woodside Petroleum, Hardman Resources and Roc Oil.  The        
acreage lies in a salt basin, south of the potentially significant              
Chinguetti discovery in Block 4 but, being on the periphery of the basin,       
has a higher risk profile than that area.  Acquisition of a 1 000km} 3-D        
seismic survey is planned for the third quarter of 2002 whereafter the          
contractor group will be required to commit to drilling a well should it        
wish to proceed into the second term of the licence.                            
Morocco                                                                         
Energy Africa reduced its holding in the Tiznit licence from 63.75% to          
31.875% by farming out half its interest to Petronas Carigali.  Energy          
Africa has retained operatorship and in August-September completed a 1000       
sq.km 3-D seismic survey over the most prospective area.  Prior to that         
Enterprise Oil, operator of the Cap Draa licence (Energy Africa 20%) had        
acquired some 2 000 sq.km of 3-D seismic data in the outboard area of the       
salt basin.  Both surveys are currently being interpreted and drilling is       
expected to commence in 2003.                                                   
Namibia                                                                         
As reported at half-year, Shell, the operator of the Kudu field (Energy         
Africa 10%) identified an attractive opportunity to market LNG into the         
Atlantic Basin markets in circa 2006.  Provided reserves in excess of 5 TCF     
could be proved at a reasonable confidence level, production of LNG from a      
floating facility on the Kudu field was considered a viable option.  Given      
the short timeframe for committing to gas sales agreements, an appraisal        
well, Kudu-6, to achieve the required additional reserves was drilled at a      
location some 27km north of the Kudu main field.  This proved overly            
ambitious and the well failed to intersect the Aeolian (dune) sand reservoir    
present in the main field. The floating LNG project has therefore been          
shelved for the immediate future, and an appraisal well, Kudu-7, sited to       
prove additional reserves for the South African market, is currently being      
drilled on the west flank of the Kudu main field.                               
South Africa                                                                    
Production from the Oribi field (Energy Africa 20%, operator PetroSA),          
offshore Mossel Bay, averaged 6120 bpd (2001 : 12 000 bpd), somewhat above      
the rate forecast for the period.  However the decline rate is expected to      
accelerate and it is anticipated that production will cease in 2003.  The       
Company continues to monitor opportunities in South Africa but has thus far     
failed to identify projects meeting its risk-reward criteria.                   
Uganda                                                                          
As recorded in the Interim Report, Energy Africa secured 50% interests in       
Blocks 2 and 3 in the Albertine Graben.  Some 228km of additional 2-D           
seismic was acquired in the onshore area of Block 3 in late-2001 and the        
processed data is currently being interpreted.  A well is planned for August    
2002.  Additionally a 2-D seismic survey over the areas in Lake Albert is       
being planned, with acquisition expected to commence in late 2002.              
United Kingdom                                                                  
Production in the Alba field in the central North Sea (Energy Africa 8%,        
operator Chevron Texaco) averaged 79 300 bpd (2001 : 74 800 bpd) continuing     
an exceptional period of plateau production.  Development plans for the Alba    
Extreme South area and the Caledonia field were approved by the Government      
authorities and development of both have proceeded within budget and on         
schedule for first oil production in October 2002.  In the six months to        
September 2002, production from the Alba field is expected to be well below     
previous levels, reflecting both declining deliverability and a 3-week          
platform shutdown in June when upgrades, required for the Extreme South         
development, will be done.                                                      
Future Activity                                                                 
In the year to March 2003, Energy Africa`s net production is expected to        
exceed 25 000 bpd reflecting mainly the increased production from the Ceiba     
field.  The completion of the Alba Extreme South and Caledonia fields will      
maintain production from the North Sea at previous levels.  In Gabon            
production from the Niungo and Etame fields should offset declines at           
Moukouti and Echira.                                                            
Nineteen exploration wells are scheduled of which seven are in the              
contingent category.  Eleven of these are in Equatorial Guinea, three in        
Gabon, two in Congo, two in Uganda and one in Egypt.  In addition to three      
appraisal wells already completed, it is likely that five further wells will    
be drilled by March 2003.                                                       
In line with our objective of maintaining an exploration portfolio with         
potential to add significant value, new opportunities are continuously          
reviewed and it is anticipated that two or three new ventures will be added     
in the year.                                                                    
For and on behalf of the Board                                                  
Dato` M Idris Mansor                                                            
R Gasant                                                                        
22 May 2002                                                                     
Directors:                                                                      
Dato` M Idris Mansor (Chairman) (Malaysian), R Gasant (Managing Director),      
P J G Elwes (British), Tunku Mahmood Fawzy b. Tunku Muhiyiddin (Malaysian),     
 W A Nel (Chief Operating Officer), L M Nyhonyha, G D B Paul (Malaysian),       
F M J L Poimboeuf (French), A G Windham (British)                              
Group income statements                                                         
                                                       Year          Year       
                                                      ended         ended       
31 March      31 March       
                                                       2002          2001       
                                      Notes           $`000         $`000       
Total revenues                                      144 907       141 987       
Turnover                                            143 996       138 512       
Cost of production                        2        (74 822)      (50 784)       
Gross income                                         69 174        87 728       
Exploration expenditure written off                (26 845)      (35 683)       
Administration expenses                             (7 869)      (10 572)       
Other operating (expenses)/income                      (50)         1 742       
Operating profit                                     34 410        43 215       
Interest income                                         911         3 475       
Interest expense                          3         (2 162)       (1 545)       
Profit on ordinary activities                                                   
before taxation                                      33 159        45 145       
Taxation                                  4        (12 588)      (20 030)       
Profit on ordinary activities                                                   
  after taxation and attributable                                               
  to ordinary shareholders                           20 571        25 115       
Earnings/headline earnings                                                      
per share - cents                                                             
   Basic                                               20.1          24.9       
   Diluted                                             19.9          24.7       
Weighted average number of ordinary                                             
shares in issue (`000)                                                        
    Basic                                           102 124       101 056       
    Diluted                                         103 164       101 698       
Group balance sheets                                                            
31 March      31 March       
                                                       2002          2001       
                                      Notes           $`000         $`000       
Employment of capital                                                           
Fixed assets                                        199 198       142 591       
Current assets                                                                  
   Inventories                                        5 683         4 638       
   Debtors                                           18 906        18 663       
Cash and bank deposits                            18 765        29 325       
                                                     43 354        52 626       
Current liabilities                      5         (36 163)      (24 980)       
Net current assets                                    7 191        27 646       
Total assets less current liabilities               206 389       170 237       
Long term interest bearing project loan  6         (10 000)             -       
Deferred taxation                                  (10 712)       (8 132)       
Decommissioning provision                          (19 059)      (16 648)       
166 618       145 457       
Capital employed                                                                
Share capital                                         2 642         2 630       
Share premium account                               101 525        99 823       
Other reserves                                       62 451        43 004       
Shareholders` interest                              166 618       145 457       
Net book value per share - cents                                                
   Basic                                              161.9         143.0       
Diluted                                            160.9         142.4       
Number of ordinary shares in issue at                                           
 year end (`000)                                                                
   Basic                                            102 913       101 726       
Diluted                                          103 586       102 171       
Group cash flow information                                                     
                                                       Year          Year       
                                                      ended         ended       
31 March      31 March       
                                                       2002          2001       
                                      Notes           $`000         $`000       
Reconciliation of operating profit                                              
to net cash flow from operations                                              
Operating profit                                     34 410        43 215       
Exploration expenditure written off                  26 845        35 683       
Depreciation                                         36 123        23 619       
Loss/(profit) on disposal of fixed assets                17           (3)       
Exchange loss/(gain)                                     50       (1 742)       
Net cash inflow from operations prior                                           
  to working capital adjustments                     97 445       100 772       
Working capital adjustments                         (1 909)       (7 108)       
Net cash inflow from operations                      95 536        93 664       
Cash flow statements                                                            
Net cash inflow from operations                      95 536        93 664       
Returns on investments and servicing of finance                                 
    Interest received                                   919         3 526       
    Interest paid                                   (1 287)         (848)       
Tax paid                                           (12 062)      (16 829)       
Investing activities                                                            
    Exploration expenditure                        (31 241)      (39 504)       
    Payments to acquire tangible assets            (69 305)      (71 477)       
    Proceeds from sale of fixed assets                   15             4       
Net cash outflow before financing                  (17 425)      (31 464)       
Financing                                                                       
   Issue of ordinary shares                           1 714         1 325       
   Increase in bank and other loans                  10 000           917       
Repayment of loans                               (4 591)       (5 284)       
Net cash outflow after financing                   (10 302)      (34 506)       
Cash flow from operations                                                       
  per share - cents                                                             
Basic                                              93.5          92.7       
    Diluted                                            92.6          92.1       
Group Statement of changes in equity                                            
                                       Share                                    
Share    premium      Other                         
                          Capital    account   reserves     Total               
                            $`000      $`000     $`000     $`000                
At 1 April 2000             2 618     98 510     24 404   125 532               
Profit attributable                                                             
  to ordinary                                                                   
   shareholders                 -          -     25 115    25 115               
Exchange adjustment             -          -    (6 515)   (6 515)               
Arising on issue                                                                
  of shares                    12      1 313          -     1 325               
At 31 March 2001            2 630     99 823     43 004   145 457               
Profit attributable to                                                          
ordinary shareholders         -          -     20 571    20 571               
Exchange adjustment             -          -    (1 124)   (1 124)               
Arising on issue                                                                
  of shares                    12      1 702          -     1 714               
At 31 March 2002            2 642    101 525     62 451   166 618               
Share premium account is not distributable other than as contemplated in the    
Companies Act.                                                                  
Notes to the financial statements                                               
1. Accounting policies                                                          
Basis of preparation                                                            
The financial information is expressed in United States Dollars for the         
Group and has been prepared under the historical cost convention, in            
accordance with accounting policies which conform with International            
Accounting Standards ("IAS") and South African Statements of Generally          
Accepted Accounting Practice.  These accounting policies are consistent with    
those used in the previous period, other than the changes in measurement and    
presentation currency.                                                          
Changes in Presentation Currency                                                
The Group has changed its measurement and presentation currency from South      
African Rand to United States Dollars to facilitate a better understanding      
of its results, financial position and cash flow information, since the         
majority of its revenues, costs, assets, and liabilities are transacted in      
United States Dollars which is the recognised currency of the oil               
exploration and production industry.                                            
Exploration and development expenditure                                         
The Group follows the successful efforts method of accounting for               
exploration costs.  Exploration costs are initially capitalised for each        
prospect within other oil and gas assets pending determination.  On             
determination such costs are written off unless commercial reserves have        
been established. As development commences such costs are transferred to        
fields in production and under development.                                     
2. Cost of production                                                           
2002          2001       
                                                      $`000         $`000       
Operating costs                                      35 147        24 993       
Movement in underlift                               (1 039)       (1 185)       
Royalty paid in cash                                  5 240         3 714       
Depreciation                                         35 474        23 262       
                                                     74 822        50 784       
3. Interest expense                                                             
2002          2001       
                                                      $`000         $`000       
Interest payable on loans                             1 184           864       
Finance charge - unwinding of discount                  978           681       
2 162         1 545       
The finance charge represents the unwinding during the year of the discount     
on the decommissioning provision.                                               
4. Taxation                                                                     
2002          2001       
                                                      $`000         $`000       
SA taxation                                                                     
     Normal - current                                 1 809         5 661       
- prior period                                -         (201)       
     Deferred                                             -         (223)       
Foreign taxation                                                                
     Normal - current                                 8 885        11 128       
- prior period                            (686)         (275)       
Deferred                                              2 580         3 940       
                                                     12 588        20 030       
The foreign deferred tax charge includes provision for deferred UK Petroleum    
Revenue Tax.                                                                    
5. Current liabilities                                                          
                                                       2002          2001       
                                                      $`000         $`000       
Current portion of borrowings                             -         4 591       
Corporation tax payable                               6 018         7 278       
Other taxes and social security costs                   245           167       
Other creditors                                       4 623         3 105       
Accruals                                             25 277         9 839       
                                                     36 163        24 980       
6. Borrowings                                                                   
                                                       2002          2001       
$`000         $`000       
Total interest bearing borrowings                                               
    Secured loan repayable after more                                           
     than one year                                   10 000             -       
Secured loan repayable within one year                -         4 591       
                                                     10 000         4 591       
7. Capital commitments                                                          
                                                       2002          2001       
$`000         $`000       
Contracted                                           42 861        50 063       
8. Status of financial information                                              
The above information does not constitute statutory financial statements. It    
has been extracted from the 2002 Group financial statements that have been      
approved by the directors but not yet delivered to the Registrar of             
Companies.                                                                      
Oil and gas reserves and production                                             
2002              2001       
                                         Oil equivalent    Oil equivalent       
                                                  MMboe             MMboe       
Reserves                                                                        
Commercial reserves                                                         
    Movement in Group net remaining                                             
     Proven+Probable Reserves                                                   
         At beginning of year                      47.3              36.5       
Revisions of previous estimates            7.3              12.9       
         Acquisitions of reserves in place            -               4.4       
         Discoveries, extensions and other                                      
          additions                                11.1                 -       
Production                               (7.8)             (6.5)       
                                                   57.9              47.3       
    Potentially commercial reserves                                             
    Group net remaining Proven+Probable reserves                                
At end of year                            72.3              52.1       
Summary of reserves                                                             
    Commercial reserves                                                         
         Oil                                       57.9              47.3       
Gas                                          -                 -       
    Potentially commercial reserves                                             
         Oil                                       37.3              17.1       
         Gas                                       35.0              35.0       
Production                                                                      
    Group share of production                       7.8               6.5       
    Delivered to host governments                 (0.7)             (0.9)       
    Movement in underlift                             -             (0.1)       
Group production sold                           7.1               5.5       
    Production by location of field                                             
         Africa                                     5.5               4.3       
         UK                                         2.3               2.2       
7.8               6.5       
Summary Rand convenience translation                                            
                                            Year ended         Year ended       
                                              31 March           31 March       
2002               2001       
                                             R million          R million       
Income statement                                                                
Turnover                                         1 374              1 015       
Operating profit                                   328                317       
Net profit                                         196                184       
Earnings/ headline earnings per share (cents)      192                182       
Cash flow                                                                       
Cash inflow from operations                        912                685       
Exploration expenditure                            298                289       
Development expenditure                            661                524       
Cash inflow from operations per share (cents)      893                678       
Balance Sheet                                                                   
Fixed assets                                     2 264              1 142       
Cash                                               213                235       
Loans                                              114                 37       
Net cash                                           100                198       
Net assets                                       1 894              1 165       
Net book value per share (cents)                 1 840              1 145       
R/$ exchange rate (period average)              9.5414             7.3245       
R/$ exchange rate (period end)                 11.3650             8.0101       
Date: 23/05/2002 08:00:22 AM Produced by the SENS Department                    



Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: