Thu 20 May 2004, 17:14 Agreement Concluded to Treat Ruashi high grade co
Metorex - Agreement Concluded to Treat Ruashi high grade copper/cobalt mineral  
  resources                                                                       
  METOREX LIMITED                                                                 
  (Incorporated in the Republic of South Africa)                                  
  (Registration number 1934/005478/06)                                            
  Share code: MTX                                                                 
  ISIN : ZAE000022745                                                             
  (`Metorex`)                                                                     
  AGREEMENT CONCLUDED TO TREAT RUASHI High Grade Copper/Cobalt Mineral Resources  
  and the Etoile Stockpiles in the Democratic Republic of Congo (DRC).            
  INTRODUCTION                                                                    
  In line with its strategic objective to develop larger longer life high quality 
  orebodies, Metorex is pleased to announce that it has reached agreement with the
  Government of the DRC, La Generale des Carrieres et des Mines (`Gecamines`) and 
  Sentinelle Global Investments (Proprietary) Limited (`Sentinelle`) to mine and  
  treat the high grade copper/cobalt Ruashi orebody and the Ruashi and Etoile     
  stockpiles situated in the Katanga Province of the DRC approximately 10         
  kilometres from Lubumbashi.                                                     
  This agreement constitutes one of the first grants by the Government and        
  Gecamines to investors under the new mining code promulgated in July 2002.      
  PROJECT OVERVIEW                                                                
  Ruashi Mining SPRL (`RM`), a DRC registered company, is the operator and owner  
  of the mining rights which ownership has been ratified by both the DRC          
  Government and Gecamines.                                                       
  The project is to be developed in two phases, the first being the construction  
  of a concentrator to treat the oxide stockpiles at both Ruashi and Etoile for   
  approximately 4 years (Phase I). The second phase is the mining of the Ruashi   
  opencast orebody (Phase II). These are high-grade copper/cobalt resources with a
  life in excess of 30 years.                                                     
  Phase I comprising the mining of the stockpiles will take place at an average   
  rate of 70 000 tons per month yielding 7 000 to 10 000 tons of copper and 1 100 
  - 1 300 tons of cobalt per annum in concentrate. Mining of the main Ruashi open 
  pit orebodies during Phase II is envisaged at a rate of approximately 120 000   
  tons per month to give +/-40 000 tons of copper and +/-3 000 tons of cobalt per 
  annum. Phases I and II provide a life of mine of over 30 years.                 
  Regarding the results of the feasibility on Phase I and preliminary study on    
  Phase II, Metorex and their consultants, GRD Minproc, confirm the robust nature 
  of the project which at a copper price of $2 200 per ton and cobalt price of $12
  per pound provide internal rates of return in excess of 50% at copper cash      
  costs, net of cobalt credits, below US$0.25c/lb. During Phase I, a bankable     
  feasibility study will be prepared for Phase II.                                
  MINERAL RESOURCES                                                               
  The mineral resources are summarised below:                                     
  Phase I - Stockpiles                                                            
                         Tons       % Cu  % Co                                    
  Ruashi and Etoile      3 200 000  1.76  0.49                                    
  Stockpiles                                                                      
  These reserves constitute probable reserves and inferred resources.             
  Phase II - Ruashi Orebodies                                                     
                         Tons        % Cu    % Co                                 
  Ruashi                 31 900 000  3.59%   0.39%                                
  These reserves constitute proved and probable reserves.                         
  Diamond drilling in excess of 100 000 metres has been carried out on the        
  orebodies.                                                                      
  Potential exists to exploit the sulphide orebody below the oxides and an        
  evaluation will be undertaken on the sulphides during Phase I and Phase II.     
  METALLURGICAL PLANT                                                             
  A flotation plant will be constructed to treat the stockpiles during Phase I,   
  producing oxide concentrates. The concentrator sourced from O`Okiep will be re- 
  erected at Ruashi thereby reducing the capital cost of Phase I. This plant has  
  been redesigned by GRD Minproc to handle Ruashi ore and has a capacity of 70 000
  tons per month. The plant and associated infrastructure are expected to cost    
  approximately $15million - $18million to establish.                             
  Phase II involves the construction of an expanded concentrator, an acid leaching
  section and SX/EW plant for the production of copper and cobalt metal on site.  
  This metallurgical complex is estimated to require $150m - $180m of capital     
  expenditure contingent on the scale of operation and ensures higher recoveries  
  than those obtained during Phase I.                                             
  PROJECT FINANCING                                                               
  Discussions for the financing of both the Phase I and Phase II capital          
  expenditure have been initiated with interest having been expressed from an     
  International hedge fund, project financiers and a leading emerging market      
  private equity fund. The development of the project is contingent on securing of
  finance and suitable marketing arrangements for the Phase I oxide concentrate.  
  Discussions to date suggest that a debt : equity ratio of 60 : 40 with limited  
  dilution to Metorex, is obtainable and further details will be released on      
  completion of these arrangements.                                               
  RISK ANALYSIS                                                                   
  A country and project risk analysis has been carried out in line with Metorex`s 
  investment evaluation procedures. The country risk will be addressed by         
  political risk insurance and the project risk will be addressed by a phased     
  investment process and the use of well-established copper and cobalt            
  metallurgical processes. The mining and infrastructure risks are considered     
  normal for this type of project. To manage the market risk, long term           
  arrangements are being negotiated with international commodity traders.         
  PROJECT TIMING                                                                  
  Subsequent to the funding and marketing arrangements, work will commence on the 
  erection of the plant and mobilisation of the mining contractor. Production is  
  anticipated to commence within 12 months from site establishment.               
  The bankable feasibility study on Phase II runs concurrently with Phase I with  
  the intention of bringing Phase II into production as soon as practical. This   
  investment is expected to make a meaningful contribution to the Metorex Group`s 
  earnings.                                                                       
  BY ORDER OF THE BOARD                                                           
  METOREX LIMITED                                                                 
  Johannesburg                                                                    
  20 May 2004                                                                     
  Sponsor:                                                                        
  Barnard Jacobs Mellet Corporate Finance                                         
  (Pty) Limited                                                                   
  Date: 20/05/2004 04:01:08 PM Produced by the JSE SENS Department                
                                                                                  
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: