Tue 8 Feb 2005, 11:05 Report For The Six Months Ended 31 December 2004
AQUARIUS PLATINUM LIMITED - - HALF YEARLY RESULTS                               
Aquarius Platinum Limited                                                       
(Incorporated in Bermuda)                                                       
Registration number: EC26290                                                    
Share code on JSE: AQP             ISIN: BMG0440M1029                           
Share code on ASX: AQP.AX          ISIN: BMG0440M1029                           
Share code on LSE: AQP.L           ISIN: BMG0440M1029                           
Share code on US Over the counter market: AQPTY ISIN: US03840M2089              
(`Aquarius`)                                                                    
HALF YEARLY RESULTS: 31 DECEMBER 2004                                           
NET PROFIT OF $6 MILLION AND INTERIM DIVIDEND DECLARED AT 3 US CENTS PER SHARE  
Highlights of the half year:                                                    
Operational                                                                     
* Mine production improved 7.5% to 245,716 PGM ounces (Aquarius attributable    
production declined to 145,714 PGM ounces due to the impact of the P&SA)        
* Kroondal Mine record production at 139,009 PGM ounces (Aquarius attributable  
69,504 PGM ounces)                                                              
* Kroondal P&SA makes substantial progress and ahead of schedule                
* Marikana Mine performance inhibited by excessive overburden removal,          
oxidised zones in orebody and poor reefing performance by mining contractor.    
Production declined to 45,713 PGM ounces                                        
* Mimosa Mine maintains consistent production levels at 60,994 PGM ounces       
(Aquarius attributable 30,497 PGM ounces)                                       
Financial                                                                       
* Revenues increased 1% to $98.8 million, despite lower attributable            
production but offset by 20% increase in PGM basket price and includes $4.1     
million on disposal of 2% of AQPSA (Note : The impact of the P&SA makes         
previous corresponding period comparisons difficult)                            
* Working costs rose in both South Africa and Zimbabwe due to inflation and     
appreciating currencies impact on $ reporting                                   
* Net profit after tax `cash basis` at $17.2 million                            
* Accounting profit (to IAS) at $6.0 million (7.25 cents per share) after       
amortisation and depreciation of $11.2 million                                  
* Profit from operations was $2.9 million and profit on sale of 2% of AQPSA     
equity to Impala Platinum Holdings Ltd was $3.1 million (pursuant to BEE        
transaction)                                                                    
* Consolidated cash balances at $137 million. Cash/debt offset agreement        
entered into with Investec/ABSA, with outstanding Investec / ABSA debt balance  
reduced by R250 million to R112 million, term debt facility remains intact      
* Interim dividend declared at a maintained 3 US cents per share                
Strategic                                                                       
* BEE entry into AQPSA completed, R860 million subscription paid during         
October 2004                                                                    
* Mine licence conversions in South Africa lodged with Department of Minerals   
and Energy                                                                      
* Aquarius first foreign company to secondary list on JSE under new foreign     
exchange control dispensation                                                   
Projects                                                                        
Pooling and Sharing Agreement                                                   
* Hot commissioning to start in March 2005, with first production in May,       
ahead of schedule                                                               
* Underground tonnage build-up progressing ahead of plan                        
* A 600,000 ton ore stockpile anticipated to be built up ahead of new           
concentrator start-up                                                           
* Construction of 4th decline shaft commenced in January 2005                   
Chromite Tailings Retreatment Project                                           
* Construction completed in December with first concentrate shipped in January  
2005                                                                            
* Low cost innovative new ounces, while furthering sound environmental          
practices                                                                       
Everest                                                                         
* Project commenced construction during October 2004 with anticipated           
commissioning in December 2005                                                  
Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said, `The   
first six months of the financial year are characterised by the success of the  
Kroondal operation, ongoing achievement at Mimosa, and a disappointing          
performance at Marikana. Kroondal has lifted to a new level and the P&SA is     
poised to deliver 3 months early. Mimosa has become a proven performer despite  
the economic challenges faced by its management in Zimbabwe. The uncertainty    
created by the foreign currency initiatives in Zimbabwe did damage sentiment    
towards the company but mine management continues to engage the Zimbabwean      
authorities and I am sure a satisfactory outcome will prevail in respect of     
foreign currency management.                                                    
Undoubtedly, the highlight for the period has been the successful execution of  
the BEE transaction with the Savannah Consortium. The transaction is proof      
that great BEE deals can be done without damaging shareholder interests. The    
cash raised is being put to good use to build the Everest Mine, which started   
construction in October. Everest is, however, only one of our projects. The     
P&SA at Kroondal is progressing very well with mine and plant some three        
months ahead of schedule and hot commissioning anticipated in March 2005. The   
Chromite Ore Tailings Retreatment operation completed construction in December  
and delivered its first concentrate in January 2005.                            
While our production profile is entering a new phase and offers excellent       
growth from a broader range of assets, the new projects also demonstrate our    
innovative approach to common-sense deal making. It is in this manner, with     
our BEE partners, that we will continue to look for opportunities to grow       
Aquarius even further`.                                                         
Financial results 31 December 2004                                              
Aquarius announces consolidated earnings for the half year to 31 December 2004  
of $6.0 million (7.25 cents per share).  Comparisons with the previous          
corresponding period 2003 are not meaningful due to the impact of the P&SA.     
Profit on a `cash basis` was $17.2 million.                                     
The Directors have declared an interim dividend of 3 cents per share (2003: 3   
cents per share) payable on 23 March 2005 to shareholders registered on 2       
March 2005.                                                                     
Revenue (PGM sales, interest, plus asset disposal) for the half year to         
December 2004, was up 1% to $98.8 million.                                      
Depreciation increased from $6.5 million to $8.6 million. This increase is due  
to capital expenditure on the respective development and expansions at          
Kroondal, Marikana and Mimosa plus accelerated write off of the life of mine    
of the Marikana open pit. Amortisation arising from the fair value uplift       
remained constant at $2.6 million. Net finance charges for the period were      
$2.8 million, comprising $3.4 million in interest income and $6.2 million       
interest expense.                                                               
Net profit for the period of $6 million, included a profit from operations of   
$2.9 million and profit of $3.1 million on the sale of 2% of AQPSA equity       
following the BEE transaction to Impala Platinum Holdings Limited.              
The Group`s operating mines (with the exception of Marikana which operated at   
a loss) performed well during the period under difficult economic conditions    
which saw the Rand strengthening further against the $. The Mimosa result was   
impacted by an exchange rate mechanism introduced by the Reserve Bank of        
Zimbabwe that did not reflect the hyper-inflationary conditions in the          
country. This caused operating costs to be affected adversely. Although         
operating conditions in Zimbabwe remain challenging, the company continues to   
operate successfully. In December 2004, the government of Zimbabwe announced a  
welcomed reduction in the company tax rate to 15% from 20%.                     
Cash costs at Kroondal for the half year were R2,323 per PGM ounce. These       
costs include additional costs that were attributable to the development of     
the P&SA. On an adjusted basis (after allowing for the change in amortisation   
policy announced a year ago, and P&SA developments costs) cash costs for the    
half year ended December 2004 were R1,819 per PGM ounce, a credible 5%          
increase compared to the 6 months ended December 2003.                          
The table below outlines reconciles these costs.                                
6        6        Variance                   
                                   months   months                              
                                   Dec      Dec                                 
                                   2004     2003                                
Cash costs                      R2,323   R1,727   (R596)                     
   Impact of change in             (R197)   -        R197                       
   amortisation policy                                                          
   P&SA decline development        (R267)   -        R267                       
Grade dilution due to decline   (R40)    -        (R40)                      
   development                                                                  
   Cash costs after adjustments    R1,819   R1,727   (R92)                      
Construction of the new 250,000 tons per month P&SA concentrator is on          
schedule to hot commission by March 2005. On completion of the new              
concentrator, Kroondal will produce approximately 505,000 PGM ounces per        
annum, of which Aquarius` share will be 50%.                                    
Marikana has underperformed during the half year and was impacted by the        
incidence of internal waste diluting the head grade, the impact of more         
oxidised ore on recoveries and a greater overburden strip than anticipated.     
Poor contractor performance on extracting the reef tons attributable to the     
overburden stripped has been a significant issue. Consequently, grades and      
recoveries were adversely affected contributing to the lower than expected PGM  
ounces produced during the half year of 45,713 PGM ounces and high cash costs   
PGM ounce of R4,699. The result is disappointing and has eroded what was a      
positive contribution from our other operations.  An encouraging yet modest     
cash break-even in December 2004 shows signs of a sustainable improvement at    
Marikana, and a cash profit is envisaged to continue for the rest of the        
financial year at current Rand: $ exchange rates and metal prices.              
Production                                                                      
Total mine production increased 7.5% to 245,716 PGM ounces. Attributable group  
production for the half year was 145,714 PGM ounces. It is forecast that the    
production profile will continue to increase, though at a higher rate, as new   
production from the Kroondal P&SA, the Chromite Tailings Retreatment            
operation, and improvements at the Marikana impact total production in the      
coming months.                                                                  
IncIuding the impact of the P&SA, the production for this half year was 16,881  
PGM ounces ahead (245,716 PGM ounces to December 2004 compared to 228,835 PGM   
ounces to December 2003).                                                       
Production by Mine and Production by Mine attributable to Aquarius              
PGMs (4E)   Production By Mine      Production attributable                     
                                    to Aquarius                                 
Half Year   Half Year   Half Year    Half Year                      
            ended Dec   ended Dec   ended Dec    ended Dec                      
            2004        2003        2004         2003                           
Kroondal    139,009     117,764     69,504       100,200                        
Marikana    45,713      49,109      45,713       49,109                         
Mimosa      60,994      61,962      30,497       30,981                         
Total       245,716     228,835     145,714      180,290                        
Foreign Exchange                                                                
The Rand appreciated 10% against the US Dollar over the 6 months to December    
2004 ending at R5.62 per $. Encouragingly the exchange rate has marginally      
depreciated into 2005 with renewed dollar strength, concurrent with a           
continued strengthening of the PGM basket price.                                
Platinum Group Metal Prices                                                     
The prices for our commodities showed healthy gains over the period, with       
average PGM basket price (platinum, palladium, rhodium and gold) increasing     
20% to $651 per PGM ounce compared to the half year to December 2003. The PGM   
basket price has continued to strengthen further, as strong underlying demand   
for platinum in both autocatalysts and jewellery suggests that the supply       
deficit will continue as new operations fail to come on stream under a strong   
Rand Dollar environment. PGMs unlike gold are influenced less by the $, and     
behave more inline with underlying demand for which the outlook continues to    
be robust.                                                                      
At Mimosa operation, where palladium is a more significant component of the     
basket, the basket price averaged $580 per PGM ounce, a 16% increase over the   
half year to December 2003. The mine continued to benefit from increasing by-   
product credit prices for nickel, copper and cobalt.                            
Financials                                                                      
Aquarius Platinum Limited                                                       
Consolidated Income Statement                                                   
For the Half Year ended 31 December 2004                                        
$`000                                                                           
Audit reviewed                                                                  
Half Year Ended       Year          
                                                                  Ended         
                                            31/12/04   31/12/03   30/6/04       
                                   Note:                                        
Revenue                            (i)      98,762     97,518     194,850       
Foreign exchange loss on sales     (ii)     (1,694)    (7,430)    (2,975)       
Cost of sales                      (iii)    (83,088)   (62,816)   (125,420)     
Gross profit                                13,980     27,272     66,455        
Amortisation of fair value uplift  (iv)     (2,599)    (2,703)    (4,951)       
of mineral properties                                                           
Gross profit after amortisation             11,381     24,569     61,504        
of fair value uplift                                                            
Admin & operating costs            (v)      (3,389)    (3,410)    (8,619)       
Finance costs                      (vi)     (6,185)    (4,847)    (10,661)      
Foreign exchange gains/(losses)    (vii)    2,395      3,250      (3,094)       
Profit before tax                           4,202      19,562     39,130        
Income tax expense                 (viii)   1,113      (3,811)    (5,674)       
Profit after tax                            5,315      15,751     33,456        
Minority interest                  (ix)     687        (1,271)    (4,752)       
Net profit                                  6,002      14,480     28,704        
Earnings per share (basic -                 7.25       17.9       35.08         
cents)                                                                          
Notes on the Consolidated Income Statement                                      
(i)   Sales revenue in line with previous period, despite lower attributable    
production, offset by 20% increase in PGM basket price and includes $4.1  
      million on disposal of 2% of AQPSA                                        
(ii)  Reflects effects of adjusting revenue recorded at time of production at   
      Kroondal and Marikana to cash received at the end of the four month       
pipeline                                                                  
(iii) Cost of sales are higher due to appreciating Rand, up 13% compared to     
      the previous corresponding period, December 2003, and increased costs     
      incurred at the Marikana mine and a static Zimbabwe dollar - despite      
hyper inflationary conditions in Zimbabwe                                 
(iv)  Relates to amortisation of purchased goodwill associated with the         
      Kroondal, Marikana and Mimosa mines                                       
(v)   Relates to administration costs of the Aquarius Group                     
(vi)  Finance costs were higher due to short term loans to fund Mimosa`s        
      working capital                                                           
(vii) Reflects foreign exchange movements on net monetary assets                
(viii)Income tax expense for the period includes tax credit attributable to     
reduction in tax rate in Zimbabwe from 20% to 15%                         
(ix)  Minority interests reflect 49.5% outside equity interest of Impala        
      Platinum Holdings Limited (Implats) and the Savannah Consortium (SavCon)  
      in AQPSA                                                                  
Aquarius Platinum Limited                                                       
Consolidated Cash Flow Statement                                                
Half year ended 31 December 2004 $`000                                          
Audit Reviewed                                                                  
Half year ended         Year ended        
                                      31/12/04    31/12/03    30/06/04          
                            Note:                                               
Net operating cash inflow   (i)       9,878       31,827      54,365            
Net investing cash outflow  (ii)      (36,847)    (10,761)    (10,380)          
Net financing cash outflow  (iii)     76,445      16,814      15,786            
Net increase in cash held             49,476      37,880      59,771            
Opening cash balance                  77,942      16,996      16,996            
Exchange rate movement on   (iv)      9,132       182         1,175             
cash                                                                            
Closing cash balance                  136,550     55,058      77,942            
Notes on the December `04 Consolidated Cash Flow Statement                      
(i)    Net operating cash flow includes $77.4 million inflow from operations    
       and $2.2 million net finance costs                                       
(ii)   Reflects payments for mine development and development costs $40.8       
       million less net proceeds on sale of investment to SavCon of $4.0        
million                                                                  
(iii)  Reflects proceeds from issue of shares by AQPSA $33.52 million,          
       proceeds from SavCon shareholder loan 97.4 million, debt offset of       
       Investec/ABSA facility of  $53.2 million, proceeds from repayment of     
share plan loans $1.1 million and payment of dividends of $2.5 million   
(iv)   Reflects impact of a strengthening Rand against the US dollar for the    
       period                                                                   
Aquarius Platinum Limited                                                       
Consolidated Balance Sheet                                                      
At 31 December 2004 $`000                                                       
Audit Reviewed                                                                  
                                           Half year ended         Year ended   
Note:    31/12/04    31/12/03    30/06/04     
Assets                                                                          
Cash assets                                136,746     55,058      77,942       
Current receivables               (i)      34,162      29,765      23,262       
Other current assets              (ii)     20,192      10,371      10,736       
Non-current receivables           (iii)    3,728       4,691       4,627        
Mining assets                     (iv)     409,619     327,267     356,641      
Other non-current assets                   512         21          18           
Total assets                               604,959     427,173     473,226      
Liabilities                                                                     
Current liabilities               (v)      58,821      37,650      41,766       
Non-current payables              (vi)     176,697     56,224      59,600       
Non-current interest-bearing      (vii)    18,519      63,859      62,716       
liabilities                                                                     
Other non-current liabilities     (viii)   82,584      55,623      74,947       
Total Liabilities                          336,621     213,356     239,029      
Net assets/(liabilities)                   268,338     213,817     234,197      
Equity                                                                          
Parent entity interest                     233,907     208,494     224,975      
Minority interest                          34,431      5,323       9,222        
Total Equity                               268,338     213,817     234,197      
Notes on the December 04 Consolidated Balance Sheet                             
(i)   Increase relates to net movement in trade debtors and pipeline finance.   
(ii)  Relates to ore stockpiles, consumables and PGM concentrate inventory,     
increase related to ore stockpile build-up prior to commissioning of new  
      PSA plant.                                                                
(iii) Reduction reflects Aquarius share plan loans repaid                       
(iv)  Increase in mining assets relates to costs of new Kroondal PSA plant,     
development costs of Everest and foreign exchanges variances on Rand      
      mining assets                                                             
(v)   Includes current portion of Investec loan ($20.4 million), tax payable    
      ($9.2 million) and creditors ($29.2 million). Balances include impact of  
the R250 million debt offset against the Investec/ABSA facility.          
(vi)  Includes deferred sale amount on BEE transaction ($11.5 million) and      
      long-term non-interest bearing shareholder debt in AQPSA owing to SavCon  
      ($73.9 million) and Impala (91.3 million)                                 
(vii) Relates long term interest bearing shareholder loans in AQPSA of $18.0    
      million and other loans of $0.5 million.                                  
(v111)Reflects deferred tax liabilities $57.5 million, provision for closure    
      costs $25.1 million                                                       
On Mine Financial Performance                                                   
                                  Kroondal      Marikana        Mimosa 50%      
PGM ounces (attributable)         69,504        45,713          30,497          
Revenue (net of FX variance on    40,860        25,907          22,705          
sales)                                                                          
Cash costs                        (25,466)      (32,754)        (10,765)        
Gross margin                      15,394        (6,847)         11,940          
Administration                    (1,503)       (1,622)         (2,359)         
Foreign currency gain/(loss)      (233)         (445)           898             
EBITDA                            13,658        (8,914)         10,479          
Amortisation                      (3,644)       (6,435)         (1,092)         
Finance charges                   278           (2,417)         (2,328)         
Profit/(loss) before tax          10,292        (17,766)        7,059           
Tax Expense                       (1,355)       2,766           (297)           
Profit/(loss) before tax          8,937         (15,000)        6,762           
Operations                                                                      
Kroondal Platinum Mine                                                          
Safety                                                                          
The DIIR recorded a good improvement to 0.66 for the half year.  Regrettably a  
fatal accident occurred at the mine on 20 November 2004 when a LHD operator     
sustained an injury to the head. The circumstances leading up to the accident   
are unclear and the matter is under investigation by inspectors of the          
Department of Minerals and Energy.                                              
Processing                                                                      
* 1,595,000 ROM tons hoisted from underground with a further 151,000 tons of    
  opencast                                                                      
* 139,009 PGM ounces produced (Aquarius attributable 69,504 PGM ounces)         
* Closing surface stockpile at quarter end (ahead of the Christmas and New      
Year holidays) at 503,000 tons                                                
Operations                                                                      
PGM production improved by 18% to 139,009 PGM ounces for the half year to       
December 2004.                                                                  
The PGM basket price increased to $686 per PGM ounce, with this improvement in  
$ price offset by a strengthening of the Rand : $ average exchange rate.        
The increased face length derived as a result of being able to develop down     
dip as part of the PSA project has had a marked positive effect on production.  
1,746,000 ROM tons were processed at a slightly lower head grade of 3.09 g/t.   
This achievement was commendable as the plant did not operate for a period in   
order to undertake a rod mill reline and a replacement of a failed ball mill    
bearing. Concentrator plant recoveries also improved to a record 80.35% in the  
December month.                                                                 
Cash costs at Kroondal for the half year were R2,323 per PGM ounce. These       
costs include additional costs that were attributable to the development of     
the P&SA, On an adjusted basis (after allowing for the change in amortisation   
policy announced a year ago, and P&SA developments costs) cash costs for the    
half year ended December 2004 were R1,819 per PGM ounce, a credible 5%          
increase compared to the 6 months ended December 2003.                          
P&SA development at Kroondal                                                    
The P&SA expansion program is set to commission in the coming quarter. At       
steady state production, the new concentrator is targeted to produce 250,000    
PGM ounces per annum, effectively doubling the Kroondal Mine`s annual output    
to 505,000 PGM ounces per annum. Expansion of the underground mine at the       
Central, East and No 3 shafts progressed well through the period. A total of    
1,020 meters of down-dip development has now been completed. The underground    
mine is currently producing over 350,000 tons per month which places the build- 
up approximately 5 months ahead of project plan.                                
Cold commissioning of the new concentrator will start in January 2005 with hot  
commissioning planned from March 2005, 3 months ahead of schedule. A stockpile  
of over 600,000 tons is anticipated to be available for plant commissioning.    
First ounces from the new plant are expected during the final quarter (April    
to June 2005) of this financial year.                                           
The P&SA project`s capital expenditure commitments to 31 December 2004 were     
R548 million with capital expenditure paid to date of R405 million. AQPSA`s     
share of these commitments and expenditure is 50% of these amounts.             
Marikana Platinum Mine                                                          
Safety                                                                          
The DIIR for the half year was 0.75 for the period, ensuring that the mine      
retained the coveted NOSA 4 Star Platinum status.                               
Mining                                                                          
Improved stripping ratio during the quarter has had a positive impact on costs  
Second contractor introduced to supplement shortfall in contribution from       
Moolman Bros                                                                    
Processing                                                                      
* 764,000 tons processed during the period                                      
* Concentrator plant recoveries at 50%                                          
* 45,713 PGM ounces produced                                                    
Operations                                                                      
PGM production improved towards the end of the half year, despite fewer tons    
being processed. The improvements in the second quarter are the result of       
improved recoveries as deeper more competent ore was accessed in certain parts  
of the pit. Reflecting the access to competent ore, plant recoveries for the    
period were 50%.                                                                
As a result of a lower stripping ratio and higher recovery levels cash costs    
per PGM ounce also improved towards the end of the period, with the quarter to  
December 2004 reporting a reduction of 18% to R4,248 compared to the previous   
quarter. This improvement is encouraging and has resulted in the mine breaking  
even in cash terms for the month of December. Further efficiencies will be      
achieved through the continuing implementation of the revised mining plan,      
whereby reduced tonnage at an improved head grade is anticipated in the final   
half of the financial year.                                                     
The Marikana PGM basket price increased marginally to $688 per PGM ounce.       
Outlook                                                                         
While Aquarius is implementing the revised mining plan, discussions are being   
held with owners of adjacent mineral rights with a view to cooperation `across  
farm boundaries`.                                                               
Trial underground mining will commence in the current quarter. It is expected   
that underground mining will lead to a reduction in unit cash costs and create  
more flexibility for the exploitation of the ore body.                          
Contractor dispute with Moolman Brothers                                        
The arbitration date for the dispute relating to the Rise and Fall (foreign     
currency denominated) component of the mining contract has been set for April   
2005.                                                                           
Mimosa Mine (Aquarius 50%)                                                      
Safety                                                                          
The mine recorded a significant improvement in safety performance. During the   
half year the DIFR was 0.4. The financial year to date DIFR stands at 0.40 and  
the rolling 12 months DIFR at 0.49.                                             
Operations                                                                      
Mining operating days were reduced by six in December as the monthly reporting  
date was brought forward from 28 to 22 December to accord with AQPSA. In        
addition, three operating days were lost to illegal industrial action called    
by the trade union organisation. Despite the loss of nine days, PGM production  
for the 6 months was stable at 60,994 PGM ounces, similar to the previous       
corresponding half year, December 2003, production of 61,962 PGM ounces,        
reflecting an improvement in productivity. Mining operations hoisted a total    
of 656,000 ROM tons.                                                            
The Mimosa PGM basket price reported a steady increase to $588 per PGM ounce,   
aided by buoyant base metals prices.                                            
The Government of Zimbabwe announced a reduction in the rate of company tax     
for mining companies from 20% to 15% backdated to January 2004. This            
development is most welcome.                                                    
Operating Costs                                                                 
Exchange rates achieved were at the Reserve Bank of Zimbabwe (RBZ) auction      
floor rates which averaged Z$5,900 per $. This level of exchange rate has not   
compensated for the inflation rate impact on operating costs at mine level.     
Consequently unit cash costs per PGM ounce for the period increased to $319     
(or $105 per PGM ounce after by-product credits).  The 15% FOB incentive        
granted by the RBZ was offset against operating costs as per normal practice.   
The expansion project was completed at a capital cost of $41 million.           
Industrial Relations                                                            
Three operating days were lost to illegal industrial action called by the       
trade union to obtain concessions during national wage negotiations conducted   
by the Chamber of Mines. The combined effects of a harsh socio-economic         
environment and an approaching parliamentary election will make managing the    
industrial relations environment in current quarter somewhat difficult.         
PGM Sector Reforms                                                              
The Government of Zimbabwe, through the RBZ, has accorded the PGM sector a      
special status in order to stimulate growth of the Zimbabwe platinum industry   
and enhance Government`s understanding of the sector. Mimosa management has     
been encouraged by its discussions with the RBZ to achieve a `win-win           
situation` with respect to the management of foreign currency flows. A          
successful outcome of these discussions will lead to an evaluation of further   
growth opportunities on the mine.                                               
Chromite Ore Tailings Retreatment Operation (ASACS 50%)                         
Safety                                                                          
No accidents were reported during the period.                                   
Project Development                                                             
Construction of the plant was completed in December 2004. Cold commissioning    
commenced during the first week in December and hot commissioning commenced     
17th December 2004. First concentrate was delivered to the smelter on 21st      
January 2005.                                                                   
Everest Project                                                                 
Progress                                                                        
Construction of Everest started in October 2004, following the receipt of       
funds from the BEE transaction. The capital budget is R819 million including a  
R33 million allowance for escalation. Everest will mine and process 3 million   
tons per annum of UG2 ore to produce 225,000 ounces of PGMs per annum at        
steady state. Commissioning is anticipated in December 2005, with full          
production to be attained in 2006. Everest , with a UG2 reserve of 26.79        
million tonnes at 3.36 g/t (4E) containing 2.8 million ounces of PGMs, is the   
company`s third mining operation in South Africa.                               
Dowding Reynard and Associates (DRA), who managed the construction of the       
Kroondal, Marikana, and P&SA concentrators, have been appointed to execute the  
Everest project. Preparatory engineering work undertaken throughout 2004 has    
allowed the project to be rapidly mobilised, with earthworks starting within    
the week following funds receipt. Construction activities during the period     
focused on the process plant platform, excavation of the portal for the         
underground mining decline and general infrastructure. Engineering, design and  
procurement activities are proceeding in parallel and project execution is on   
track for hot commissioning during December 2005.                               
Both opencast and underground mining contractors were appointed during the      
period. The opencast mining contractor, MCC, will start mining activities       
during the first quarter of 2005. Shaft Sinkers, the underground contractor,    
will start the development of the decline during the second quarter of 2005.    
AQPSA mining personnel from the Kroondal Mine were seconded to Everest to       
enable a transfer of knowledge and skills, and will be transferred to site      
during the next reporting period to manage the mining operations.               
The identification and implementation of Social Upliftment and Sustainable      
Livelihood projects is ongoing. Contractor recruitment of local labour is       
coordinated with the Department of Labour in Lydenburg, and has proved          
effective with sixty local people employed during the period. The Adult Basic   
Education and Training (ABET) facility, where community members attend twice-   
weekly classes, is ongoing and a project to supply water to the local primary   
school was initiated during the period. Projects which will be initiated        
during the next period include a day care centre, the removal of alien plants,  
a nutritional feeding scheme and a catering project.                            
The transfer of land title to the local Phetla community under a settlement     
reached with the land restitution authorities continues. Under the terms of     
the agreement land required for the mine to operate will be leased back to      
AQPSA.                                                                          
Corporate                                                                       
Board of directors                                                              
Subsequent to the half year end, Mr Zwelakhe Sisulu was appointed to the Board  
of the Company on 4th February 2005. Mr Sisulu brings considerable experience   
with regard to the operating environment in Southern Africa.                    
Black Economic Empowerment (BEE)                                                
The BEE transaction announced to shareholders on 26th July 2004 and approved    
by shareholders in Special General Meeting on 11th October 2004 was formally    
concluded with the receipt of R860 million in cash by the Aquarius Group on     
the 29th October 2004.                                                          
The transaction has two key components, the first of which is now completed.    
This saw the BEE consortium, led by Savannah Resources (Pty) Limited,           
subscribe for a 29.5% shareholding in the enlarged share capital of AQPSA.      
Concurrently Impala Platinum Holdings Limited (Impala) acquired an additional   
holding in AQPSA from Aquarius to increase their shareholding to 20% in AQPSA   
following the dilution resulting from the issue of the new shares in AQPSA to   
the BEE consortium. At this time, the shareholdings in AQPSA are as follows:    
* 50.5% interest by AQP;                                                        
* 29.5% by the Savannah consortium; and                                         
* 20% held by Impala.                                                           
The consideration paid by Impala amounted to R71.5 million, which was settled   
by the cession of R71.5 million of interest bearing loan account to Aquarius.   
At the time of the BEE transaction, AQPSA had an interest bearing loan of over  
R93 million (both principal and accumulated interest) to Impala. Following      
cession of R71.5 million of the loan to Aquarius, AQPSA settled the             
outstanding balance of the loan in cash.                                        
The final component of the transaction will in time and subject to the          
conditions detailed in the notice of meeting to shareholders of 17th September  
2004, see the Savannah consortium`s 29.5% holding in AQPSA be exchanged for     
24,599,542 new Aquarius shares. Following this exchange, Aquarius will hold     
80% of AQPSA and Savannah consortium constituent members will hold              
approximately 23% of the enlarged share capital of Aquarius.                    
JSE Securities Exchange South Africa                                            
Under revised exchange control regulations announced by South African Finance   
Minister, the Honourable Trevor Manuel in February 2004, Aquarius became the    
first foreign company to list its shares on the JSE. Listing on 8 December      
2004, to fulfil the company`s obligations to its empowerment partners, trade    
has been light to date. Steps to improve liquidity are in progress.             
Cash balances and Interest bearing debt facilities                              
Aquarius Group consolidated cash balances  at 31 December 2004 were $137        
million, after the reduction in debt at AQPSA by R250 million in terms of an    
offset arrangement with Investec / ABSA.                                        
In December, AQPSA signed an agreement with Investec / ABSA to create an        
innovative cash balance management offset mechanism in respect of its existing  
term debt facility. AQPSA is permitted to deposit its cash (up to the           
outstanding balance of the debt facility) in order to reduce its interest       
expense for the period that the cash is on deposit with the banks. An amount    
of R250 million has been placed on deposit with the banks, thereby reducing     
the Investec/ABSA debt balance to R112 million. Funds will be re-advanced by    
the banks, without limitation at AQPSA`s request, up to the limits of the       
original facility. These funds are anticipated to remain on deposit until the   
end of the calendar year.                                                       
STATISTICAL INFORMATION:                                                        
                    Kroondal             Marikana            Mimosa             
Unit     6 months   6 months  6 months  6 months  6 months  6 months 
                    December   December  December  December  December  December 
                    2004       2003      2004      2003      2004      2003     
Safety                                                                          
DIIR       Rate/20  0.66       1.52      0.75      0.69      0.40      0.45     
           0,000                                                                
           man                                                                  
           hours                                                                
Revenue    Million  521        412       165       182       40        34       
Gross      s                                                                    
revenue                                                                         
PGM basket $/oz     686        550       688       579       580       502      
Price                                                                           
Gross cash          38         50        (30)      2         62        70       
margin                                                                          
Nickel     $/lb     6.37       4.94      6.36      4.94      6.11      5.31     
Price                                                                           
Copper     USCents  1.35       0.86      1.35      0.86      1.08      0.80     
Price      (USD)/l                                                              
           b                                                                    
Ave R/$             6.23       7.05      6.23      7.05      -         -        
rate                                                                            
Cash Costs                                                                      
Per ROM    R/ton    185        133       281       230       -         -        
ton                                                                             
           $/ton    30         19        45        33        29        19       
Per PGM    R/oz     2,323      1,727     4,699     3,631     -         -        
ounce                                                                           
$/oz     373        245       755       515       319       202      
Per PGM    R/oz     2,231      1,654     4,588     3,582     -         -        
ounce                                                                           
after by-                                                                       
product                                                                         
credit                                                                          
           $/oz     357        235       737       508       105       20       
Capital                                                                         
expenditur                                                                      
e                                                                               
Current    R        1,497      25,260    7,148     3,228     9,154     4,195    
100%       ``000s                                                               
$  `     236        3,586     1,148     458       -         -        
           000s                                                                 
Expansion  R        313,347    -         -         15,826    6,56      3,212    
100%       ``000s                                                               
$  `     50,593     -         -         2,245     -         -        
           000s                                                                 
Mining                                                                          
Processed                                                                       
Undergroun ROM ton  1,595      1,379     -         -         656       665      
d          ``000                                                                
Open Pit   ROM ton  151        152       764       774       -         -        
           ``000                                                                
Total      ROM ton  1,746      1,531     764       774       656       665      
           ``000                                                                
Grade                                                                           
Plant Head g/t      3.09       3.14      3.75      3.77      3.66      3.75     
Recoveries %        80%        75%       50%       52%       76.9      76.0     
PGM                                                                             
Production                                                                      
Platinum   Ozs      83,048     71,402    29,745    32,233    31,284    32,123   
Palladium  Ozs      40,286     33,637    12,253    13,029    23,076    23,174   
Rhodium    Ozs      15,008     12,198    3,309     3,421     2,408     2,568    
Gold       Ozs      667        527       406       426       4,226     4,097    
Total      Ozs      139,009    117,764   45,713    49,109    60.994    61,962   
Base                                                                            
Metals                                                                          
Production                                                                      
Nickel     Tons     130        98        49        50        891       883      
Copper     Tons     57         46        26        29        736       734      
Chromite   Tons     119        145       124       10        26        27       
(000)      (000)                                                                
  Data reflects 100% of operations.                                             
8 February 2005                                                                 
Aquarius Platinum Limited                                                       
Incorporated in Bermuda                                                         
Exempt company number 26290                                                     
Board of Directors                                                              
Nicholas Sibley     Non-executive Chairman                                      
Stuart Murray       Chief Executive Officer                                     
David Dix           Non-executive (appointed 31 March 2004)                     
Edward Haslam       Non-executive (appointed 1 May 2004)                        
Catherine Markus    Non-executive                                               
Sir William Purves  Non-executive (appointed 10 February 2004)                  
Patrick Quirk       Non-executive                                               
Zwelakhe Sisulu     Non-executive (appointed 4 February 2005)                   
Audit/Risk Committee                                                            
Sir William Purves (Chairman)                                                   
David Dix                                                                       
Edward Haslam                                                                   
Nicholas Sibley                                                                 
Remuneration/Succession Planning Committee                                      
Edward Haslam (Chairman)                                                        
Catherine Markus                                                                
Nicholas Sibley                                                                 
Nomination Committee                                                            
The full Board comprises the Nomination Committee                               
Company Secretary                                                               
Willi Boehm                                                                     
Issued Capital                                                                  
At 31 December 2004, the Company had on issue:                                  
82,753,892 fully paid common shares                                             
4,027,979 unlisted options                                                      
Substantial Shareholders 31         No. of      Percentage                      
December 2004                       Shares                                      
Impala Platinum Holdings Ltd        7,141,966   8.63 %                          
J P Morgan Nominees Australia       5,512,590   6.66 %                          
Limited                                                                         
ANZ Nominees Limited                5,222,040   6.31 %                          
Chase Nominees Limited (FISL)       4,684,626   5.66 %                          
Broker (LSE)                                                                    
Numis Securities                                                                
Cheapside House                                                                 
138 Cheapside                                                                   
London EC2V 6LH                                                                 
Telephone: +44 20 7776 1500                                                     
Facsimile: +44 20 7776 1550                                                     
Broker (ASX)                                                                    
Euroz Securities                                                                
Level 14, The Quadrant                                                          
1 William Street                                                                
Perth WA 6000                                                                   
Telephone: +61 8 9488 1400                                                      
Fax: +61 9488 1478                                                              
Sponsor in South Africa (JSE)                                                   
Nedbank Capital                                                                 
135 Rivonia Road                                                                
Sandown, Sandton 2196                                                           
Telephone: +27 11 294 3601                                                      
Aquarius Platinum (South Africa) (Proprietary) Ltd.                             
50.5% Owned                                                                     
(Incorporated in the Republic of South Africa)                                  
Registration Number 2000/000341/07                                              
The Great Wall Group Building                                                   
Block A, 1st Floor                                                              
5 Skeen Boulevard                                                               
Bedfordview South Africa 2007                                                   
P O Box 1282                                                                    
Bedfordview South Africa 2009                                                   
Telephone:     +27 11 455 2050                                                  
Facsimile:     +27 11 455 2095                                                  
Email:         info@aquariussa.co.za                                            
Aquarius Platinum Corporate Services Pty Ltd                                    
100% Owned                                                                      
(Incorporated in Australia)                                                     
ACN 094 425 555                                                                 
Level 4, Suite 5                                                                
South Shore Centre                                                              
85 The Esplanade                                                                
South Perth Western Australia  6151                                             
Telephone:     +61 (8) 9367 5211                                                
Facsimile:     +61 (8) 9367 5233                                                
Email:         info@aquariusplatinum.com                                        
AQPSA Management                                                                
Stuart Murray       Executive Chairman                                          
Gert Ackerman       Managing Director                                           
Ayanda Khumalo      Finance Director                                            
Gordon Ramsay       Projects Director                                           
Neil Collett        General Manager P&SA Project                                
Gabriel de Wet      General Manager Engineering                                 
Graham Ferreira     General Manager Finance                                     
Hugo Holl           General Manager Everest                                     
Robert Mallinson    General Manager Marikana                                    
Hulme Scholes       General Manager Commercial                                  
                    & Legal / Company Secretary                                 
Dave Starley        General Manager Kroondal                                    
Mimosa Mine Management                                                          
Alex Mhembere       Managing Director                                           
Winston Chitando    Finance Director                                            
Herbert Mashanyare  Technical Director                                          
Peter Chimboza      General Manager                                             
Glossary                                                                        
A$             Australian Dollar                                                
Aquarius       Aquarius Platinum Limited                                        
ABET           Adult Basic Education Training programme                         
APS            Aquarius Platinum Corporate Services Pty Ltd                     
AQPSA          Aquarius Platinum (South Africa) Pty Ltd                         
ASACS          Aquarius Platinum (SA) (Corporate Services) (Pty) Limited        
DIFR           Disabling Injury Incidence Rate - being the number of lost time  
               injuries expressed as a rate per 1,000,000 man-hours worked      
DIIR           Disabling Injury Incidence Rate - being the number of lost time  
injuries expressed as a rate per 200,000 man-hours worked        
EMPR           Environmental Management Programme Report                        
Everest        Everest Platinum Mine                                            
Great Dyke                                                                      
Reef           A PGE bearing layer within the Great Dyke Complex in Zimbabwe    
g/t            Grams per tonne, measurement unit of grade (1 g/t = 1 part per   
               million)                                                         
JORC code      Australasian code for reporting of Mineral Resources and Ore     
Reserves                                                         
JSE            JSE Securities Exchange South Africa                             
Kroondal       Kroondal Platinum Mine                                           
LHD            Load Haul Dump machine                                           
Marikana       Marikana Platinum Mine                                           
Mimosa         Mimosa Mining Company (Private) Limited                          
NOSA           National Occupational Safety Association                         
PGE            Platinum Group Elements.  Six metallic elements                  
commonly found together which constitute the                     
               platinoids.  These are platinum (Pt), palladium                  
               (Pd), rhodium (Rh), ruthenium (Ru), osmium (Os)                  
               and iridium (Ir).                                                
PGE(s) (6E)    Platinum Group Elements. Six metallic elements                   
               commonly found together which constitute the                     
               platinoids. These are Pt (platinum), Pd                          
               (palladium), Rh (rhodium), RU (ruthenium), Ir                    
(Iridium) and Os (osmium)                                        
PGM(s) (4E)    Platinum Group Metals.  Aquarius reports the                     
               composite grade comprising Pt+Pd+Rh+Au (gold),                   
               the Pt, Pd and Rh being the most                                 
economic platinoids in the UG2 Reef.                             
P&SA           Pooling & Sharing Agreement between KPM and RPM                  
               Ltd                                                              
R              South African Rand                                               
RK1            Consortium comprising Aquarius Platinum (SA)                     
               (Corporate Services) (Pty) Limited (ASACS), GB                   
               Mining and Exploration (SA) (Pty) Limited (GB)                   
               and Sylvania South Africa (Pty) Ltd (SLVSA).                     
ROM            Run of Mine.  The ore from mining which is fed                   
               to the concentrator plant.  This is usually a                    
               mixture of UG2 ore and waste.                                    
RPM            Rustenburg Platinum Mines Limited                                
TKO            TKO Investment Holdings Limited                                  
Ton            1 Metric tonne (1 000kg)                                         
UG2 Reef       A PGE bearing chromite layer within the Critical                 
               Zone of the Bushveld Complex                                     
$              United States Dollars                                            
Z$             Zimbabwe Dollar                                                  
Further information please contact:                                             
In Australia:                                                                   
Willi Boehm                                                                     
Aquarius Platinum Corporate Services Pty Ltd                                    
+61 (0)8 9367 5211                                                              
In United Kingdom:                                                              
Nick Bias                     Alex Buck                                         
Aquarius Platinum Limited     Buckbias Limited                                  
+ 44 (0)7887 920 530          +44 7392 740 452                                  
In South Africa:                                                                
Stuart Murray                 Charmane Russell                                  
Aquarius Platinum (South      Russell & Associates                              
Platinum) (Pty) Ltd           +27 11 880 3924                                   
+27 (0)11 455 2050                                                              
or visit:                                                                       
www.aquariusplatinum.com                                                        
Date: 08/02/2005 12:29:27 PM                     
Produced by the JSE SENS Department                                             
                                                                                
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: