Thu 27 Jan 2005, 16:48 Quarterly Report 31 December 2004
Aquarius Platinum Limited - Quarterly Report 31 December 2004                   
Aquarius Platinum Limited                                                       
(Incorporated in Bermuda)                                                       
Registration number: EC26290                                                    
Share code on JSE: AQP        ISIN: BMG0440M1029                                
Share code on ASX: AQP.AX          ISIN: BMG0440M1029                           
Share code on LSE: AQP.L      ISIN: BMG0440M1029                                
Share code on US Over the counter market: AQPTY ISIN: US03840M2089              
(`Aquarius`)                                                                    
QUARTERLY REPORT 31 DECEMBER 2004                                               
Aquarius Group                                                                  
Highlights                                                                      
*    Group attributable production up 6% to 74,973 PGM ounces for the quarter to
     December 2004.  Record production at Kroondal, P&SA ahead of schedule      
*    Marikana production increases with a decrease in unit cash costs           
*    Improved Mimosa production rates, offset by a shortened reporting period,  
     resulting in a steady quarter on quarter output                            
Strategic                                                                       
*    BEE entry into AQPSA completed, R860 million subscription paid in October  
2004                                                                       
*    Cash / debt offset agreement entered into with Investec / ABSA.            
     Outstanding AQPSA debt balance reduced by R250 million to R112 million, the
     term debt facility remains intact                                          
*    Construction of the Everest mine commenced in October 2004, progressing on 
     schedule                                                                   
*    Chromite tailings retreatment project construction completed, first        
     production delivered to smelter on 21st January 2005                       
*    Aquarius becomes first foreign company to secondary list on the JSE in     
     terms of new foreign exchange control dispensation                         
Operations                                                                      
Kroondal                                                                        
*    Record quarter, production improves a further 6% to 71,523 PGM ounces      
     (Aquarius attributable 35,761 PGM ounces)                                  
*    Concentrator plant recoveries maintained at 80% as mill throughput         
     increased                                                                  
*    Improved safety performance, 12 month rolling DIIR of 0.96                 
*    Cash operating margin increases to 40%, as unit cash costs decrease to R2, 
     224 per PGM ounce                                                          
Marikana                                                                        
*    PGM production improves 11% to 24,019 PGM ounces                           
*    Concentrator plant recoveries increase to 54% from 45% in the previous     
     quarter                                                                    
*    Improved safety performance, DIIR for the quarter improves to 0.70 from    
0.80 in the previous quarter                                               
*    On mine cash costs show improvement to result in a modest positive cash    
     margin in the month of December                                            
Mimosa                                                                          
*    Production in line with previous quarter at 30,386 PGM ounces (Aquarius    
     attributable 15,193 PGM ounces) despite shortened reporting period to align
     Mimosa production cut-off dates with the rest of the Group                 
*    Improved safety performance, DIFR for quarter improves to 0.29 from 0.54   
*    Cash operating margin remains strong at 63%                                
*    Corporate tax rate in Zimbabwe reduced in December from 20% to 15%         
     backdated to January 2004                                                  
*    Mine management encouraged by its discussions with the Reserve Bank of     
Zimbabwe with respect to Mimosa`s foreign currency arrangements            
Projects                                                                        
Pooling and Sharing Agreement                                                   
*    Hot commissioning commencing March 2005, ahead of schedule                 
*    Underground tonnage build-up progressing ahead of plan                     
*    A 600,000 ton ore stockpile is anticipated to be built up ahead of the new 
     concentrator start-up                                                      
*    Construction of 4th decline shaft started in January 2005                  
Chromite Tailings Retreatment Project                                           
*    Construction completed in December                                         
*    First concentrate delivered to smelter on 21st January 2005                
Everest                                                                         
*    Project started construction in October 2004 with anticipated commissioning
     in December 2005                                                           
Production by Mine                                                              
PGMs (4E)    Quarter Ended                      Half Year ended                 
Mar      Jun      Sep      Dec     Dec      Dec                    
             2004     2004     2004     2004    2004     2003                   
Kroondal     60,032   59,830   67,486   71,523  139,009  117,764                
Marikana     17,847   20,220   21,694   24,019  45,713   49,109                 
Mimosa       28,621   28,807   30,608   30,386  60,994   61,962                 
Total        106,500  108,857  119,788  125,928 245,716  228,835                
Production by Mine attributable to Aquarius                                     
PGMs (4E)        Quarter Ended                      Half Year ended             
Attributable to                                                                 
Aquarius                                                                        
                 Mar     Jun      Sep      Dec      Dec      Dec                
                 2004    2004     2004     2004     2004     2003               
Kroondal         30,016  29,915   33,743   35,761   69,504   100,200            
                                                    (a)      (b)                
Marikana         17,847  20,220   21,694   24,019   45,713   49,109             
Mimosa           14,311  14,403   15,304   15,193   30,497   30,981             
TOTAL            62,174  64,538   70,741   74,973   145,714  180,290            
(a) includes full impact of the P&SA                                            
(b) includes 2 months of impact of the P&SA                                     
AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius 50.5%)                     
Kroondal Platinum Mine                                                          
Safety                                                                          
The DIIR recorded a good improvement to 0.38 for the quarter and thus lowered   
the 12  month rolling DIIR to 0.96. Regrettably a fatal accident occurred at the
mine on 20 November 2004 when a LHD operator sustained an injury to the head.   
The circumstances leading up to the accident are unclear and the matter is under
investigation by inspectors of the Department of Minerals and Energy.           
Processing                                                                      
*    Record 150,000 square meters mined leading to 1,067,000 tons ore hoisted   
     from underground, with a further 109,000 tons of opencast produced         
*    Record concentrator throughput of 878,000 tons achieved                    
*    71,523 PGM ounces produced (Aquarius attributable 35,761 PGM ounces)       
*    Closing surface stockpile at quarter end (ahead of the Christmas and New   
     Year holidays) at 503,000 tons                                             
Operations                                                                      
PGM production improved by 6% to 71,523 PGM ounces for the quarter.  878,000    
tons were processed at an improved head grade of 3.15 g/t (3.02 g/t for the     
previous quarter).  This achievement was commendable as the plant was not       
operated for a period in order to undertake a rod mill reline and a replacement 
of a failed ball mill bearing. Concentrator plant recoveries also improved to a 
record 80.35% in the December month.                                            
The PGM basket price increased to $700 per PGM ounce from $672 the previous     
quarter, with this improvement in Dollar price offset by a strengthening of the 
Rand average exchange rate to R6.11 per $ from R6.34 the previous quarter. The  
exchange rate ended the quarter stronger still at R5.62 per $.                  
The mining operations produced a record 1,176,000 tons for the quarter, with    
1,067,000 tons hoisted from underground and 109,000 tons mined from the open    
pits. The increased face length derived as a result of being able to develop    
down dip as part of the PSA project has had a marked positive effect on         
production.                                                                     
Cash costs at Kroondal were well controlled recording a decrease to R2, 224 per 
PGM ounce, down from R2,436 per PGM ounce, a 9% improvement.                    
Kroondal: Metal in concentrate produced (ounces)                                
Quarter      Pt      Pd      Rh      Au      PGMs    PGMs (4E)                  
ended                                        (4E)    attributable               
                                                     to Aquarius                
Dec 04       42,659  20,815  7,723   326     71,523  35,761*                    
Sep-04       40,389  19,471  7,285   341     67,486  33,743*                    
Jun-04       35,724  17,343  6,481   282     59,830  29,915*                    
Mar-04       36,283  17,243  6,233   273     60,032  30,016*                    
Dec-03       36,476  17,021  6,189   276     59,962  42,398                     
Sep-03       34,926  16,616  6,009   251     57,802  57,802                     
Note * Reflects full impact of the P&SA for an entire quarter.                  
Pooling & Sharing Agreement (P&SA)                                              
The P&SA expansion program is set to commission in the coming quarter.  At      
steady state production, the new concentrator is targeted to produce 250,000 PGM
ounces per annum, effectively doubling the Kroondal Mine`s annual output to     
505,000 PGM ounces per annum. Expansion of the underground mine at the Central, 
East and No 3 shafts progressed well through the quarter.  A total of 1,020     
meters of down-dip development has now been completed.  The underground mine is 
currently producing over 350,000 tons per month which places the build-up       
approximately 5 months ahead of project plan.                                   
Cold commissioning of the new concentrator will start in January 2005 with hot  
commissioning planned from March 2005, 3 months ahead of schedule.  A stockpile 
of over 600,000 tons is anticipated to be available for plant commissioning.    
First ounces from the new plant are expected during the final quarter (April to 
June 2005) of this financial year.                                              
The P&SA project`s capital expenditure commitments were R548 million at the end 
of the quarter with capital expenditure paid to date of R405 million.  AQPSA`s  
share of these commitments and expenditure is 50% of these amounts.             
Marikana Platinum Mine                                                          
Safety                                                                          
The DIIR for this quarter was 0.70 compared to 0.80 the previous quarter,       
ensuring that the mine retained the coveted NOSA 4 Star Platinum status.        
Mining                                                                          
*    Improved stripping ratio during the quarter has had a positive impact on   
     costs                                                                      
*    Second contractor introduced to supplement shortfall in contribution from  
first contractor                                                           
Processing                                                                      
*    364,000 tons processed during the quarter                                  
*    Concentrator plant recoveries at 54% up from 45% in the previous quarter   
*    24,019 PGM ounces, up 11% from the previous quarter                        
Operations                                                                      
PGM production improved by 11% to 24,019 PGM ounces for the quarter.  This was  
despite fewer tons being processed during the quarter, at 364,000 tons compared 
to 400,000 tons in the previous quarter. The increase in PGM ounces was the     
result of improved recoveries as deeper more competent ore was accessed in      
certain parts of the pit. Reflecting the access to competent ore, plant         
recoveries for the quarter improved to 54% from last quarter`s 45%.             
As a result of a lower stripping ratio and higher recovery levels cash costs per
PGM ounce reduced by 18% to R4,248, an improvement of R950 per PGM ounce        
compared to the previous quarter. This improvement is encouraging and has       
resulted in the mine breaking even in cash terms for the month of December.     
Further efficiencies will be achieved through the continuing implementation of  
the revised mining plan.  This is evident in the reduced 364,000 tons processed 
during the quarter at an improved head grade of 3.79 g/t (compared to 3.72 g/t  
for the previous quarter).                                                      
The Marikana PGM basket price increased marginally to $690 per PGM ounce from   
$685 in the previous quarter, with this improvement in Dollar price offset by a 
strengthening of the Rand average exchange rate to R6.11 per $ from R6.34 the   
previous quarter. The exchange rate closed the quarter stronger still at R5.62  
per $.                                                                          
Outlook                                                                         
While Aquarius is implementing the revised mining plan, discussions are being   
held with owners of adjacent mineral rights with a view to cooperation `across  
farm boundaries`.                                                               
Trial underground mining                                                        
Trial underground mining will commence in the current quarter. It is expected   
that underground mining will lead to a reduction in unit cash costs and create  
more flexibility for the exploitation of the ore body.                          
Contractor dispute with contractor Moolman Brothers                             
The arbitration date for the dispute relating to the Rise and Fall component of 
the mining contract has been set for April 2005.                                
Marikana: Metal in concentrate produced (ounces)                                
Quarter      Pt        Pd        Rh        Au        PGMs (4E)                  
ended                                                                           
Dec-04       15,808    6,214     1,800     197       24,019                     
Sep-04       13,937    6,039     1,509     209       21,694                     
Jun-04       13,591    5,086     1,369     174       20,220                     
Mar-04       11,950    4,484     1,272     141       17,847                     
Dec-03       16,275    6,843     1,892     219       25,229                     
Sep-03       15,958    6,185     1,529     208       23,880                     
Everest Platinum Mine                                                           
Safety                                                                          
No accidents were reported.                                                     
Progress                                                                        
Construction of Everest started in October 2004, following successful completion
and the receipt of funds from the BEE transaction.  The capital budget is R819  
million including a R33 million allowance for escalation.  Everest will mine and
process 3 million tons per annum of UG2 ore to produce 225,000 ounces of PGMs   
per annum at steady state. Commissioning is anticipated in December 2005, with  
full production to be attained in 2006.  Everest, with a UG2 reserve of 26.79   
million tonnes at 3.36 g/t (4E) containing 2.8 million ounces of PGMs, is the   
company`s third mining operation in South Africa.                               
Dowding Reynard and Associates (DRA), who managed the construction of the       
Kroondal, Marikana, and P&SA concentrators, have been appointed to execute the  
Everest project.  Preparatory engineering work undertaken throughout 2004 has   
allowed the project to be rapidly mobilised, with earthworks starting within the
week following funds receipt.  Construction activities during the quarter       
focussed on the process plant platform, excavation of the portal for the        
underground mining decline and general infrastructure.  Engineering, design and 
procurement activities are proceeding in parallel and project execution is on   
track for hot commissioning during December 2005.                               
Both opencast and underground mining contractors were appointed during the      
period.  The opencast mining contractor, MCC, will start mining activities      
during the first quarter of 2005. Shaft Sinkers, the underground contractor,    
will start the development of the decline during the second quarter of 2005.    
AQPSA mining personnel from the Kroondal Mine were seconded to Everest to enable
a transfer of knowledge and skills, and will be transferred to site during the  
next reporting period to manage the mining operations.                          
The identification and implementation of Social Upliftment and Sustainable      
Livelihood projects is ongoing.  Contractor recruitment of local labour is      
coordinated with the Department of Labour in Lydenburg, and has proved effective
with sixty local people employed during the period.  The Adult Basic Education  
and Training (ABET) facility, where community members attend twice-weekly       
classes, is ongoing and a project to supply water to the local primary school   
was initiated during the period.  Projects which will be initiated during the   
next period include a day care centre, the removal of alien plants, a           
nutritional feeding scheme and a catering project.                              
The transfer of land title to the local Phetla community under a settlement     
reached with the land restitution authorities continues. Under the terms of the 
agreement land required for the mine to operate will be leased back to AQPSA.   
MIMOSA INVESTMENTS (Aquarius 50%)                                               
Mimosa Platinum Mine                                                            
Safety                                                                          
The mine recorded a significant improvement in safety performance. During the   
quarter the DIFR was 0.29 compared to the last quarter`s figure of 0.54. The    
financial year to date DIFR stands at 0.40 and the rolling 12 months DIFR at    
0.49.                                                                           
Operations                                                                      
Mining operating days were reduced by six during the quarter as the monthly     
reporting date was brought forward from 28 to 22 December to accord with AQPSA. 
In addition, three operating days were lost to illegal industrial action called 
by the trade union organisation. Despite the loss of nine days, PGM production  
for the quarter was stable at 30,386 ounces, similar to previous quarter`s      
production of 30,608 ounces, reflecting an improvement in productivity.         
The Mimosa PGM basket price increased to $588 per PGM ounce from $571 in the    
previous quarter. Together with the contribution from base metals (approximately
27% of gross revenue) this generated sales revenue for the quarter of $20.1     
million, an increase of $0.1 million from the previous quarter at a gross cash  
margin (63%) of some $12.7 million.                                             
The Government of Zimbabwe announced a reduction in the rate of company tax for 
mining companies from 20% to 15% backdated to January 2004. This development is 
most welcome.                                                                   
Mining operations hoisted a ROM total of 326,000 dry metric tonnes. This        
compares with 329,000 dry metric tonnes in the previous quarter. Nine operating 
days were lost in the quarter. Tonnes milled during the period amounted to      
338,000 tonnes at an average plant feed grade of 3.65 PGM g/t compared with     
335,000 tonnes at 3.68 PGM g/t in the previous quarter. PGM production remained 
stable quarter on quarter with a slight decrease to 30,386 PGM ounces from      
30,608 ounces.                                                                  
Earlier reported problems encountered in the crushing circuit have been         
resolved. Satisfactory throughput is now being achieved enabling a steady state 
operation of the flotation circuits. The plant achieved above target metal      
recovery rates in respect of base metals and focus in the current quarter is on 
achieving similar results for PGMs.                                             
Operating Costs                                                                 
Exchange rates achieved were at the Reserve Bank of Zimbabwe (RBZ) auction floor
rates which averaged Z$5,900 per $. This level of exchange rate has not         
compensated for the inflation rate impact on operating costs at mine level.     
Consequently unit cash costs per PGM ounce for the quarter increased to $342 (or
$124 per PGM ounce after by-product credits) from $321 (or $111 per PGM ounce   
after by-product credits) for the previous quarter.  On a 12 month rolling basis
to December 2004, unit cash costs per PGM ounce were $319 (or $106 per PGM ounce
after by-product credits). The 15% FOB incentive granted by the RBZ was offset  
against operating costs as per normal practice.                                 
The expansion project was closed out at a capital cost of $41 million.          
Industrial Relations                                                            
Three operating days were lost to illegal industrial action called by the trade 
union to obtain concessions during national wage negotiations conducted by the  
Chamber of Mines. The combined effects of a harsh socio-economic environment and
an approaching parliamentary election will make managing the industrial         
relations environment in current quarter somewhat difficult.                    
PGM Sector Reforms                                                              
The Government of Zimbabwe, through the RBZ, has accorded the PGM sector a      
special status in order to stimulate growth of the Zimbabwe platinum industry   
and enhance Government`s understanding of the sector. Mimosa management has been
encouraged by its discussions with the Reserve Bank to achieve a `win-win       
situation` with respect to the management of foreign currency flows. A          
successful outcome of these discussions will lead to an evaluation of further   
growth opportunities on the mine.                                               
Mimosa : PGMs in Concentrate Produced (PGM ounces)                              
Quarter  Pt       Pd        Rh       Au        PGMs     PGMs (4E)               
ended                                         (4E)      attributable            
                                                        to Aquarius             
Dec-04   15,557   11,514    1,198    2,117    30,386    15,193                  
Sep-04   15,727   11,562    1,210    2,109    30,608    15,304                  
Jun-04   14,653   10,902    1,187    2,065    28,807    14,404                  
Mar-04   14,647   10,621    1,281    2,072    28,621    14,311                  
Dec-03   15,773   11,282    1,256    2,162    30,473    15,237                  
Sep-03   16,350   11,892    1,312    1,935    31,489    15,745                  
Mimosa : Base metals in Concentrate Produced (tons)                             
Quarter Ended Nickel             Copper          Cobalt                         
Dec-04        444                374             13                             
Sep-04        447                362             14                             
Jun-04        414                329             13                             
Mar-04        412                340             13                             
Dec-03        432                360             13                             
Sep-03        452                374             13                             
AQUARIUS PLATINUM (SA) (CORP SERVICES) (PTY) LIMITED (ASACS), (Aquarius 100%)   
Chromite Ore Tailings Retreatment Project (ASACS 50%)                           
Safety                                                                          
No accidents were reported during the quarter                                   
Project Development                                                             
Construction of the plant was completed during the quarter. Cold commissioning  
commenced during the first week in December and hot commissioning commenced 17th
December 2004.  First concentrate was delivered to the smelter on 21st January  
2005.                                                                           
CORPORATE MATTERS                                                               
Black Economic Empowerment (BEE)                                                
The BEE transaction announced to shareholders on 26th July 2004 and approved by 
shareholders in Special General Meeting on 11th October 2004 was formally       
concluded with the receipt of R860 million in cash by the Aquarius Group on the 
29th October 2004.                                                              
The transaction has two key components, the first of which is now completed.    
This saw the BEE consortium, led by Savannah Resources (Pty) Limited, subscribe 
for a 29.5% shareholding in the enlarged share capital of AQPSA. Concurrently   
Impala Platinum Holdings Limited (Impala) acquired an additional holding in     
AQPSA from Aquarius to increase their shareholding to 20% in AQPSA following the
dilution resulting from the issue of the new shares in AQPSA to the BEE         
consortium. At this time, the shareholdings in AQPSA are as follows:            
* 50.5% interest by AQP;                                                        
* 29.5% by the Savannah consortium; and                                         
* 20% held by Impala.                                                           
The consideration paid by Impala amounted to R71.5 million, which was settled by
the cession of R71.5 million of interest bearing loan account to Aquarius. At   
the time of the BEE transaction, AQPSA had an interest bearing loan of over R93 
million (both principal and accumulated interest) to Impala. Following cession  
of R71.5 million of the loan to Aquarius, AQPSA settled the outstanding balance 
of the loan in cash.                                                            
The final component of the transaction will in time and subject to the          
conditions detailed in the notice of meeting to shareholders of 17th September  
2004, see the Savannah consortium`s 29.5% holding in AQPSA be exchanged for     
24,599,542 new Aquarius shares. Following this exchange, Aquarius will hold 80% 
of AQPSA and Savannah consortium constituent members will hold approximately 23%
of the enlarged share capital of Aquarius.                                      
In terms of the BEE transaction agreements, Aquarius has invited the Savannah   
consortium to nominate a non-executive director to the Board of Director`s of   
Aquarius and to nominate three non-executive directors to the Board of          
Director`s of AQPSA.                                                            
JSE Securities Exchange South Africa                                            
Under revised exchange control regulations announced by South African Finance   
Minister, the Honourable Trevor Manuel in February 2004, Aquarius became the    
first foreign company to list its shares on the JSE. Listing on 8 December 2004,
to fulfil the company`s obligations to its empowerment partners, trade has been 
light to date. Steps to improve liquidity are in progress.                      
Cash balances / Debt                                                            
Aquarius Group cash balances at 31 December 2004 were $137 million, after the   
reduction in debt at AQPSA by R250 million in terms of an offset arrangement    
with Investec / ABSA.                                                           
Shortly before the close of the quarter, AQPSA signed an agreement with Investec
/ ABSA to create an innovative cash balance management offset mechanism in      
respect of its existing term debt facility. AQPSA is permitted to deposit its   
cash (up to the outstanding balance of the debt facility) in order to reduce its
interest expense for the period that the cash is on deposit with the banks. An  
amount of R250 million has been placed on deposit with the banks, thereby       
reducing the Investec/ABSA debt balance to R112 million. Funds will be re-      
advanced by the banks, without limitation at AQPSA`s request, up to the limits  
of the original facility. These funds are anticipated to remain on deposit until
the end of the calendar year.                                                   
Approval of long term incentive and bonus plan                                  
During the quarter the long term incentive plan and option plan and an amendment
to terms of existing options granted was approved by shareholders.              
Kroondal 100%                      Previou  +/- %     YTD      Prev     +/- %   
                          Current  s                           Corr             
Unit                        Quarter   6        6        12      
                          Quarter  Quarter  on        months   months   months  
                          Dec      Sept     Quarter   to Dec   to Dec   Ytd     
                          2004     2004               2004     2003             
Safety                                                                          
DIIR            Rate/200  0.38     0.94     (60)      0.66     1.52     (57)    
                ,000 man                                                        
                hours                                                           
Revenue         R`M       263      257      2         521      412      26      
Gross Revenue                                                                   
PGM basket      $/oz      700      672      4         686      550      25      
Price                                                                           
Gross cash      %         40       36       11        38       50       (24)    
margin                                                                          
Nickel Price    $/lb      6.38     6.36     0         6.37     4.94     29      
Copper Price    $/lb      1.40     1.29     9         1.35     0.86     56      
Ave R/$ rate              6.11     6.34     (4)       6.23     7.05     (12)    
Cash Costs                                                                      
Per ROM ton     R/ton     181      189      (4)       185      133      39      
                $/ton     30       30       (1)       30       19       56      
Per PGM ounce   R/oz      2,224    2,436    (9)       2,323    1,727    35      
                $/oz      364      384      (5)       373      245      52      
Per PGM ounce   R/oz      2,129    2,333    (9)       2,231    1,654    35      
after by                                                                        
product credit                                                                  
                $/oz      348      368      (5)       357      235      52      
Capital                                                                         
expenditure                                                                     
Current         R`000s    42.14    1,455    -         1,497    25,260   (94)    
                $`000s    6.90     229      -         236      3,586    (93)    
Expansion       R`000s    197,927  115,420  71        313,347  -        -       
                $`000s    32,394   18,199   78        50,593   -        -       
Mining                                                                          
Processed                                                                       
Underground     ROM Ton   792      803      (1)       1,595    1,379    16      
                `000                                                            
Open Pit        ROM Ton   86       65       32        151      152      (1)     
                `000                                                            
Total           ROM Ton   878      868      1         1,746    1,531    14      
                `000                                                            
Grade                                                                           
Plant Head      g/t       3.15     3.02     4         3.09     3.14     (2)     
Recoveries      %         80%      80%      (0)       80%      75%      7       
PGM Production                                                                  
Platinum        Ozs       42,659   40,389   6         83,048   71,402   16      
Palladium                                                                       
 Rhodium                    Ozs                                7,723            
 Gold                       Ozs     326       341       (5)     667      527    
Total                      Ozs     71,523    67,486    6       139,009  117,76 
                                                                         4      
 Base Metals Production                                                         
 Nickel                     Tonnes  67        63        6       130      98     
Copper                     Tonnes  30        27        11      57       46     
 Chromite         Tonnes    69      50        38        119     145      (18)   
                  (000)                                                         
 Marikana                           Previous  +/- %     YTD      Prev     +/- % 
Current                              Corr           
                  Unit              Quarter   Quarter   6        6        12    
                            Quarter Sept      on        months   months   months
                            Dec     2004      Quarter   to Sept  to Dec   Ytd   
2004                        2004     2003           
 Safety                                                                         
 DIIR             Rate/200  0.70    0.80      (13)      0.75     0.69     9     
                  ,000 man                                                      
hours                                                         
 Revenue          R`M       83      82        2         165      182      (9)   
 Gross Revenue                                                                  
 PGM basket       $/oz      690     685       1         688      579      19    
Price                                                                          
 Gross cash       %         (22)    (38)      (42)      (30)     2        n/a   
 margin                                                                         
 Nickel Price     $/lb      6.38    6.35      1         6.36     4.94     29    
Copper Price     $/lb      1.40    1.29      9         1.35     0.86     57    
 Ave R/$ rate               6.11    6.34      (4)       6.23     7.05     (12)  
 Cash Costs                                                                     
 Per ROM ton      R/ton     280     282       (0)       281      230      22    
$/ton     46      44        (5)       45       33       37    
 Per PGM ounce    R/oz      4,248   5,198     (18)      4,699    3,631    29    
                  $/oz      695     820       (15)      755      515      47    
 Per PGM ounce    R/oz      4,077   5,100     (20)      4,588    3,582    28    
after by                                                                       
 product credit                                                                 
                  $/oz      667     804       (17)      737      508      45    
 Capital                                                                        
expenditure                                                                    
 Current          R`000s    2,048   5,100     (60)      7,148    3,228    121   
                  $`000s    335     804       (58)      1,148    458      151   
 Expansion        R`000s    -       -                   -        15,826   -     
$`000s    -       -                   -        2,245    -     
 Processed                                                                      
 Underground      ROM Ton   -       -                   -        -        -     
                  `000                                                          
Open Pit         ROM Ton   364     400       (9)       764      774      (1)   
                  `000                                                          
 Total            ROM Ton   364     400       (9)       764      774      (1)   
                  `000                                                          
Grade                                                                          
 Plant Head       g/t       3.79    3.72      2         3.75     3.77     (0)   
 Recoveries       %         54%     45%       19        50%      52%      (4)   
 PGM Production                                                                 
Platinum         Ozs       15,808  13,937    13        29,745   32,233   (8)   
 Palladium        Ozs       6,214   6,039     3         12,253   13,029   (6)   
 Rhodium          Ozs       1,800   1,509     19        3,309    3,421    (3)   
 Gold             Ozs       197     209       (6)       406      426      (5)   
Total            Ozs       24,019  21,694    11        45,713   49,109   (7)   
 Base Metals                                                                    
 Production                                                                     
 Nickel           Tonnes    26      23        12        49       50       (1)   
Copper           Tonnes    13      13        2         26       29       (11)  
 Chromite         Tonnes    63      61        3         124      10       -     
                  (000)                                                         
 Mimosa              Current   Previous +/- %    YTD      Prev.   +/- %   Rollin
100%                                                     Corr                  
             Unit    Quarter   Quarter  Quarter  6        6       6       12    
                     Dec 2004  Sep 2004 on       months   months  months  months
                                        Quarter  to Dec   Dec     Ytd     to Dec
2004     2003            2004  
 Safety                                                                         
 DIFR        Rate/   0.29      0.54     (46)     0.40     0.45    (11)    0.49  
             200,00                                                             
0 man                                                              
             hours                                                              
 Revenue                                                                        
 Gross       R`M     20.1      20       1        40       34      17      78    
Revenue                                                                        
 PGM basket  $/oz    588       571      3        580      502     16      578   
 Price                                                                          
 Gross cash  %       63        62       2        62       70      (11)    62    
margin                                                                         
 Nickel      $/lb    6.17      6.06     2        6.11     5.31    15      6     
 Price                                                                          
 Copper      $/lb    1.20      0.97     24       1.08     0.80    35      1.10  
Price                                                                          
 Cash Costs                                                                     
 Per ROM     $/ton   31        29       7        29       19      53      29    
 ton                                                                            
Per PGM     $/oz    342       321      7        319      202     58      319   
 ounce                                                                          
 Per PGM     $/oz    124       111      12       105      20      425     106   
 ounce                                                                          
after by-                                                                      
 product                                                                        
 credit                                                                         
 Capital                                                                        
expenditur                                                                     
 e                                                                              
 Current     $`000s  3,504     5,650    (38)     9,154    4,195   118     14,246
 Expansion   $`000s  335       321      4        656      3,212   (80)    1,701 
Mining                                                                         
 Undergroun  ROM     326       329      (1)      656      665     (1)     1,320 
 d           Ton                                                                
             `000                                                               
Grade                                                                          
 Plant Head  g/t     3.65      3.68     (1)      3.66     3.75    (2)     3.71  
 Recoveries  %       76.6      77.0     (1)      76.9     76.0    1       75.6  
 PGM                                                                            
Production                                                                     
 Platinum    Ozs     15,557    15,727   (1)      31,284   32,123  (3)     60,584
 Palladium   Ozs     11,514    11,562   (0)      23,076   23,174  (0)     44,599
 Rhodium     Ozs     1,198     1,210    (1)      2,408    2,568   (6)     4,876 
Gold        Ozs     2,117     2,109    0        4,226    4,097   3       8,363 
 Total       Ozs     30,386    30,608   (1)      60,994   61,962  (2)     118,42
 Base                                                                           
 Metals                                                                         
Production                                                                     
 Nickel      Tonnes  444       447      (1)      891      883     1       1,716 
 Copper      Tonnes  374       362      3        736      734     0       1,405 
 Cobalt      Tonnes  13        14       (7)      26       27      (4)     52    
Aquarius Platinum Limited                                                      
 Board of Directors                                                             
 Nicholas Sibley                                                                
 Chairman                                                                       
Stuart Murray                                                                  
 Chief Executive Officer                                                        
 David Dix                                                                      
 Non-executive                                                                  
Edward Haslam                                                                  
 Non-executive                                                                  
 Catherine Markus                                                               
 Non-executive                                                                  
Sir William Purves                                                             
 Non-executive                                                                  
 Patrick Quirk                                                                  
 Non-executive                                                                  
Company Secretary                                                              
 Willi Boehm                                                                    
 Issued Capital                                                                 
 At 31 December 2004, the                                                       
Company had on issue:                                                          
 - 82,753,892 fully paid                                                        
 ordinary shares                                                                
 - 4,027,929 unlisted                                                           
options                                                                        
 Substantial Shareholders 31 December 2004      No. of Shares      Percentage   
 Impala Platinum Holdings Ltd                   7,141,966          8.63 %       
 J P Morgan Nominees Australia Limited          5,512,590          6.66 %       
ANZ Nominees Limited                           5,222,040          6.31 %       
 Chase Nominees Limited (FISL)                  4,684,626          5.66 %       
 Broker (ASX)                          Broker (LSE)                             
 Euroz Securities                      Numis Securities                         
Level 14, The Quadrant                Cheapside House                          
 1 William Street                      138 Cheapside                            
 Perth WA  6000                        London EC2V 6LH                          
 Telephone:     +61 8 9488 1400        Telephone:     +44 20 7776 1500          
Fax:           +61 8 9488 1478        Facsimile:     +44 20 7776 1550          
 Sponsor in South Africa (JSE)                                                  
 Nedbank Capital                                                                
 135 Rivonia Road                                                               
Sandown, Sandton, 2196                                                         
 Telephone:     +27 (0) 11 294 3601                                             
 Aquarius Platinum (South Africa)      Aquarius Platinum Corporate Services     
 (Proprietary) Ltd.                    Pty Ltd                                  
50.5% Owned                           100% Owned                               
 Registration Number 2000/000341/07    ACN 094 425 555                          
 (Incorporated in the Republic of      (Incorporated in Australia)              
 South Africa)                                                                  
The Great Wall Group Building         Level 4, Suite 5                         
 Block A, 1st Floor                    South Shore Centre                       
 5 Skeen Boulevard                     85 The Esplanade                         
 Bedfordview South Africa 2007         South Perth  Western Australia  6151     
P O Box 1282                          Telephone:     +61 (8) 9367 5211         
 Bedfordview South Africa 2009         Facsimile:     +61 (8) 9367 5233         
 Telephone:     +27 11 455 2050        Email: info@aquariusplatinum.com         
 Facsimile:     +27 11 455 2095                                                 
Email: info@aquariussa.co.za                                                   
 Management                                                                     
 Stuart Murray                                                                  
 Executive Chairman                                                             
Gert Ackerman                                                                  
 Managing Director                                                              
 Ayanda Khumalo                                                                 
 Finance Director                                                               
Gordon Ramsay                                                                  
 Projects Director                                                              
 Neil Collett                                                                   
 General Manager P&SA                                                           
Project                                                                        
 Gabriel de Wet                                                                 
 General Manager                                                                
 Engineering                                                                    
Graham Ferreira                                                                
 General Manager Finance                                                        
 Hugo Holl                                                                      
 General Manager Everest                                                        
Rob Mallinson                                                                  
 General Manager Marikana                                                       
 Phil Rooke                                                                     
 General Manager                                                                
Metallurgy & New Projects                                                      
 Hulme Scholes                                                                  
 General Manager                                                                
 Commercial & Legal /                                                           
Company Secretary                                                              
 Dave Starley                                                                   
 General Manager Kroondal                                                       
 Glossary                                                                       
A$                             Australian Dollar                               
 Aquarius                       Aquarius Platinum Limited                       
 ABET                           Adult Basic Education Training programme        
 APS                            Aquarius Platinum Corporate Services Pty Ltd    
AQPSA                          Aquarius Platinum (South Africa) Pty Ltd        
 ASACS                          Aquarius Platinum (SA) (Corporate Services)     
                                (Pty) Limited                                   
 DIFR                           Disabling Injury Frequency Rate - being the     
number of lost time injuries expressed as a rate
                                per 1,000,000 man-hours worked                  
 DIIR                           Disabling Injury Incidence Rate - being the     
                                number of lost time injuries expressed as a rate
per 200,000 man-hours worked                    
 EMPR                           Environmental Management Programme Report       
 Everest                        Everest Platinum Mine                           
 g/t                            Grams per tonne, measurement unit of grade (1   
g/t = 1 part per million)                       
 Great Dyke Reef                A PGE bearing layer within the Great Dyke       
                                Complex in Zimbabwe                             
 JORC code                      Australasian code for reporting of Mineral      
Resources and Ore Reserves                      
 JSE                            JSE Securities Exchange South Africa            
 Kroondal                       Kroondal Platinum Mine                          
 LHD                            Load Haul Dump machine                          
Marikana                       Marikana Platinum Mine                          
 Mimosa                         Mimosa Mining Company (Private) Limited or      
                                Mimosa Platinum Mine                            
 NOSA                           National Occupational Safety Association        
PGE(s)(6E)                     Platinum Group Elements.  Six metallic elements 
                                commonly found together which constitute the    
                                platinoids.  These are Pt (platinum), Pd        
                                (palladium), Rh (rhodium), Ru (ruthenium), Ir   
(iridium) and Os (osmium).                      
 PGM(s)                         Platinum Group Metals.  Aquarius reports the    
 (4E)                           composite grade comprising Pt+Pd+Rh+Au (gold),  
                                the Pt (platinum), Pd (palladium) and Rh        
(rhodium) being the most economic platinoids in 
                                the UG2 and Great Dyke reefs.                   
 P&SA                           Pooling & Sharing Agreement between AQPSA and   
                                RPM Ltd in respect of Kroondal                  
R                              South African Rand                              
 RK1                            Consortium comprising Aquarius Platinum (SA)    
                                (Corporate Services) (Pty) Limited (ASACS), GB  
                                Mining and Exploration (SA) (Pty) Limited (GB)  
and Sylvania South Africa (Pty) Ltd (SLVSA).    
 ROM                            Run of Mine.  The ore from mining which is fed  
                                to the concentrator plant.  This is usually a   
                                mixture of UG2 ore and waste.                   
RPM                            Rustenburg Platinum Mines Limited               
 TKO                            TKO Investment Holdings Limited                 
 Ton                            1 Metric tonne (1 000kg)                        
 UG2 Reef                       A PGE bearing chromite layer within the Critical
Zone of the Bushveld Complex in South Africa    
 $                              United States Dollar                            
 Z$                             Zimbabwe Dollar                                 
 Further information                                                            
please visit our website                                                       
 www.aquariusplatinum.com                                                       
 or                                                                             
 Contact:                                                                       
In Australia:                                                                  
 Willi Boehm                                                                    
 Aquarius Platinum                                                              
 Corporate Services Pty                                                         
Ltd                                                                            
 +61 (0) 8 9367 5211                                                            
 In United Kingdom:                                                             
 Nick Bias                                                                      
Buck-Bias Limited                                                              
 + 44 (0) 7887 920 530                                                          
 Alex Buck                                                                      
 Buck-Bias Limited                                                              
+44 (0) 7932 740 452                                                           
 In South Africa:                                                               
 Charmane Russell                                                               
 Russell & Associates                                                           
+27 (0) 11 880 3924/                                                           
 +27 (0) 82 376 2327
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: