Thu 28 Oct 2004, 13:04 Results Quarter Ended 30 September 2004
Gold Fields Limited - Quarterly Results                                         
Gold Fields Limited                                                             
Incorporated in the Republic of South Africa                                    
Registration number 1968/004880/06                                              
Share code:        GFI                                                          
Issuer code:       GOGOF                                                        
ISIN: ZAE000018123                                                              
Quarter Ended 30 September 2004                                                 
News Release Q1 F2005 Results - unaudited                                       
South African operations continue to produce excellent results                  
under difficult conditions                                                      
Stock data                                                                      
Number of shares in issue                                                       
- at 30 September 2004                                       491,714,615        
- average for the quarter                                    491,604,675        
Free Float                                                   100%               
ADR Ratio                                                    1:1                
Bloomberg / Reuters                                          GFISJ / GFLJ.J     
JSE Securities Exchange South Africa-(GFI)                                      
Range - Quarter                                      ZAR87.50 - ZAR55.09        
Average Volume - Quarter                             1,644,000 shares / day     
NYSE - (GFI)                                                                    
Range - Quarter                                      US$13.65 - US$55.9         
Average Volume - Quarter                             1,100,000 shares / day     
JOHANNESBURG. 28 October 2004 - Gold Fields Limited (NYSE & JSE: GFI) today     
announced September 2004 quarter net earnings of R102 million (21 cents per     
share) compared with a net loss of R186 million (39 cents per share) in the     
June 2004 quarter and R421 million (89 cents per share) for the September       
quarter of 2003. In US dollar terms the September 2004 quarter net earnings are 
US$16 million (US$0.03 per share) compared with a loss of US$25 million         
(US$0.05 per share) in the June 2004 quarter and US$57 million (US$0.12 per     
share) for the September quarter of 2003:                                       
September 2004 quarter salient features:                                        
     Attributable gold production on target at 1,007,000 ounces;                
     Costs well controlled with total cash costs up less than 1 per cent to     
R66,516 per kilogram (US$325 per ounce);                                  
      Costs at South African operations quarter on quarter flat at              
       approximately R73,000 per kilogram, despite 7 per cent wage increase;    
      Operating profit of R456 million (US$72 million) achieved despite a lower 
rand gold price and a small planned reduction in gold produced;          
      Growth projects on track with St Ives and Tarkwa expansion and            
       optimisation projects scheduled for completion before the end of 2004,   
       and work on Arctic Platinum Project in Finland and Cero Corona Project   
in Peru is continuing;                                                   
      Proposed combination of Gold Fields` international assets with IAMGold    
       to create Gold Fields International scheduled to be completed before the 
       end of the year.                                                         
Ian Cockerill,                                                                  
Chief Executive Officer of Gold Fields said:                                    
`In line with guidance provided for the quarter, Gold Fields delivered another  
solid operational performance.                                                  
The strategic repositioning of the South African operations through Project     
500, to cope with the strong local currency, continues to deliver the expected  
results, reflecting the inherent quality and flexibility of these assets.       
Particularly pleasing has been our ability to control costs, offsetting the 7   
per cent wage increase implemented at these operations during the quarter. Our  
initial target remains to reduce costs at the South African operations to       
R70,000 per kilogram, and we are striving to achieve this.`                     
                                                SA Rand                         
Quarter                        
Salient features                                                                
                           September       June     September                   
                                2003       2004          2004                   
Gold produced*                32,299     32,419        31,317            kg     
Total cash costs              67,566     66,218        66,516          R/kg     
Tons milled                   11,497     11,076        11,043           000     
Revenue                       86,184     83,731        81,815          R/kg     
Operating costs                  204        213           212         R/ton     
Operating profit                 570        545           456            Rm     
Net earnings                     421      (186)           102            Rm     
                                  89       (39)            21     SA c.p.s.     
Headline earnings                164        129           102            Rm     
Net earnings excluding            35         26            21     SA c.p.s.     
gains and losses on              136        102           (6)            Rm     
financial instruments and                                                       
foreign debt net of cash          29         21           (1)     SA c.p.s.     
and exceptional items                                                           
                                               US Dollars                       
                                                Quarter                         
September       June     September     
                                              2004       2004          2003     
Gold produced*              oz (000)         1,007      1,042         1,038     
Total cash costs                $/oz           325        312           282     
Tons milled                      000        11,043     11,076        11,497     
Revenue                         $/oz           400        395           360     
Operating costs                $/ton            33         32            27     
Operating profit                  $m            72         83            77     
Net earnings                      $m            16       (25)            57     
                           US c.p.s.             3        (5)            12     
Headline earnings                 $m            16         20            22     
                           US c.p.s.             3          4             5     
Net earnings excluding            $m           (1)         16            18     
gains and losses on                                                             
financial instruments and                                                       
foreign debt net of cash                                                        
and exceptional items      US c.p.s.             -          4             4     
*Attributable - All companies wholly owned except for Ghana (71.1%).            
Commentary                                                                      
Health and Safety                                                               
During the quarter the fatal injury frequency rate improved by 50 per cent from 
0.26 to 0.13, while the lost day injury frequency rate                          
regressed marginally from 11.9 to 12.5 and the serious injury                   
frequency rate from 5.9 to 6.7.                                                 
While the improvement in the fatal injury frequency rate is                     
commendable, the deterioration in the lost day and serious injury               
frequency rates are a source of concern. Management attention is                
focused on these metrics. The Du Pont Health and Safety Review                  
was completed during the quarter and a report submitted to                      
management. The recommendations from this report are being                      
reviewed for implementation.                                                    
The annual safety awards for F2004 were presented during this                   
quarter with Beatrix walking off with the highest honours in the Group.         
Beatrix continued its sterling performance into Q1 F2004 by achieving           
2 million fatality free shifts for the whole mine during June and again,        
for 1, 2 and 3 shafts, during September. During the quarter Damang              
also achieved 2 million fatality-free shifts and Driefontein achieved 1         
million fatality free shifts.                                                   
Financial Review                                                                
Quarter ended 30 September 2004                                                 
compared with quarter ended                                                     
30 Jun e 2 004                                                                  
Revenue                                                                         
As planned, attributable gold production decreased by 3 per cent to 1,007       
million ounces for the September 2004 quarter, compared with 1,042 million      
ounces in the June 2004 quarter. The contribution of the South African          
operations was unchanged at 700,000 ounces while that of the international      
operations was down by 10 per cent to 307,000 ounces. This was in line with the 
expected lower production at Damang, St Ives and Agnew.                         
Combined with a 2 per cent decline in the gold price received, this resulted in 
revenue reducing by 6 per cent to R2,705 million (US$425 million) from R2,869   
million (US$434 million) the previous quarter.                                  
The higher US dollar gold price achieved for the September quarter, (US$400 per 
ounce, compared with US$395 per ounce in the June quarter) was offset by the    
strengthening of the rand against the US dollar from an average of R6.60 to     
R6.36 quarter on quarter. As a result the rand gold price decreased from        
R83,731 per kilogram in the June quarter to R81,815 per kilogram in the         
September quarter.                                                              
Operating costs                                                                 
Operating costs for the September quarter, at R2,336 million (US$367 million)   
were 1 per cent below the June quarter`s R2,364 million (US$357 million). This  
was achieved through the introduction of more rigorous cost reduction measures  
inherent in Project 100, as well as benefits starting to flow through from the  
new supply chain management initiative introduced across the Group as part of   
the Shared Services initiative.                                                 
Costs at the South African operations increased by less than 1 per cent despite 
the 7 per cent wage increase implemented on 1 July 2004, as well as normal      
inflationary pressures such as increased steel and oil prices. Steel prices have
increased by 70 per cent in the last 6 months.                                  
At the international operations costs of R672 million were 5 per cent lower     
than the R711 million reported in the June quarter. In the domestic currencies  
these costs were flat with Ghana reporting costs of US$50 million and Australia 
A$80 million.                                                                   
The gold inventory change resulted in a credit of R87 million (US$14 million)   
to costs, which was more than double that of the previous quarter. This was due 
to growth in gold in process on the Tarkwa leach pads and the build-up of       
stockpiles at St. Ives and Tarkwa, aimed at providing feedstock for the         
commissioning of the new mills at both of these operations during the December  
quarter.                                                                        
Operating profit margin                                                         
The net effect of the lower revenue and lower costs, after taking account of    
gold in process movements, was an operating profit of R456 million (US$72       
million). This is 16 per cent lower than the R545 million (US$83 million)       
achieved in the June quarter. The Group margin decreased to 17 per cent from 19 
per cent in the June quarter, while the South African margin decreased from 9   
per cent to 7 per cent. This reduction in margin was virtually all due to the   
lower rand gold price received. The margin at the international operations was  
unchanged at 36 per cent.                                                       
Amortisation                                                                    
Amortisation of R371 million (US$58 million) for the September quarter is 12    
per cent higher than the June quarter`s R332 million (US$50 million). This      
increase was due to increased mining volumes at the international operations,   
mainly at St. Ives to build up a stockpile for the new mill, together with      
amortisation of the new mining fleet at Tarkwa. Amortisation at St Ives is      
based on ounces mined not ounces produced.                                      
Amortisation at the South African operations increased by R19 million (US$3     
million) or 13 per cent mainly due to the impact of a reclassification of       
reserves at Kloof. These reserves, previously planned to be mined through a     
decline from 7 shaft, will now be mined from the 4 shaft current infrastructure 
above 45 level. Differences in cost structure and timing of the mining of these 
reserves, has increased the amortisation charge.                                
Other income                                                                    
Net interest and investment income of R16 million (US$3 million) decreased from 
R28 million (US$4 million) in the June quarter. This resulted from the lower    
cash balances held, compounded by lower interest rates received.                
Gains on foreign debt and cash amounted to R16 million (US$3 million). This     
compares to R76 million (US$11 million) in the June quarter which included an   
accounting exchange gain of R86 million (US$12 million) on the settlement of an 
offshore inter-company loan with no attendant cash flow implications.           
During the quarter under review the strengthening of the euro against the US    
dollar, from 1.2175 to 1.2308, resulted in a gain of R16 million (US$3          
million). We currently have euro 164 million in an offshore account, arising    
from the capital raising undertaken in November 2003.                           
The gain on financial instruments of R152 million (US$24 million) included a    
marked to market gain on an interest rate swap of R147 million (US$23 million); 
a gain on the Tarkwa rand/US dollar financial instruments of R2 million; and a  
R3 million gain on the Australian dollar/US dollar call options.                
The interest rate swap was established in relation to the loan from Mvela Gold, 
and converted a fixed interest rate exposure to a floating rate. This           
instrument was established as short-term rates are significantly lower than     
long-term rates and the resultant upward sloping yield curve is expected to     
prevail for some time. This strategy is yielding positive results with a R14    
million cash benefit for the September quarter and a cumulative R31 million     
cash benefit to date.                                                           
A further R22 million cash benefit has been locked in for the three- month      
period to December 2004. More details on these financial instruments are given  
on page 11 of this report.                                                      
Other expenses, which were R31 million (US$4 million) in the previous quarter   
reduced to R5 million (US$1 million) in the September quarter. This change was  
mainly due to optimising stores consumption and procurement practices in the    
Group and restructuring costs at Shared Services incurred in the June quarter.  
Exploration expenditure decreased from R62 million to R55 million in the        
September quarter. This was due to the stronger rand, as in US dollar terms     
expenditure was unchanged at US$9 million. This level of expenditure is set to  
continue over the coming quarter.                                               
For the September quarter there were no exceptional items. The exceptional loss 
last quarter of R432 million (US$62 million) was primarily as a result of the   
impairment at Beatrix 4 shaft (formerly Oryx) of R426 million (US$62 million).  
Taxation                                                                        
A taxation charge of R86 million (US$14 million) in the September quarter       
compared with a credit of R124 million (US$18 million) realised in the June     
quarter. This variance is mainly due to the deferred tax credit last quarter of 
R111 million (US$17 million) on the impairment at Beatrix 4 shaft and a tax     
credit of R26 million on the loss on financial instruments, compared with a     
charge this quarter of R59 million. Damang provided for normal tax for the      
first time of R8 million (US$1 million), having fully utilised its remaining    
capital allowances during the quarter.                                          
Earnings                                                                        
After accounting for minority interests, earnings amounted to R102 million      
(US$16 million) or 21 SA cents per share (US$0.03 per share), compared with a   
loss of R186 million (US$25 million) or negative 39 SA cents per share (US$0.05 
per share negative) in the previous quarter.                                    
Headline earnings i.e. earnings less the after tax effect of asset sales,       
impairments and the sale of investments, amounted to R102 million (US$16        
million) or 21 SA cents per share (US$0.03 per share) compared with R129        
million (US$20 million) or 26 SA cents per share (US$0.04 per share) last       
quarter. The main reason for this decrease was the reduced net operating profit 
partly offset by the gain on the Mvela interest rate swap.                      
Loss/earnings, excluding exceptional items as well as net gains on financial    
instruments and foreign debt net of cash after taxation, amounted to a loss of  
R6 million (US$1 million negative) or negative 1 SA cents per share (US$0.00    
per share) compared with earnings of R102 million (US$16 million) or 21 SA      
cents per share (US$0.04 per share) achieved last quarter.                      
Cash flow                                                                       
Cash flow from operating activities for the quarter was R198 million (US$31     
million), compared with operating cash flow in the June quarter of R436 million 
(US$66 million). The decrease largely reflects the decline in revenue.          
A dividend of R197 million (US$29 million) was paid to ordinary shareholders    
and R64 million (US$10 million) to minority shareholders. No dividend was paid  
in the June quarter.                                                            
Capital expenditure was R755 million (US$119 million) compared with R938        
million (US$139 million) in the June quarter. The decrease is mainly due to the 
completion of the owner mining project in Tarkwa, where capital expenditure     
halved to R194 million (US$31 million). At the South African operations capital 
reduced by R37 million (US$10 million) to R148 million (US$23 million) largely  
due to timing. A significant portion of this expenditure was directed at the    
major projects with R20 million at 1 tertiary and 5 shaft at Driefontein, R37   
million at Kloof 4 shaft and R41 million at Beatrix 3 shaft. The Australian     
operations incurred capital expenditure of R370 million (A$82 million). The     
mill project at St. Ives accounted for R186 million (A$41 million) of this      
expenditure as compared to R224 million (A$45 million) in the June quarter. The 
balance on this project, the majority of which will be spent during the         
December quarter, amounts to A$19 million. At the Ghanaian operations, capital  
expenditure amounted to R204 million (US$32 million). R165 million (US$26       
million) was spent on the new mill and on the project to convert from contract  
mining to owner mining. This compares with R361 million (US$58 million) in the  
previous quarter. The balance on these projects, which will be spent in the     
December quarter, amounts to US$10 million. Major projects are still forecast   
to be in line with approved votes except for US$4 million over expenditure on   
the mill project at Tarkwa, and a further US$6 million depending on currency    
moves over the next quarter.                                                    
Net cash outflow for the quarter was R795 million (US$124 million).             
The cash balance at the end of the June quarter was R4,135 million (US$656      
million) which has declined to R3,409 million (US$524 million) at the end of    
September.                                                                      
Detailed and Operational Review                                                 
Group overview                                                                  
Attributable gold production for the September 2004 quarter decreased 3 per     
cent to 1,007,000 ounces when compared with the June quarter. Attributable      
production from the South African operations was unchanged at 700,000 ounces,   
which is slightly more than two thirds of the Group`s total attributable        
production.                                                                     
At the South African operations, the decrease at Driefontein of 6,800 ounces    
was offset by increased production at Kloof. Production at Beatrix was flat     
quarter on quarter. The decrease at Driefontein was due to lower underground    
grades and lower surface tonnage.                                               
Operating profit at the South African operations decreased from R163 million    
(US$25 million) to R120 million (US$19 million), mainly as a consequence of the 
lower rand gold price.                                                          
Production from the Australian operations decreased 14 per cent to 168,900      
ounces this quarter because of the planned lower volumes at Agnew and the       
scheduled termination of toll milling at St. Ives.                              
Operating profit from the Australian operations decreased quarter on quarter by 
10 per cent in rand terms to R143 million (A$32 million, US$22 million: both    
virtually unchanged from last quarter), primarily as a result of the decreased  
production at Agnew and the weaker US dollar. The Ghanaian operations showed a  
6 per cent decrease in attributable gold production to 137,800 ounces as there  
was a reduction of high grade ore from Damang pit, as forecast. Tarkwa          
increased gold production marginally but did not meet the increased forecast.   
This was due to the increase in gold in process on the leach pads, although     
mining and stacking operations performed well.                                  
Ghana contributed operating profit of R193 million (US$30 million), a 14 per    
cent decrease on the previous quarter`s operating profit, in line with the      
decrease in gold production.                                                    
Group ore milled decreased from 11.08 million tons to 11.04 million tons as     
surface tons reduced at all operations except Tarkwa during the quarter. The    
overall yield decreased from 3.1 grams per ton in the June quarter to 3.0 grams 
per ton in the current quarter. Total cash costs in rand terms were virtually   
unchanged at R66,516 per kilogram.                                              
In US dollar terms, total cash costs increased 4 per cent to US$325 per ounce,  
compared with US$312 per ounce last quarter, mainly due to the stronger rand.   
Operating cost per ton at R212 was virtually unchanged when compared to last    
quarter.                                                                        
The international operations contributed R336 million (US$53 million) of the    
total operating profit of R456 million (US$67 million) or 74 per cent. This     
compares with R383 million (US$58 million) of the total operating profit of     
R545 million (US$83 million) or 70 per cent last quarter.                       
South African operations                                                        
During the September 2003 quarter management took a view that the South African 
currency would remain stronger for longer. As a result it was decided to        
reposition the South African operations. As previously reported this was        
presented as reverting from the `Wal-Mart` strategy (more volume at lower       
grade) to the `SAKS 5th Avenue` strategy (less volume at higher grade).         
To support this switch in strategy, management introduced an initiative called  
Project 500, which, in turn, was split into two sub- projects called: Project   
100 and Project 400.                                                            
Project 100, focused mainly on introducing improved standards and norms,        
thereby improving control over the consumption of materials, together with      
engineering benchmarking. The project targets annualised savings of R100        
million. By the end of September, benefits of R52 million were recorded,        
compared with R41 million planned.                                              
Project Beyond was launched on the South African operations during May and aims 
to reduce stores and service expenditure by between R200 and R300 million per   
annum over the next three years. Savings are derived from the application of    
best practice procurement techniques to Gold Fields` annual procurement spend   
for the South African operations, of around R3 billion. Contract price          
reductions of around R100 million are targeted for this year, of which          
approximately 50 per cent will flow as actual cost reductions in the period. A  
major, and highly successful, component of the procurement strategy involves    
the use of electronic auctions. Savings of over R20 million against the current 
cost base have accrued, mainly from two auction events - for conveyer belting   
and grinding media - together with negotiated reductions in the price of        
cyanide. Similar events are planned for engineering repairs, roof support,      
foodstuffs, explosives, fuels and lubricants and underground services in the    
months ahead.                                                                   
These strategies produce significant cost savings without any sacrifice of      
quality or increase in supply risk. Similar projects for the Australian and     
Ghanaian operations are being planned. Indications are that cost savings of     
between R200 to R300 million could be achieved in these regions.                
Since adopting a shared services model early last year Gold Fields has reduced  
stores inventory by around 30 per cent through the introduction of new          
operating practices together with rationalisation of vendors and                
standardisation of materials. This resulted in a Gold Logistics Achievement     
Award for Gold Fields from the logistics industry.                              
Project 400 aims to optimise revenue such that an additional R400 million is    
generated per annum. The aim is to improve the quality and quantity of our      
outputs by replacing surface tonnage to the plant with increased tonnage from   
underground and ensuring output of a better quality.                            
This strategy has started to deliver results.                                   
Underground grades have moved closer to life of mine averages and surface       
tonnage at all South African operations has been reduced, replaced              
by underground tonnage.                                                         
Paylimits are also in line with project parameters. Gold Fields continues to    
prudently manage its ore reserves and is not high grading as the table below    
clearly shows.                                                                  
Project 500 will reinstate more respectable margins at current prices           
and aims to achieve the following at Driefontein, Kloof and Beatrix:            
Driefontein                                                                     
Mine in a range of between 1,900 and 2,100 centimetre grams per ton            
(`cmg/t`). This translates to an estimated underground recovered yield of above 
8.0 grams per ton.                                                              
 Implement restructuring and cost saving measures of R2.0 million per month.    
Maintain the production profile at + 1 million ounces per annum.                
Kloof                                                                           
 Mine in a range of between 2,200 and 2,350 cmg/t. This translates to an        
estimated underground recovered yield of above                                  
9.0 grams per ton.                                                              
 Implement restructuring and cost saving measures of R2.0 million per month.    
 Maintain the production profile at + 1 million ounces per annum.               
Beatrix                                                                         
Mine in a range of between 1,000 and 1,100 cmg/t at number 1, 2 and 3 shafts   
and in a range of between 1,400 and 1,500 cmg/t at number 4 shaft. This         
translates to an estimated combined underground recovered yield of 4.8 grams    
per ton.                                                                        
Implement restructuring and cost saving measures of R1.5 million per month.     
 Maintain the production profile of +600 thousand ounces per annum.             
Progress on project 400                                                         
Quarter ended                       Sep      Dec      Mar      Jun      Sep     
2003     2003     2004     2004     2004     
Driefontein:                                                                    
Life of mine head grade as per                                                  
the 2003 and 2004 annual report     8.7      8.7      8.7      8.7      8.1     
Life of mine head grade adjusted                                                
for estimated metallurgical                                                     
                                    8.4      8.4      8.4      8.4      7.8     
recoveries                                                                      
Project 400 - call                    -        -        -        -      8.0     
Driefontein (underground yields                                                 
achieved)                           8.1      7.5      8.6      8.5      8.1     
Kloof:                                                                          
Life of mine head grade as per                                                  
the 2003 and 2004 annual report     9.8      9.8      9.8      9.8     10.5     
Life of mine head grade adjusted                                                
for estimated metallurgical                                                     
9.5      9.5      9.5      9.5     10.2     
recoveries                                                                      
Project 400 - call                    -        -        -        -      9.0     
Kloof (underground yields                                                       
achieved)                                                                       
                                    8.1      8.6     10.0      9.5      9.1     
Beatrix:                                                                        
Life of mine head grade as per                                                  
the 2003 and 2004 annual report     5.1      5.1      5.1      5.1      5.5     
Life of mine head grade adjusted                                                
for estimated metallurgical                                                     
                                    4.9      4.9      4.9      4.9      5.3     
recoveries                                                                      
Project 400 - call                    -        -        -        -      4.8     
Beatrix (underground yields                                                     
achieved)                           4.4      4.7      4.5      4.7      4.4     
Progress on Project 500                                                         
The cost savings targeted above have largely been achieved and have contributed 
towards the offsetting of the 7 per cent wage increase during the quarter. Our  
thrust remains on producing quality volume and, while significant progress has  
been made since September 2003 when we switched to the SAKS 5th avenue strategy 
as shown in the table , there is still upside in improving the underground      
grades to match the life of mine head grades at Kloof and Beatrix.              
Driefontein is mining to its life of mine grade.                                
A full explanation of project 500 can also be found on the Gold Fields website  
- www.goldfields.co.za                                                          
R78,000 per kilogram plan                                                       
As a result of the decrease in the rand gold price to below R80,000 per         
kilogram during the quarter a new mining plan was drawn up at a gold price of   
R78,000 per kilogram. Due to the gold price and exchange rate uncertainty which 
exists, this plan, which includes capital reassessment, sourcing higher grade   
material to replace surface material, contractor reduction and mine             
restructuring amongst others, has been implemented in conjunction with project  
500.                                                                            
General                                                                         
The South African operations have, over the past 4 years undergone extensive    
restructuring and renewal to reposition for the future. On each of our          
operations, we have invested significantly in the construction and development  
of new long life shafts. At Driefontein, capital has been invested into 5 east  
and 1 tertiary shafts; at Kloof the new 4 shaft; and Beatrix the new 3 shaft.   
In addition, our metallurgical plants have been upgraded. Environmental         
conditions at all shafts have and are being improved through the on going       
lowering of temperatures, and infrastructure bottlenecks are being resolved.    
Over this period Gold Fields has also invested significantly in the development 
of its ore bodies, with all the key long life shafts now having an average of   
20 months of mineable developed ore reserves in place.                          
During the quarter additional shifts were worked-in so that stockpiles could be 
built up to ensure continuous milling over the Christmas period. This proved    
successful, and over 50,000 tons were stockpiled at the South African           
operations during the quarter.                                                  
   Driefontein                                                                  
                                                       September       June     
2004       2004     
Gold produced                            - 000`ozs         283.5      290.3     
Yield - underground                      - g/t               8.1        8.5     
      - combined                         - g/t               5.7        5.6     
Total cash costs                         - R/kg           67,419     67,372     
                                         - US$/oz            330        317     
Production at Driefontein decreased 2 per cent to 283,500 ounces from 290,300   
ounces in the June quarter. This reduction was attributable to a lower          
underground yield and a 15 per cent decline in surface tonnage treated. The     
yield from underground reduced from                                             
8.5 grams per ton last quarter to 8.1 grams per ton in the September quarter.   
The lower yield resulted from a move towards the project 400 call rate of       
8.0 grams per ton and was also influenced by an increase in seismicity at       
the higher grade 5 shaft and 6 shaft complexes. Total tons milled decreased     
5 per cent to 1.54 million tons in line with the lower milling days this        
quarter. Tons milled from underground increased 2 per cent to 950,000 tons.     
The increased underground tons replaced surface tonnage and together with       
less milling days resulted in a decrease in surface tonnage from 695,000        
tons last quarter to 594,000 tons in the September quarter. The lower           
surface tonnage to underground tonnage ratio led to an improved combined        
yield from 5.6 grams per ton to 5.7 grams per ton for the quarter.              
Total cash costs were virtually unchanged in Rand terms at R67,419 per          
kilogram. This was despite the lower gold production and the implementation of  
the annual wage increase. In US dollar terms the total cash costs increased by  
4 per cent from US$317 per ounce to US$330 per ounce quarter on quarter due to  
differences in the rand/dollar exchange rate. Operating profit declined by 17   
per cent to R99 million (US$16 million) in the current quarter. The two main    
contributors were a 3 per cent drop in the rand gold price and a 2 per cent     
decline in gold production. The lower rand gold price and reduced earnings      
advocate the constant reassessment, as well as the re-scheduling, of            
non-crucial capital items. Therefore, capital expenditure decreased to R31      
million (US$5 million) for the quarter compared to R40 million (US$7 million)   
in the previous quarter.                                                        
Gold output for the December quarter is expected to be similar to the September 
quarter. Seismicity at number 5 shaft complex is still a concern. However, the  
completion of the refrigeration plant, scheduled for the end of December 2004,  
will improve the overall                                                        
ventilation at number 5 shaft complex and will enable face length to be         
increased with the accompanying enhanced flexibility.                           
Kloof                                                                           
September              June              
                                            2004              2004              
Gold produced            - 000`ozs          266.6            259.2              
Yield - underground      - g/t                 9.1             9.5              
- combined        - g/t                 6.6             6.6              
Total cash costs         - R/kg            73,484           74,191              
                         - US$/oz             359              350              
Gold production at Kloof increased 3 per cent to 266,600 ounces in the          
September quarter. This was due to increased mining volumes from underground    
sources in the September quarter compared to the previous quarter. Underground  
tonnage increased 9 per cent to 890,000 tons this quarter from 818,000 tons,    
while surface tons decreased from 407,000 tons to 369,000 tons as a result of   
the increased underground volumes. The underground yield decreased from 9.5     
grams per ton last quarter to 9.1 grams per ton this quarter, with the combined 
yield constant at 6.6 grams per ton. The lower underground yield is in line     
with the project 400 call rate.                                                 
Operating costs at R636 million (US$100 million) for the quarter increased by 2 
per cent when compared to the previous quarter`s costs of R621 million (US$94   
million). This was mainly as a result of the increased underground production   
and annual wage increases.                                                      
Total cash costs at R73,484 per kilogram were 1 per cent below the previous     
quarter`s R74,191 per kilogram. In US dollar terms, cash costs increased from   
US$350 per ounce to US$359 per ounce quarter on quarter, due to the stronger    
rand. Operating profit decreased from R49 million (US$7 million) the previous   
quarter to R42 million (US$7 million) this quarter. Main factors were the lower 
gold price received and increased operating costs. Capital expenditure          
decreased from R76 million (US$14 million) to R59 million (US$9 million) this   
quarter, as capital expenditure in the current environment is constantly re-    
assessed.                                                                       
The outlook for the December quarter is a further increase in gold production   
to above 270,000 ounces, while entrenching the R78,000 per kilogram plan.       
Beatrix                                                                         
September              June            
                                              2004              2004            
 Gold produced             - 000`ozs          150.1            150.2            
 Yield - underground       - g/t                4.4              4.7            
- combined         - g/t                4.0              3.8            
 Total cash costs          - R/kg            83,912          81,978             
                           - US$/oz             410              386            
Gold production at Beatrix was constant quarter on quarter at 150,100 ounces.   
Underground ore volumes increased by 6 per cent from 968,000 tons in the June   
quarter to 1,029,000 tons in the September quarter. The combined yield          
increased by 5 per cent quarter on quarter from 3.8 grams per ton to 4.0 grams  
per ton. This increase in yield was partially due to reduced surface tonnages,  
which reduced from 254,000 tons in the June quarter to 147,000 tons in the      
September quarter, as toll milling was terminated by Harmony at the Joel plant  
at the end of July. Surface yields increased from 0.6 grams per ton to 0.8      
grams per ton quarter on quarter. Underground yields decreased from 4.7 grams   
per ton in the June quarter to 4.4 grams per ton in the September quarter. At   
the Beatrix 1-3 shaft operation underground yields were maintained. At 4 shaft  
where the underground yield decreased from 6.2 grams per ton to 5.6 grams per   
ton. The reduction in grade at the 4 shaft operation was primarily due to the   
inability to clean and tram broken rock from a number of high-grade stopes      
during the quarter. The restriction to tram from these stopes was due to        
rehabilitation of a number of access tunnels due to poor ground conditions and  
track upgrades being done on the main 4 shaft tramming levels, in preparation   
for the zone 5 mining.                                                          
The overall Beatrix mine call factor (MCF) was below plan. Efforts to restore   
the MCF to planned levels continue through improved fragmentation, sweepings    
and water reduction. As part of ongoing rationalisation, the Beatrix 1-3 shaft  
operation has been restructured into a North and South to improve logistics,    
eliminate duplication, and improve focus and accountability, whist reducing     
overheads. The North consists of the new 3 shaft complex and 3 sections (below  
16 level) from 1 shaft, which are in close proximity to 3 shaft. The South      
section consists of 2 shaft and the remaining sections from 1 shaft above 16    
level. Number 4 shaft (formerly Oryx) has been included as the third operating  
section. Management at Beatrix has now been centralised, eliminating            
duplication of various structures and overheads which existed due to the duel   
management structure at Beatrix and Oryx.                                       
Operating costs increased 3 per cent to R406 million (US$64 million) due to     
restructuring costs and the annual wage increase. Total cash costs increased    
similarly to R83,912 per kilogram (US$410 per ounce) from R81,978 per kilogram  
(US$386 per ounce) quarter on quarter.                                          
At the operating level, a loss of R20 million (US$3 million) resulted from the  
above factors and the previously discussed lower gold price, as compared to a   
R7 million (US$1 million) loss in the June quarter.                             
Capital expenditure decreased by 15 per cent to R59 million (US$9 million) from 
R69 million (US$12 million) in the June quarter. The majority of this           
expenditure was at 3 shaft. The stoping and development build-up at 3 shaft is  
progressing well and in line with expectations.                                 
Gold production is expected to increase slightly in the December                
quarter with a similar improvement expected in the working cost.                
South African Operations                                                        
In conclusion, production at the South African operations will be higher in the 
December quarter when compared with the September quarter.                      
International operations                                                        
  Ghana                                                                         
  Tarkwa                                                                        
September                 June       
                                                2004                 2004       
      Gold produced        - 000`ozs            124.8               123.1       
      Total cash costs     - US$/oz               248                251        
Gold production for the September quarter increased by 1,700 ounces to 124,800  
ounces for the Tarkwa operation. This was not in line with the guidance         
provided in the June quarter and was a disappointing result as mining and       
crushing operations performed very well. Ore tons mined was stable at 4.26      
million, while total tons mined increased to 20.8 million from 18.5 million in  
the June quarter, reflecting a planned increase in stripping ratio to 3.87.     
Tons treated through the crushing and leaching plant increased 5 per cent to    
4.1 million tons and recoverable gold stacked increased by a similar margin to  
137,000 ounces. This occurred despite a planned decrease in head grade to the   
heap leach plant from 1.44 grams per ton to 1.33 grams per ton, which was       
offset by an increase in the expected dissolution of the ores.                  
The decrease in head grade treated reflects a planned move to lower grades in   
the open pits, which are now being planned at a US$350 per ounce gold price,    
and also the stockpiling of high grades ores ahead of the new CIL plant.        
Gold in process increased by some 13,000 ounces during the quarter              
- with 10,000 ounces of this occurring on the south leach pads. This            
increase is due to:                                                             
 a move to higher lifts on both the north and south pads;                       
 the stacking of some high clay ores in the south, the presence of which        
 have previously been associated with significant GIP increases; and            
the configuration of the new leach pads in the south which are valley fill      
style versus the traditional flat base bed design. The valley fill tends to     
have fewer solution offtake points than the other design and can increase       
solution hold-up volumes.                                                       
A very smooth transition from contract mining to owner mining took place during 
the quarter, with the contractor withdrawing most of its mining equipment in    
July and the remainder at the end of August.                                    
The performance of the owner mining fleet is in line with expectations.         
Operating costs at US$31 million including gold in process                      
adjustments, were the same as the previous quarter despite the 2.3              
million ton increase in total mining volumes. Operating costs per ton           
treated were US$8.36 per ton against US$8.63 per ton in the June                
quarter. This reflects the reduction in mining costs as a result of the         
conversion to owner mining. Total cash costs decreased slightly to              
US$248 per ounce for the quarter reflecting the increase in gold                
production and lower unit operating costs, but does not yet reflect the         
full benefit from owner mining, as parts of the contract fleet operated         
for much of this quarter and some transition costs were experienced.            
The net result was a slight increase in operating profit from US$18             
million in the previous quarter to US$19 million in the current quarter.        
Capital expenditure decreased from US$65 million in the previous                
quarter to US$30 million in the September quarter as a result of the            
majority of the mining fleet being paid for in previous quarters and the        
construction work on the CIL plant nearing completion.                          
Gold production is expected to increase in the December quarter as a result of  
the commissioning of the CIL plant. The gold produced from                      
the heap leach operation is expected to increase slightly from the              
September levels, subject to gold in process movements, which                   
remain difficult to predict. Total cash costs are expected to decline in        
the December quarter as the full benefit of owner mining are                    
experienced but will be offset to a degree by the costs of the commissioning    
of the CIL.                                                                     
Damang                                                                          
                                       September                June            
                                            2004                2004            
 Gold produced        - 000`ozs              69.1                82.5           
Total cash costs     - US$/oz                238                 205           
Gold production for the quarter declined from 82,500 ounces to 69,100 ounces as 
predicted. This reflects a decrease of 4 per cent in mill throughput to 1.34    
million tons due to a mill shut down, as well as a 14 per cent decline in head  
grade from 2.1 grams per ton to 1.8 grams per ton. The head grade decline       
reflects the ongoing decline in the availability of high grade ores from the    
mature Damang pit. Total tons mined decreased by 25 per cent to 2.7 million     
tons, with the stripping ratio reducing from 1.71 to 1.18.                      
Operating costs decreased from US$17 million to US$15 million, reflecting the   
lower production levels and as a result cost per ton milled decreased from      
US$12.24 to US$11.33 per ton quarter on quarter. Total cash costs increased     
from US$205 to US$238, a function of the reduced gold production and also       
reflects a US$892,000 GIP charge (June US$473,000 credit) reflecting            
consumption of high grade stockpiles. Operating profit reduced from US$16       
million to US$11 million in the September quarter in line with the lower gold   
production.                                                                     
Capital expenditure incurred during the quarter was US$2 million, mainly on the 
exploration project aimed at extending the life of the Damang pit.              
Gold production is expected to be slightly lower again in the December quarter  
with the expected reduction in high grade sources of ore from the Damang pit.   
There will be a concomitant effect on unit costs.                               
Australia                                                                       
St Ives                                                                         
                                         September                June          
2004                2004          
 Gold produced          - 000`ozs            123.2               143.6          
 Total cash costs       - A$/oz                420                 422          
                        - US$/oz               297                 304          
Gold production for the quarter decreased 14 per cent to 123,200 ounces when    
compared to 143,600 ounces produced in the June quarter. The reduction was      
entirely due to the scheduled cessation of the toll treatment campaign, which   
ended on 30 June, which had contributed some 28,000 ounces in that period.      
Total mining operations produced some 1.76 million tons of ore and total        
treatment was only 1.35 million tons, reflecting the planned stock piling of    
ores ahead of the new CIP plant, which is due to be commissioned in the         
December quarter.                                                               
During the quarter, open pit mining operations performed well, mining a total   
of 7.7 million tons of ore and waste at an average strip ratio of               
6.4 (June: 6.7). The underground operations also performed to expectation with  
the ramp-up of the new Argo and East Repulse mines continuing such that ore     
production from total underground sources increased 10 per cent to some         
572,000 tons compared to the June quarter.                                      
Total cash costs, which include gold in process inventory adjustments,          
decreased marginally from A$422 per ounce (US$304 per ounce) to A$420 per ounce 
(US$297 per ounce). This was as a result of the cessation of the more expensive 
toll treatment programme and improvement in the cost performance of the new     
underground mines.                                                              
Operating profit at St. Ives of A$22 million (R98 million) increased marginally 
when compared with the A$21 million (R99 million) of the June quarter,          
reflecting the increase in the realised price of gold from A$556 in the June    
quarter to A$563 in the September quarter, together with the slight reduction   
in unit costs.                                                                  
Capital expenditure for the September quarter amounted to A$73 million (R330    
million) compared with A$75 million (R284 million) in the June quarter. The     
majority of this expenditure was incurred on the mill optimisation project (see 
St Ives Expansion Project for more detail), and continuing expenditure at Mars  
open pit on stripping, together with development works at East Repulse and Argo 
underground mines.                                                              
With commissioning of the new mill scheduled for late December, no significant  
impact on production is forecast until the March quarter.                       
Production for the December quarter is therefore expected to equal or only      
slightly exceed that of the current quarter, with cash costs continuing to      
improve slowly.                                                                 
  Agnew                                                                         
September                 June        
                                               2004                 2004        
   Gold produced        - 000`ozs               45.7                52.7        
   Total cash costs     - A$/oz                  338                 306        
- US$/oz                 239                221         
Gold produced at Agnew decreased from 52,700 ounces in the June quarter to      
45,700 ounces in the September quarter, in line with previous forecasts. The    
decrease resulted from a 5 per cent drop in mill tonnage, together with an 8    
per cent drop in average feed grade to the mill. The throughput decrease        
resulted from a planned shutdown, together with the current programme to        
rehabilitate the adsorption tanks. Grade from Crusader/Deliverer remnant mining 
is reducing as the mine approaches completion and gold produced decreased to    
some 7,000 ounces in the September quarter compared with 10,000 ounces in the   
June quarter. While mined volumes from the Kim underground mine increased       
slightly, gold production fell from 37,000 ounces in the June quarter to 35,000 
ounces in the September quarter, recognising the extraordinary grades seen in   
that period. The low grade stockpiles contributed a further 6,000 ounces to     
mill feed.                                                                      
Total cash costs, which includes gold in process inventory adjustments, rose    
from A$306 per ounce (US$221 per ounce) in the June quarter to A$338 per ounce  
(US$239 per ounce) in the September quarter, in line with the lower production. 
Unit operating costs remained under good control.                               
Agnew`s operating profit was A$10 million (R44 million), down from A$13 million 
(R61 million) in the June quarter, in line with the reduction in gold volumes.  
Capital expenditure increased to A$9 million (R40 million) from A$8 million     
(R24 million) the previous quarter. The main areas of expenditure included      
development at Kim underground (A$4 million), development of the new Main Lode  
access (A$1 million), rehabilitation of the adsorption tanks at the mill (A$1   
million) and prestrip of the new Songvang open pit (A$1 million).               
Gold production is forecast to increase slightly for the December quarter as a  
result of higher grades from the Kim underground mine, continued production     
from Crusader underground to at least mid- November and the start of the ore    
stream from the new Songvang open pit mine. Cash costs should remain stable.    
Quarter ended 30 September 2004                                                 
compared with quarter ended                                                     
30 September 2003                                                               
Attributable gold production was 3 per cent lower at 1,007,000 ounces in the    
September 2004 quarter compared with 1,038,000 ounces in the September 2003     
quarter. Production at the South African operations at 700,000 ounces was 1 per 
cent below the 711,000 ounces produced in the September 2003 quarter. At the    
international operations, gold production decreased 6 per cent mainly due to    
lower recoveries at Tarkwa.                                                     
Revenue decreased 8 per cent in rand terms (increased 7 per cent in US dollar   
terms) from R2,952 million (US$397 million) to R2,705 million (US$425 million). 
This was due to the lower gold production and a reduction in the rand gold      
price achieved fromR86,184 per kilogram (US$360 per ounce) in the September     
2003 quarter to R81,815 per kilogram (US$400 per ounce) in the September 2004   
quarter. Group operating costs in rand terms decreased marginally to R2,336     
million (US$367 million). At the South African operations operating costs were  
over 1 per cent below the September 2003 quarter at R1,664 million (US$262      
million), an excellent performance considering gold production was similar and  
taking into account the above average wage increases, as well as normal         
inflationary increases seen over the past year. The increase at the             
international operations amounted to 2 per cent, from R656 million (US$88       
million) to R672 million (US$106 million). However, if gold in process changes  
are taken into account, as well as the stronger rand, costs in US dollars were  
virtually unchanged at US$92 million. The average rand/dollar exchange rate     
strengthened from R7.44 in the September 2003 quarter to R6.36 in the current   
quarter, a 15 per cent change.                                                  
The effect of translating costs at the Australian operations was less at 8 per  
cent, with the average exchange rate strengthening from R4.89 to R4.50 in the   
September quarter.                                                              
Operating profit at R456 million (US$72 million) for the September 2004 quarter 
compares to R570 million (US$77 million) for the September 2003 quarter.        
Profit before tax amounted to R210 million (US$33 million) compared with R491   
million (US$66 million) in the September 2003 quarter.                          
This decrease was due to the lower operating profit described above as well as  
a R72 million increase in amortisation. This was partly offset by an increase   
on gains in financial instruments and an exceptional profit last year from the  
sale of mineral rights and investments.                                         
Earnings decreased from R421 million (US$57 million) in the September 2003      
quarter to R102 million (US$16 million) in the September 2004 quarter.          
Capital and de velopme n t                                                      
projects                                                                        
St Ives expansion project                                                       
The overall construction schedule for the St Ives new mill project remained on  
target. By the quarter end, all major mechanical packages (mainly equipment,    
piping, and steelwork) had been installed and were being closely followed by    
the HV switch room network, and associated cabling. The 36 ft. diameter single  
stage SAG mill and the associated gearless drive motor (GMD) had reached 90 per 
cent and 82 per cent completion respectively by the end of September. The       
132KV. main power supply to the new mill 20MVA transformer was connected on     
September 5, coinciding with a planned old mill shut down.                      
Commissioning procedures are well advanced, and initial commissioning of the    
crusher and reclaim circuit will commence in late October followed by the       
remainder of the plant through November- December.                              
Cumulative capital expenditure and commitments as at the end of the September   
quarter totalled A$106 million and A$116 million respectively. The overall      
project is expected to be completed within the approved budget of A$125 million 
and on track for commissioning in the December quarter.                         
Tarkwa expansion project                                                        
CIL Process Plant                                                               
During the quarter, this project continued to track ahead of schedule.          
The single stage semi-autogenous (SAG) mill was cold commissioned with ore      
being introduced at the end of the quarter. The mill was successfully           
commissioned in the first week of October, with the commissioning of the        
desorption facility and gold room expected during the middle of the quarter -   
when the first gold pour will occur.                                            
Currently the CIL p
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: