Fri 28 Aug 2020, 8:48 EUROPA METALS LIMITED - Phase III Metallurgical Testing and Ore Sorting Results for Toral Pb, Zn and Ag Project, Spain
Phase III Metallurgical Testing and Ore Sorting Results for Toral Pb, Zn and Ag Project, Spain

Europa Metals Ltd
(Formerly Ferrum Crescent Limited)
(Incorporated and registered in Australia
and registered as an external company in
the Republic of South Africa)
(Registration number 4459850)
(External company registration number 2011/116305/10)
Share code on the ASX: EUZ
Share code on AIM: EUZ
Share code on the JSE: EUZ
ISIN: AU0000014342
("the Company")

Phase III Metallurgical Testing and Ore Sorting Results for Toral Pb, Zn
and Ag Project, Spain

Europa Metals, the European focused lead-zinc and silver developer, is pleased to
announce in respect of its wholly owned Toral project (“Toral” or the “Toral Project”),
located in northern Spain, the results of the Phase III, independent, metallurgical test
work conducted by Wardell Armstrong International (“WAI”), and the findings of a
successful ore sorting analysis programme carried out by WAI and TOMRA GmbH
(“TOMRA”), overseen by Bara Consulting (“Bara”).
Following completion of this latest programme, Europa Metals’ team is now working with
Bara which has been tasked to complete an independent study to update the preliminary
economics for the Toral Project. Its economic study will incorporate the significant
amounts of new data obtained from the work conducted on Toral since completion of the
2018 Scoping Study.

Highlights:

   • The Phase III metallurgical test work, conducted by WAI, tested the grade and
     recoveries from three distinct sample types, namely:
           •      TOD-025H, a high-grade sample; TOD-025L, a low-grade sample; and
                  TOD-024, a weathered sample obtained from the Company’s last drilling
                  campaign.
   • Recovery and grade results are believed by Europa Metal’s Board to be
     significantly above average versus concentrates available in the current market,
     with the lead concentrate grade (combined to a cleaner plus scavenger product),
     considered by the Board, to rank amongst the highest concentrate grades globally;
   • Ore sorting analysis has demonstrated the potential for implementing an X-Ray
     Transmission (“XRT”) process at Toral based on the findings of Bara’s independent
     report with the samples being processed by WAI and TOMRA, a leading provider
     of ore sorting technology;
   • Excellent grade and recovery results from metallurgical sample TOD-025H,
     comprising:
              •   83.9% Pb recovery to a 79.2% Pb concentrate;
              •   87.7% Ag recovery to 512ppm Ag within Pb concentrate; and
           •      87.7% Zn recovery to a 60.0% Zn concentrate.
    • Ore sorting results from sample TOD-025L utilising XRT achieved:
            •   98% Pb, 94% Zn and 82% Ag recoveries;
            •   45%-50% waste rejected; and
            •   c.3-4 times increase in head grade.
    • Post ore sorting flotation results on sample TOD-025L concentrates were:
            •   89.4% and 81.5% Pb/Ag recoveries to a lead-silver concentrate grading
                53.8% Pb and 640 g/t Ag respectively; and
            •   84.7% Zn recoveries to a 52.4% Zn concentrate grade.
   • Ore sorting results for lower grade sample from TOD-024, an area previously not
     considered in the 2018 Scoping Study, utilising XRT achieved:
            •   98% Pb, 97% Zn and 92% Ag recoveries;
            •   45% - 50% waste rejection; and
            •   2 times increase in head grade.
    • Post ore sorting flotation results on sample TOD-024 concentrates:
            •   analysis indicates that this ore type may be beneficiated through sorting
                plus flotation of the sorted products; and
            •   73% Pb, 84% Zn and 81% Ag recoveries to 16.0% Pb, 18.6% Zn and
                165 g/t Ag concentrate grade were achieved
    • Phase III metallurgical results and ore sorting analysis to be utilised, alongside all
      key work conducted since the 2018 Scoping Study, to update the Toral Project’s
      estimated economics through an independent study being conducted by Bara.


Commenting today, Laurence Read, CEO of Europa Metals, said:
“Today’s Phase III metallurgical results, conducted by Wardell Armstrong International,
and ore sorting analysis from TOMRA/Bara demonstrate excellent lead, zinc and silver
recovery and grades for the Toral Project in addition to identifying certain economic
benefits that could result from the implementation of ore sorting during potential future
mining activities. While Europa Metals is extremely pleased with the results from the
TOD-025, high-grade, sample, it is of particular note that ore sorting could well bring new
areas of the deposit’s overall resource into the mineable area having previously been
discounted due to the low-grade nature of the ore.
“We are now progressing work with Bara to determine the impact of the recent
metallurgical studies, ore sorting, updated resource estimate and other work conducted
since the 2018 Scoping Study, on the prospective economics for the Toral Project.
Europa Metals looks forward to updating the market on revised economic parameters for
Toral and on the Pre-Feasibility Study workstreams underway in due course.”

Myles Campion, Executive Chairman of Europa Metals, further commented:
“This latest set of metallurgical results indicate the potential to exploit further the resource
at Toral. In addition, by investigating the use of XRT in our process route, we expect
increased optionality in terms of mining rates and throughput flexibility. Combining the
ore sorting results with the very impressive lead concentrate grades achieved from the
TOD-025 sample, we firmly believe that Europa Metals is continuing to demonstrate that
Toral can provide a high-grade concentrate, whilst allowing for a flexible mining
approach.
”Today’s results will now be combined with our previous metallurgical test work to inform
an updated set of economic parameters and provide a roadmap into our next phase of
work.”


Objectives of the Phase III metallurgical test work and ore sorting analysis
WAI conducted tests on metallurgical samples, representing the expected ore types from
Toral, to develop a flowsheet for the potential economical feasible beneficiation of Toral
ores to produce marketable concentrates, as well as establishing basic processing data
for input into engineering studies. Such work builds on the positive results from WAI’s
two previous metallurgical programmes, with the design based on its previous
recommendations. Work has also been undertaken with Bara regarding an analysis of
the potential for ore sorting at the Toral Project, in order to refine a potential future
production process for the discrete treatment of different areas of the resource with
increased metal recovery.
Three samples were submitted to WAI for testing, representing different ore types likely
to be encountered within Toral during potential future production, with all of the ore
sorting samples firstly subjected to an ore sorting process followed by flotation testing.
The representative samples were as follows:
    1. High-grade intersection from drill hole TOD-025 (TOD-025H), which was
       subjected to flotation tests.

    2. Low-grade fresh sample from drill hole TOD-025 (TOD-025L) for determining the
       use of XRT ore sorting technology.

    3. Weathered, low-grade, sample from drill hole TOD-024, also subjected to XRT
       analysis.

Summary of ore sorting
Ore sorting has been identified as having the potential to unlock value in the shallower,
lower grade zones previously not considered to be economically mineable in the 2018
Scoping Study. Testing was therefore undertaken to investigate the potential of pre-
concentrate material from the Toral deposit by means of sensor-based sorting. If
successful, pre-concentration of the ore could provide a number of potential benefits for
the project including:

•   Reducing the size of the requisite process plant (crushing, grinding and dewatering
    circuits) whilst maintaining the same overall throughput;

•   Enabling ore that may otherwise be sub-economic based on grade to be processed;
    and

•   Allowing higher mining rates without necessarily having to increase the size of the
    processing plant.

Overall, the sorting results for both the TOD-024 and TOD-025L samples are considered
to be excellent, with between 45% - 50% of the mass rejected at, for the TOD-024
sample, 98% Pb recovery, 97% Zn recovery and 92% Ag recovery, and at, for the TOD-
025L sample, 98% Pb recovery, 94% Zn recovery and 82% Ag recovery.
  The increasing head assay is also pleasing with the TOD-024 sample increasing from
  1.04% Pb and 1.01% Zn in the feed to 2.34% Pb and 2.15% Zn and an approximate
  doubling of the grade in the sorter product. In the TOD-025L sample the increase in
  grade was more pronounced with uplifts in the Pb grade from 1.13% Pb to 4.03% and
  Zn grade from 0.62% Zn in the feed to 2.06% Zn in the sorter product.

  Ore sorting process
  Ore sorting by means of XRT is an established process for sorting Pb/Zn ores by way of
  rejecting waste dilution from ores at low cost prior to more conventional processing by
  flotation. Sensor-based sorting was selected for this investigation as it offers a number
  of benefits over alternative pre-concentration methods, such as Dense Media Separation
  (DMS), including the ability to change the sorting criteria depending on the feed material
  and target specific metals/minerals of interest along with the added flexibility of not
  having to be continuously operated.

  Toral ore sorting analysis
  Based on the minerals of interest in the feed (galena/sphalerite) and the predominant
  host mineralisation (calcite/dolomite), sorting by means of XRT sensing was selected for
  investigation as part of the study as it allows detection of the minerals of interest both on
  the surface and within the particle being sorted.

  Two low grade samples were taken and submitted for analysis to WAI for sorting test
  work alongside TOMRA, a leading provider of ore sorting technology based in Germany
  and overseen by Bara. The objective of the work was to identify the potential economic
  benefits of processing low-grade and weathered material through beneficiation circuits
  during the future mine life of Toral alongside the central, high-grade core of the project.
  The samples analysed were TOD-025L and TOD-024.
  The results, presented in Table 1 below, show lead and zinc stage recoveries in excess
  of 94.5% for the TOD-024 sample and in excess of 89.2% for the TOD-025L sample.

  Overall, taking into account the metal contained within the -10.0mm “fines” fraction, the
  data shows that in excess of 94% of the overall lead and zinc in the feed could be
  recovered through the ore sorting process whilst rejecting a minimum of 40% of the
  original mass.
  Table 1: Summary of ore sorting results from the TOD-024 and TOD-025L samples:
                               TOD-024 (Sort plus Float) Sorter Test Results
  Size                                                                Sorter Recovery        Overall
                                       Mass             Assay
Fraction        Product                                                      (%)          Recovery (%)
 (mm)                             (kg)      (%)    Pb (%) Zn (%)         Pb        Zn      Pb       Zn
             Stage 1 Product      5.21     22.76    2.34      2.15     96.43     94.52   51.08    48.23
-25.0+10.0   Stage 2 Product      2.16      9.41    0.08      0.07      1.40      1.33    0.74     0.68
             Stage 2 Waste        9.06     39.54    0.03      0.05      2.17      4.15    1.15     2.12
  -10.0           Fines           6.48     28.29    1.73      1.75        -         -    47.03    48.98
  Feed              -            22.90    100.00    1.04      1.01        -         -    100.00 100.00
                               TOD-025 (Sort plus Float) Sorter Test Results
  Size                                                                Sorter Recovery        Overall
                                       Mass             Assay
Fraction        Product                                                      (%)          Recovery (%)
 (mm)                             (kg)      (%)    Pb (%) Zn (%)         Pb        Zn      Pb       Zn
             Stage 1 Product      3.91     14.24    4.03      2.06     96.08     89.22   50.81    46.97
-25.0+10.0   Stage 2 Product      2.73      9.96    0.13      0.18      2.24      5.52    1.19     2.90
             Stage 2 Waste        8.59     31.31    0.03      0.06      1.68      5.27    0.89     2.77
-10.0         Fines          12.20    44.49     1.20      0.66       -        -      47.11          47.36
Feed            -            27.42    100.00    1.13      0.62       -        -      100.00        100.00



TOD-025L sample
Products from ore sorting test work on the TOD-025L sample were subjected to open
circuit flotation testing comprising rougher and cleaner flotation tests resulting in an c.3-
4 times uplift in the head assay. Test conditions were optimised in terms of residence
time and reagent dosages. Results of the testing are summarised in Table 2 below.

Results for the benchmark cleaner flotation test (FCT1) conducted using optimal
residence and reagent dosing conditions for lead, demonstrated lead and silver
recoveries of 89.4% and 81.5% to a lead-silver concentrate grading 53.8% Pb and 640
g/t Ag respectively. Results of the zinc cleaner flotation test (Cl 2) demonstrated zinc
recoveries of 84.7% to a concentrate grading 52.4% Zn.
Table 2: Sample TOD-025L sorting and flotation results
                           TOD-025 (Sort plusFloat) Flotation Test Results
                                                   Assay                      Recovery (%)
                               Mass
   Test    Conc       Stage                                     Ag
                                (%)      Pb (%)    Zn (%)                 Pb       Zn         Ag
                                                              (ppm)
            Pb         Ro        3.2     50.98       1.86      616      90.25     5.41       78.36
   FT1
            Zn         Ro        5.3      2.97      19.11      93.8      8.75    92.46       19.86
                       Ro        2.9     53.80       2.17      640      89.43     5.93       81.54
            Pb
                       Cl 1      0.7     60.46       3.02     1,975     23.08     1.90       57.80
  FCT1
                       Ro        4.8      3.40      20.12      77.3      9.41    91.60       16.41
            Zn
                       Cl 1      2.0      7.19      47.38      153       8.28    89.71       13.58
                       Ro        3.1     46.54       2.00      647      88.03     5.96       80.58
                       Cl 1      1.7     71.34       1.62     1,078     71.66     2.56       71.30
            Pb
                       Cl 2      1.1     71.10       1.48     1,207     47.91     1.51       51.39
                       Cl 3      0.2     54.97       3.14     2,727      8.26     0.74       26.98
  FCT2
                       Ro       14.8      3.71      20.05      91.8     10.74    91.49       17.47
                       Cl 1      2.1      7.61      44.41      176       9.80    90.24       14.98
            Zn
                       Cl 2      1.7      7.75      52.36      165       7.94    84.68       11.13
                       Cl 3      1.3      6.94      55.49      134       5.57    70.32        7.08

TOD-024 sample
Overall, recoveries of 73% Pb, 84% Zn and 81% Ag to a combined concentrate grading
16.0% Pb, 18.6% Zn and 165 g/t Ag were demonstrated. The complex mineralogy and
complex mineral associations observed, presently suggests that an optimal route for this
ore type would target a bulk polymetallic concentrate marketable either to ISF smelters
in the region or alternatively to operators of either PoX or Albion process circuits.

The TOD-024 low-grade weathered sample was subjected to a total of three rougher
flotation tests to investigate flotation performance. While this shallower, weathered ore
type was not considered in the 2018 Scoping Study, the sorting test work undertaken
suggests that this ore type may indeed be amenable to beneficiation by sorting plus
flotation of the sorted products. Results for the flotation of the sorted products from the
TOD-024 sample are presented in Table 3.

Further work on this option is required, including metallurgical optimisation for recovery
of non-sulphide zinc species, lead-zinc separation, as well as work on treatment charges
and payabilities obtainable for a potential bulk polymetallic concentrate.
Table 3: Sample TOD-024 sorting and flotation results
                          TOD-024 (Sort+Float) Flotation Test Results
                                           Assay                        Recovery (%)
                       Mass
   Test     Conc                                         Ag
                        (%)     Pb (%)     Zn (%)                   Pb      Zn                Ag
                                                       (ppm)
              Pb        5.2     23.72      27.62         246      59.92    69.29             66.96
   FT1
              Zn        4.2      6.43       7.32        64.83     13.33    15.06             14.45
              Pb        4.5     24.69      26.64         242      58.09    61.08             63.37
   FT2
              Zn        4.5      5.25       9.58        56.01     12.59    22.40             14.94
              Pb        4.3     28.43      25.39         290      57.84    52.21             65.57
   FT3
              Zn        5.2      5.25      13.08        53.16     12.79    32.20             14.39



TOD-025H sample
Following a single stage of cleaning, the final recovery of lead to a combined
cleaner+scavenger product was 83.9% at a grade of 79.2% Pb whilst zinc recovery was
87.7% to a grade of 60.0% Zn. These results represented a significant improvement in
both the grade and recovery of both metals when compared with previous testing.

In overview, whilst test data in terms of concentrate grade and recovery to concentrate
can be attributed in part to high feed grades in the test sample, the test still demonstrates
the potential for excellent recovery of lead, silver and zinc to a concentrate assaying lead
and zinc values significantly above those typically found in the market for these ore types.

The high-grade fresh TOD-025H sample was subjected to a programme comprising
open circuit rougher and cleaner flotation tests, the results of which are set out in Table
4:

Table 4: Results from sample TOD-025H
                            TOD-025 (Sort+Float) Flotation Test Results
                                                  Assay                       Recovery (%)
                              Mass
  Test     Conc     Stage                                      Ag
                               (%)     Pb (%)     Zn (%)                  Pb       Zn         Ag
                                                             (ppm)
            Pb       Ro         3.2     50.98       1.86      616       90.25     5.41       78.36
  FT1
            Zn       Ro         5.3      2.97      19.11      93.8       8.75    92.46       19.86
                     Ro         2.9     53.80       2.17      640       89.43     5.93       81.54
            Pb
                     Cl 1       0.7     60.46       3.02     1,975      23.08     1.90       57.80
  FCT1
                     Ro         4.8      3.40      20.12      77.3       9.41    91.60       16.41
            Zn
                     Cl 1       2.0      7.19      47.38      153        8.28    89.71       13.58
                     Ro         3.1     46.54       2.00      647       88.03     5.96       80.58
                     Cl 1       1.7     71.34       1.62     1,078      71.66     2.56       71.30
            Pb
                     Cl 2       1.1     71.10       1.48     1,207      47.91     1.51       51.39
                     Cl 3       0.2     54.97       3.14     2,727       8.26     0.74       26.98
  FCT2
                     Ro        14.8      3.71      20.05      91.8      10.74    91.49       17.47
                     Cl 1       2.1      7.61      44.41      176        9.80    90.24       14.98
            Zn
                     Cl 2       1.7      7.75      52.36      165        7.94    84.68       11.13
                     Cl 3       1.3      6.94      55.49      134        5.57    70.32        7.08

The flowsheet tested considers crushing, followed by sorting of low-grade ores using
XRT, grinding of ores to between 106µm and 150µm, and flotation in 2 rougher and 3
cleaner stages in closed circuit to separate lead-silver and zinc concentrates. A
schematic of the basic flowsheet is shown in Figure 1, which can be viewed via the link
below:
Figure 1: Basic Toral Flowsheet showing comminution, ore sorting, flotation, concentrate
handling and dry stack tailings and is available for viewing of the following link:
http://www.rns-pdf.londonstockexchange.com/rns/3867X_1-2020-8-27.pdf


Further work
Further to the highly encouraging results from the latest metallurgical testwork and ore
sorting, Bara, having been commissioned by Europa Metals, has now commenced its
work in respect of updating the economic parameters for the Toral Project, via an
independent study. The Company is also progressing certain Pre-Feasibility Study
workstreams and looks forward to providing further updates in due course.


For further information on the Company, please visit www.europametals.com or contact:
Europa Metals Ltd
Dan Smith, Non-Executive Director and Company Secretary (Australia)
T: +61 417 978 955
Laurence Read, CEO (UK)
T: +44 (0)20 3289 9923

Strand Hanson Limited (Nominated Adviser)
Rory Murphy/Matthew Chandler
T: +44 (0)20 7409 3494

Turner Pope Investments (TPI) Limited (Broker)
Andy Thacker
T: +44 (0)20 3657 0050

Sasfin Capital Proprietary Limited (a member of the Sasfin group)
Sharon Owens
T (direct): +27 11 809 7762

The information contained within this announcement is deemed by the Company to constitute inside
information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

United Kingdom
28 August 2020

Notes

Appendix: Further information on the Toral project

The latest Mineral Resource Estimate (August 2020) for the Toral deposit reported in accordance
with JORC (2012) at a 4% cut-off was as follows:

    •   An Indicated resource of approximately 3.8Mt @ 8.3% Zn Equivalent (including Pb
        credits), 4.7% Zn, 3.9% Pb and 30g/t Ag, including:
                -   180,000 tonnes of zinc, 150,000 tonnes of lead and 3.7 million ounces of
                    silver.
    •   An Inferred resource of approximately 14Mt @ 6.5% Zn Equivalent (including Pb credits),
        4% Zn, 2.7% Pb and 23 g/t Ag, including:
               -    540,000 tonnes of zinc, 360,000 tonnes of lead and 10 million ounces of silver.
     •    A total resource of approximately 17Mt @ 6.9% Zn Equivalent (including Pb credits), 4.1%
          Zn, 2.9% Pb and 24 g/t Ag, including:
               -    720,000 tonnes of zinc, 510,000 tonnes of lead and 14 million ounces of silver.

Table 1: Summary of Indicated and Inferred mineral resources for the Toral property reported at
a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and
tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimate
and, as such, totals may not cast.


                                                                                       Contained       Contained
  Cut-Off                                                                                                               Ag Troy
                Tonnes                    Zn_Eq        Zn Eq        Zn    Pb     Ag        Zn              Pb
   Zn Eq                      Density                                                                                     Oz
               (Millions)                 (Pb)%      (PbAg)%        %     %      g/t    Tonnes          Tonnes
 (PbAg)%                                                                                                               (Millions)
                                                                                         (000s)          (000s)
                                                            Indicated
      6            2.8          2.9         9.5          10         5.3   4.5    34        150             130                3.1
      5            3.3          2.9         8.9          9.5         5    4.2    32        170             140                3.4
      4            3.8          2.9         8.3          8.9        4.7   3.9    30        180             150                3.7
      3            4.1          2.9         7.9          8.5        4.4   3.7    29        180             150                3.8
                                                               Inferred
      6             8           2.9         7.8          8.3        4.7   3.4    28        370             270                7.2
      5            10           2.9         7.2          7.7        4.4    3     26        450             310                8.6
      4            14           2.9         6.5          6.9         4    2.7    23        540             360                10
      3            17           2.9         5.9          6.3        3.7   2.4    20        610             400                11
                                                                Total
      6            11           2.9         8.2          8.8        4.8   3.7    30        520             390                10
      5            14           2.9         7.6          8.1        4.5   3.3    27        620             450                12
      4            17           2.9         6.9          7.3        4.1   2.9    24        720             510                14
      3            21           2.9         6.3          6.7        3.8   2.7    22        790             560                15
                                                  Transitional Oxide Material
      4             3           2.9         5.2          5.7        2.6   2.9    27         75              83                2.5
                                                  Unweathered Fresh Rock
      4            14           2.9         7.2          7.7        4.5    3     24        650             430                11

 *Zn Eq % is the calculated Zn equivalent incorporating lead credits; (Zn Eq (Pb)% = Zn + Pb*0.926). Zn Eq (PbAg)% is
the calculated Zn equivalent incorporating silver credits as well as lead; (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019).
Zn equivalent calculations were based on 3-year trailing average price statistics obtained from the London Metal Exchange
and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of
US$16.2/oz.

Notes for Table 1 in this appendix:
1.    No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have
      demonstrated economic viability.
2.    Numbers are rounded to reflect the fact that an Estimate of Resources is being reported as stipulated by JORC
      2012. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.
3.    Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal
      Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t
      and Ag price of US$16.2/Oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It
      is the Company’s opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver)
      have a reasonable potential to be recovered and sold.
4.    Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used
      to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019).
5.    Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.926).
6.    The Mineral Resource Estimate set out above for the zinc, lead and silver mineralisation in the Toral project area is
      based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the
      Toral project up to 21 January 2020. The block model used uniform cell size of 25x10x25m to best suit the orientation
     of the mineralisation and sample spacing. The block model was rotated by 20 degrees in plan view to best match
     the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate
     volume as much as possible. Cells were interpolated at the parent block scale using an Ordinary Kriging.
7.   Following statistical analysis and assessment of the updated assay composite database top cuts of 125g/t Ag were
     applied to the data. No top cuts were applied for Zn or Pb.
8.   The Indicated and Inferred mineral resource category for the Toral zinc-lead-silver project set out in Table 1 (at cut-
     off grades >4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for
     Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared
     by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute
     of Geoscientists and Minerals Council of Australia (JORC).
9.   The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4%
     and as such should not be considered mineral resources, they are shown here for comparison purposes only.

Date: 28-08-2020 08:48:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData


Follow us on: