Wed 27 Oct 2004, 8:32 Report on Activities for the First Quarter
DRDGOLD - Report on Activities for the First Quarter ended 30 September 2004 of 
          the 2005 Financial Year                                               
DURBAN ROODEPOORT DEEP, LIMITED                                                 
(DRDGOLD)                                                                       
(Incorporated in the Republic of South Africa)                                  
(Registration No.1895/000926/06)                                                
ARBN 086 277616                                                                 
JSE trading symbol: DUR                                                         
ISIN Code: ZAE000015079                                                         
Issuer code: DUSM                                                               
NASDAQ trading symbol: DROOY                                                    
ASX trading symbol: DRD                                                         
REPORT ON ACTIVITIES FOR THE FIRST QUARTER ENDED 3O SEPTEMBER 2004 OF THE 2005  
FINANCIAL YEAR                                                                  
GROUP RESULTS                                                                   
(Unaudited)                                                                     
CHANGE TO FINANCIAL REPORTING FOR 2004/2005                                     
In line with practice in Australia and the United States, DRDGOLD will          
henceforth report as follows:                                                   
Quarters 1 and 3: production statistics, operational performance and exploration
results;                                                                        
Quarters 2 and 4: as above, with either interim of final financial results, in  
US GAAP, which is DRDGOLD`s primary reporting convention, and SA GAAP, in       
accordance with the listing requirements of the JSE Securities Exchange South   
Africa.                                                                         
KEY FEATURES                                                                    
Continued strong performance from offshore operations                           
Further good exploration results at Tolukuma                                    
Emperor stake increased to 45.33%                                               
ERPM back to break-even                                                         
Blyvoor 60-day review completed                                                 
South African operations restructured                                           
KEY RESULTS SUMMARY                                                             
GROUP                                  Quarter         Quarter       Quarter    
                                      Sep 2004        Jun 2004      Sep 2003    
Gold production (attributable)  oz     220 524         228 465       198 493    
                                kg       6 859           7 106         6 174    
Gold price received         US$/oz         403             395           362    
                              R/kg      82 785          85 804        86 625    
Capital expenditure          US$ m         6.0             4.5           4.7    
                             ZAR m        38.9            30.1          35.0    
STOCK                                                                           
ISSUED CAPITAL                                                                  
248 389 465 ordinary no par value shares                                        
5 000 000 cumulative preference shares                                          
Total ordinary no par value shares issued and committed: 274 267 728            
STOCK TRADED                               JSE     ASX    NASDAQ   FRANKFURT    
Avg. volume for the quarter per day (000)  200      32     2 851          95    
% of issued stock traded (annualised)      21%      3%      300%         10%    
Price - High                            R15.80  A$3.72   US$2.64   Euro 2.13    
      - Low                             R10.30  A$2.30   US$1.63   Euro 1.27    
- Close                           R12.25  A$2.60   US$2.01   Euro 1.62    
PRODUCTION                                                                      
Gold production for the quarter was slightly down on the previous quarter,      
mainly as a result of lower production out of South Africa, specifically        
Blyvooruitzicht (Blyvoor), which went though a 60-day review, resulting in a    
slowdown in production. The percentage of the Group`s production from offshore  
has increased from 31% to 35% due in part to the inclusion of our 45.33%        
attributable share in production from Emperor from August 2004.                 
COSTS                                                                           
Unit costs were slightly up as a direct result of the lower ounces produced in  
South Africa, but with the restructuring complete, it is anticipated that the   
second quarter`s costs will come back in line with those recorded in the June   
quarter.                                                                        
SAFETY                                                                          
During the period under review, the Company recorded no fatalities at its       
operations. Blyvoor Nos. 5 and 6 shafts achieved one million fatality free      
shifts on 30 August and 3 September, 2004 respectively. North West Operations   
achieved 500 000 fatality free shifts on 2 September, 2004. Regrettably, after  
the quarter-end, Blyvoor recorded a fatality.                                   
North West Operations` lost time injury rate continues to show an improvement,  
partly attributable to the implementation of a new safety awareness             
communication strategy using a green, yellow and red safety card system.        
Blyvooruitzicht is leading the Association of West Rand Mines Inter-Mine Safety 
Competition with a lost time injury frequency rate of 6,52.  This compares      
favourably with the second-placed mine, belonging to another group, at 9,36.    
At its Tolukuma operation, the Company continues to show very high safety       
standards. The mine has achieved 90 lost time injury free days, after the       
previous best of 361 injury free days was broken shortly before the financial   
year end.                                                                       
GOLD MARKET REVIEW                                                              
The average gold price received for the quarter was US$403 per ounce (R82 785   
per kilogram) compared to US$395 per ounce (R85 804 per kilogram) the previous  
quarter. This compares to the average London PM fix for the same period of      
US$401.30 per ounce (R82 286 per kilogram).                                     
The performance of the gold price in rand terms during the quarter, however,    
featured two distinct halves due to movements in the exchange rate. The first   
six weeks saw the lowest rand gold price since 2000 at an average of R78 534 per
kilogram. Following the interest rate cut of 50 basis points on 12 August 2004, 
the Rand/US$ exchange rate moved from around R6.22/US$1 to R6.75/US$1, resulting
in the gold price for the second half of the quarter averaging R85 697 per      
kilogram.                                                                       
CORPORATE DEVELOPMENTS                                                          
The Company`s takeover bid for the ASX-listed Fijian gold miner, Emperor Mines  
Limited (`Emperor`), closed on 30 July 2004, resulting in DRDGOLD holding 45.33%
of Emperor. DRDGOLD`s Executive Chairman, Mark Wellesley-Wood, has since been   
appointed Managing Director of Emperor on an interim basis, and DRDGOLD`s       
Divisional Director - Australasia, Richard Johnson, has been appointed to the   
Emperor board. DRDGOLD now has three nominees on the six-member Emperor board,  
David Baker being the other non-executive director nominated by DRDGOLD.        
Emperor is in the process of completing a rights issue to raise approximately   
A$20.4 million (US$14.6 million) to fund a portion of Emperor`s Phase Two       
capital expansion project at its Vatukoula mine in Fiji, as well as to fund its 
short-term working capital requirements. DRDGOLD has agreed to participate in   
the rights issue and to subscribe for any shortfall under a shortfall facility  
offered by Emperor in connection with that rights issue (subject to limited     
termination rights).                                                            
In response to an application by three shareholders of Emperor, the Australian  
Takeovers Panel has made a declaration of unacceptable circumstances in relation
to the Emperor rights issue, and DRDGOLD`s participation in the rights issue,   
and has made various orders (including an order that DRDGOLD sells down any     
shares acquired through the shortfall facility). DRDGOLD has applied for a      
review of that decision.                                                        
In other developments:                                                          
DRDGOLD listed on the Port Moresby Stock Exchange on 18 August 2004, reflecting 
the Company`s growth as one of Papua New Guinea`s major gold producers;         
as announced on 29 September 2004, the Company intends to seek shareholders`    
approval to change its name to DRDGOLD Limited at the forthcoming AGM on 26     
November 2004; and                                                              
on 30 September 2004, shareholders approved the increase in the Company`s       
authorized share capital from 300 million shares to 600 million shares to       
facilitate its acquisition and growth strategies.                               
DRDGOLD wins R35.7 million (plus cost and interest) case against JCI Gold/CAM.  
AUSTRALASIAN OPERATIONS                Quarter         Quarter       Quarter    
                                      Sep 2004        Jun 2004      Sep 2003    
Gold production (attributable)  oz      77 387          70 990        21 283    
                                kg       2 407           2 208           662    
Capital expenditure          US$ m         3.8             1.7           0.6    
                             ZAR m        24.2            11.7           4.7    
The increase in gold production was due mainly to the inclusion of DRDGOLD`s    
45.33% share of Emperor`s production from August 2004.                          
Porgera                         Quarter     Quarter     % Change     Quarter    
                               Sep 2004    Jun 2004                 Sep 2003    
Ore milled           t000`s         288         327         (12)           -    
Yield                g/t           5.20        4.74          10            -    
Gold produced        kg           1 498       1 550          (3)           -    
                     oz          48 162      49 834          (3)           -    
Although ore milled at Porgera was slightly lower than the previous quarter,    
improved grades assisted with continued good gold production performance.       
Tolukuma                        Quarter     Quarter     % Change     Quarter    
                               Sep 2004    Jun 2004                 Sep 2003    
Ore milled           t000`s          52          52            -          44    
Yield                g/t          11.65       12.65          (8)       15.05    
Gold produced        kg             606         658          (8)         662    
                     oz          19 484      21 156          (8)      21 283    
Average labour strength             813         751          (8)         472    
Tolukuma`s 18-month run of exceeding 7 000 plus ounces of production per month  
was broken in August when the mine fell slightly short of its target. Production
in the September quarter was hampered by lower grades being mined from the      
Gulbadi vein.                                                                   
A feasibility study is nearing completion for a proposed extension of the Zine  
open pit to the south of the first pit that was completed earlier this year.    
This study is based on infill drilling that has been carried out this year.     
Emperor(45.33% attributable)*   Quarter     Quarter     % Change     Quarter    
                               Sep 2004    Jun 2004                 Sep 2003    
Ore milled           t`000           38           -            -           -    
Yield                g/t           7.97           -            -           -    
Gold produced        kg             303           -            -           -    
                     oz           9 741           -            -           -    
* Emperor accounted for on an equity basis from 1 August 2004.                  
Emperor reported in its quarterly report, released on 11 October 2004, that     
`gold won for the September quarter decreased by 20% to 27 632 ounces compared  
with the June quarter (34 539 ounces). Gold shipped, however, increased by 3% to
35 169 ounces (34 259 ounces). Tonnage treated for the quarter decreased by 13% 
to 139 164 tonnes (160 002 tonnes) while delivered grade decreased by 9% to 7.15
grams per tonne (7.86 grams per tonne). Gold in Circuit (GIC) has been reduced  
to `near normal` levels. Preliminary test work on alternatives to maintain      
`normal` levels of GIC in the future, should high sulphur grades in mill feed   
occur again, has been completed. A number of options have been rejected         
following the preliminary tests. Further tests on samples produced by the       
gravity concentration option are required before committing capital funds.` The 
full details of Emperor`s quarterly results are available on its website,       
www.emperor.com.au.                                                             
SOUTH AFRICAN OPERATIONS               Quarter         Quarter       Quarter    
                                      Sep 2004        Jun 2004      Sep 2003    
Gold production (attributable)  oz     143 137         157 475       177 210    
                                kg       4 452           4 898         5 512    
Capital expenditure          US$ m         2.2             2.8           4.1    
                             ZAR m        14.7            18.4          30.3    
Blyvooruitzicht                 Quarter     Quarter     % Change     Quarter    
                               Sep 2004    Jun 2004                 Sep 2003    
Area mined m2        000             48          53           (9)         51    
Development          m              720         288          150         973    
Face length          m            1 755       1 990          (12)      2 017    
Stoping width        cm             109         109            -         110    
Ore milled                                                                      
   Underground       t`000          180         207          (13)        222    
Surface           t`000          577         719          (20)        388    
   Total             t`000          757         926          (18)        610    
Yield                                                                           
   Underground       g/t           6.74        6.59            2        7.26    
Surface           g/t           0.21        0.31          (32)       0.74    
   Total             g/t           1.76        1.72            2        3.11    
Gold produced                                                                   
   Underground       kg           1 214       1 365          (11)      1 611    
oz          39 031      43 886          (11)     51 796    
   Surface           kg             120         224          (46)        287    
                     oz           3 858       7 201          (46)      9 227    
   Total             kg           1 334       1 589          (16)      1 898    
oz          42 889      51 087          (16)     61 023    
Capital expenditure  US$ m          0.2         1.2           83         2.4    
                     ZAR m          1.5         7.2           79        18.1    
Average labour strength           3 289       5 298           38       5 716    
Following the retrenchment of 1 619 employees at a cost of R24 million          
(excluding leave pay) in September 2004, a six-month plan has been put in place 
aimed at returning Blyvoor to break even. The basis of this plan is to reduce   
mining of areas serviced by expensive infrastructure and to focus on areas where
improved efficiencies will result. It is pleasing to note the increase in grade 
from underground from 6.59 grams per tonne to 6.74 grams per tonne.             
Volumes of mining have been reduced at No. 4 shaft and No. 6 shaft, leaving No. 
5 shaft as Blyvoor`s main production unit.  Broken ore sampling has been        
introduced in order to reduce dilution and improve mining discipline.           
The retrenchment of the employees at Blyvoor was achieved in record time and a  
principle of `best man for the job` was applied to ensure retention of key      
competencies.                                                                   
The supervisory structure has been changed to incorporate production supervisors
who will take charge of the stopes, the overall objective being to improve      
discipline, increase efficiencies and reduce supervisory costs.                 
The re-processing of surface slimes is showing improvement following a shift in 
the recovery of material from Dam No. 4 to Dam No.5.  Metallurgical improvements
have resulted in an increase in recoveries of 53%.                              
Other sources of surface production are being investigated in order to utilize  
excess capacity in the gold plant.                                              
Phase 2 and 3 of the current plan is aimed at identifying the medium- to long-  
term potential of re-equipping the No. 2A sub shaft system in order to access   
previously abandoned resources.  Implementation will be dependant upon the      
successful turnaround of the existing operation.                                
North West                      Quarter     Quarter     % Change     Quarter    
(Hartebeestfontein and         Sep 2004    Jun 2004                 Sep 2003    
Buffelsfontein mines)                                                           
Area mined m2        000             92          91          1           102    
Development          m            8 340      11 017         (24)       8 434    
Face length          m            3 003       3 147          (5)       3 577    
Stoping width        cm             120         118          (2)         118    
Ore milled                                                                      
Underground       t`000          396         396           -          483    
   Surface           t`000          170          63         169          737    
   Total             t`000          566         459          23        1 220    
Yield                                                                           
Underground       g/t           5.54        5.84          (5)        4.74    
   Surface           g/t           1.09        3.38         (68)        0.74    
   Total             g/t           4.21        5.50         (23)        2.33    
Gold produced                                                                   
Underground       kg           2 195       2 312          (5)       2 291    
                     oz          70 572      74 333          (5)      73 657    
   Surface           kg             186         213         (13)         546    
                     oz           5 980       6 848         (13)      17 555    
Total             kg           2 381       2 525          (6)       2 837    
                     oz          76 552      81 181          (6)      91 212    
Capital expenditure  US$ m          2.1         1.7         (24)         1.6    
                     ZAR m         13.1        11.0         (19)        11.8    
Average labour strength           6 930       7 496           8       11 081    
Following the retrenchment of 119 employees at a cost of R 3.7 million at the   
Buffels section, the North West Operations have kept No. 9 and No. 11 shafts at 
Buffels in production. The principal focus, however, is on improving recovered  
grade and consequently the balance of mining will move to higher-grade shafts at
Harties - No. 2 shaft, No. 4 shaft and No. 5 shaft - with only selective mining 
taking place at No. 6 shaft, No. 7 shaft and No. 8 shaft. All production from   
underground is now treated at the South Plant and treatment rates of 125 000    
tonnes per month are planned for the rest of the financial year.                
During the quarter the North plant was re-commissioned and fed with screened    
waste rock dump material. This will continue until such time that the current   
source of material is depleted, with the additional possibility of processing   
alternative surface source material. This project generated 2 572 ounces (80    
kilograms) of gold during the month of September.                               
Crown (40% attributable)*       Quarter     Quarter     % Change     Quarter    
                               Sep 2004    Jun 2004                 Sep 2003    
Ore milled           t`000          913         952          (4)       1 013    
Yield                g/t           0.42        0.41           2         0.40    
Gold produced        kg             382         392          (3)         408    
                     oz          12 282      12 603          (3)      13 117    
Average labour strength #           833         846           2          807    
* Crown accounted for on an equity basis.                                       
# Represents total mine.                                                        
ERPM (40% attributable)*        Quarter     Quarter     % Change     Quarter    
Sep 2004    Jun 2004                 Sep 2003    
Area mined m2 #      000             25          29         (14)          39    
Development #        m               74         240         (69)       1 042    
Face length #        m              770       1 081         (29)       1 360    
Stoping width #      cm             128         140           9          118    
Ore milled                                                                      
   Underground       t`000           47          56         (16)          62    
   Surface           t`000          152          86          77            -    
Total             t`000          199         142          40           62    
Yield                                                                           
   Underground       g/t           6.70        6.61           1         5.91    
   Surface           g/t           0.26        0.26           -            -    
Total             g/t           1.79        2.75         (35)        5.91    
Gold produced                                                                   
   Underground       kg             315         370         (15)         369    
                     oz          10 127      11 896         (15)      11 858    
Surface           kg              40          22          82            -    
                     oz           1 287         708          82            -    
   Total             kg             355         392          (9)         369    
                     oz          11 414      12 604          (9)      11 858    
Average labour strength #         2 125       2 932          28        3 182    
* ERPM accounted for on an equity basis.                                        
# Represents total mine.                                                        
As reported in the previous quarter, the ERPM operation has undergone extensive 
restructuring. The outcome of the restructuring program was for the ERPM        
underground operations to be placed on controlled closure program ending in     
March 2005. Following the retrenchment of 806 employees in August 2004, the mine
has achieved a significant reduction in costs coupled with improved             
productivity. As a result the mine has been restored to profitability, and the  
original planned closure of the underground section has been postponed. Progress
in the quarter under review has been very satisfactory, particularly the 55%    
improvement in productivity. Productivity, measured in terms of metres face     
advance per employee, had reached a new record of 11.8 metres in September 2004 
compared with a low of 7.6 metres in March 2004. The focus now is on the mine`s 
Far East Vertical (FEV) and South East Vertical (SEV) shafts.                   
The plan is to insert up to eight `high pressure concrete plugs` to isolate the 
FEV and SEV shafts allowing the rest of the mine to fill with water. Discussions
are in progress with the relevant Government agencies to provide financial      
assistance for the plugs and the re-institution of the State water pumping      
subsidy which was suspended in April this year.                                 
At Crown surface, production was steady. The Company is investigating a number  
of new surface sources to complement its life of mine profile.                  
EXPLORATION                                                                     
DRDGOLD`s exploration is based around its wholly owned PNG operation, Tolukuma. 
As reported in the previous quarter, the Company has increased its drilling and 
exploration activities, focusing on near mine exploration utilising its five    
owned drill rigs. Encouraging drill data has again been collected over the past 
quarter. Surface diamond drilling of the Zine Vein south of the Zine pit has    
been completed and a resource calculation has been undertaken.  A feasibility   
study looking at open cast mining of this vein is under way.                    
Gulbadi South Extension                                                         
Underground drilling of the southern extension of the Gulbadi vein is ongoing   
and encouraging results are being encountered in drill holes approximately 1 312
feet (400 metres) south of current mine workings.                               
Values in hole TUO20, approximately 400 metres south of current mine workings   
showed 2.9 metres @ 57.2 grams per tonne Au (including 1.6 metres @ 102.7 grams 
per tonne Au)                                                                   
Significant results are listed in the table below. Infill drilling is now       
being undertaken between the drill holes shown below and the current workings   
to evaluate this zone.                                                          
Gulbadi South underground drilling statistics:                                  
Hole No  From     To   True     Au    Ag   Comments                             
          (m)    (m)   width  (g/t) (g/t)                                       
TU004   260.7  261.7    0.6   10.5    22                                        
TU009   259.9  262.2    0.8    9.9    23   Includes 0.2m @19.5 g/t Au           
TU010   284.4  284.5    0.1  453.4   314   Visible gold <5m above               
                                           main structure                       
TU011   254.5  257.6    2.5    7.7    30   Includes 0.7 @ 26.7 g/t Au           
TU016   370.9  371.7    0.6    6.9    12                                        
TU018   260.9  265.9    3.0    6.8    37   Visible gold. Includes               
                                           0.7m @ 7.8 g/t and 0.6m @            
                                           22.5 g/t Au                          
TU020   263.4  267.0    2.9   57.2    21   Visible gold. Includes               
                                           2.9m @ 57.2 g/t Au                   
Lock and Dagakuma                                                               
Diamond drilling has begun following the encouraging results encountered in     
surface trenching. To date results have been erratic, so geological             
interpretation and drilling is being undertaken to decide whether to continue   
with exploration of these veins.                                                
120/Zine North Project                                                          
Geological mapping, trenching and sampling of the 120/Zine North project has    
been carried out over a distance of 1 476 feet (450 metres). Results to date    
have been sufficiently encouraging that follow-up diamond drilling will be      
carried out in due course.                                                      
At Porgera, a significant underground exploration program aimed at identifying  
additional resources and changing resources to reserves is ongoing. This program
is focused on re-evaluation of the Central, North Zone and Eastern Deeps,       
delineation drilling of the North Zone and exploration drilling of the East     
Zone.                                                                           
A target generation study has identified a number of additional exploration     
targets either as extensions of known structures or new structures. It is likely
that these targets will be drilled in due course.                               
BOARD CHANGES                                                                   
David Baker, who joined the board in January 2002, retires with effect from 27  
October 2004 due to increased commitments. We would like to thank David for his 
valuable service and insight as a director.                                     
DRDGOLD is pleased to announce the appointment of James Turk, an American       
citizen, to the board as a non-executive director. James is the founder and a   
director of GoldMoney (www.goldmoney.com), the operator of a digital gold       
currency payment system based on three U.S. patents awarded to him. He has      
specialised in international banking, finance and investment since graduating in
1969 from George Washington University with a B.A. degree in International      
Economics. DRDGOLD acquired a strategic 50.25% interest in a subsidiary (Net-   
Gold Services Ltd) of the internet-based gold investment company, G.M. Network  
Limited (GoldMoney.com) during 2004.                                            
MARK WELLESLEY-WOOD      IAN MURRAY                                             
Executive Chairman       Chief Executive Officer and Chief Financial Officer    
27 October 2004                                                                 
INVESTOR INFORMATION AS AT 30 SEPTEMBER 2004                                    
DIRECTORS - (*British)(**Australian)                                            
Executives:                                                                     
MM Wellesley-Wood (Executive Chairman)*                                         
IL Murray (Chief Executive Officer and Chief Financial Officer)                 
Non-executives:                                                                 
MP Ncholo ; RP Hume ; GC Campbell* ; DC Baker** ; D Blackmur**                  
Alternate:                                                                      
A Lubbe                                                                         
Group Company Secretary:                                                        
AI Townsend                                                                     
INVESTOR RELATIONS                                                              
For further information, contact Ilja Graulich at:                              
Tel: (+27-11) 381-7800, Fax: (+27-11) 482-4641,                                 
e-mail: ilja.graulich@za.drdgold.com,                                           
website: http://www.drdgold.com                                                 
45 Empire Road,                                                                 
Parktown,                                                                       
South Africa.                                                                   
PO Box 390,                                                                     
Maraisburg, 1700,                                                               
South Africa.                                                                   
Date: 27/10/2004 08:01:33 AM                     
Produced by the JSE SENS Department
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: