Wed 26 Apr 2006, 15:36 Aquarius Platinum Limited - Third Quarter Results:
AQP
 AQP                                                                             
Aquarius Platinum Limited - Third Quarter Results: 31 March 2006                
Aquarius Platinum Limited                                                       
(Incorporated In Bermuda)                                                       
Registration number: EC26290                                                    
Share code on JSE: AQP                                                          
ISIN: BMG0440M1029                                                              
Share code on ASX: AQP. AXISIN: BMG0440M1029                                    
26 APRIL 2006                                                                   
THIRD QUARTER RESULTS: 31 MARCH 2006                                            
EVEREST TAKES GROUP PRODUCTION TO RECORD HIGHS                                  
Highlights                                                                      
* Quarterly cash profit climbs to $26.7 million, resulting in a net profit of   
  $18.6 million                                                                 
* Year to date net profit at $44.6 million                                      
* Record quarterly group attributable production: 120,105 PGM ounces, up 27%    
quarter on quarter                                                            
* Year to date group attributable production: 318,531 PGM ounces                
* Average PGM basket prices rise 9% at South African and 13% at Zimbabwean      
  operations                                                                    
Kroondal (P&SA1)                                                                
* 107,501 PGM ounces produced for the quarter (Aquarius attributable 53,751 PGM 
  ounces)                                                                       
* Decline sinking at No. 5 Shaft on Townlands commenced                         
* Cash margin increases 5% quarter on quarter to 61%                            
Marikana (P&SA2)                                                                
* Open pit production hampered by the pattern and intensity of rainfall.        
  Primary opencast contractor MCC performed well despite adverse weather        
* Production build-up schedule on P&SA2 plan                                    
* Trial underground mining infrastructure underway                              
* Production 5,810 PGM oz (Aquarius attributable 2,905 PGM ounces): cash margin 
  4% for the quarter                                                            
Everest                                                                         
* Strong ramp-up continues with production increasing to 46,081 PGM ounces      
* Opencast mining continues ahead of schedule, with underground mine            
  establishment on target                                                       
* First quarter at fully operational status, reporting a gross cash margin at   
  53%                                                                           
Mimosa                                                                          
* Production 33,252 PGM ounces (Aquarius attributable 16,626 PGM ounces)        
* Cash costs steady at $331 per PGM ounce, $108 per PGM ounce after by-product  
  credits                                                                       
* Gross cash margin rises to 66% on relatively stable costs and higher PGM      
  basket price                                                                  
* Wedza Phase IV Upgrade, commissioning commenced 8th April, ahead of schedule  
  and to budget                                                                 
CTRP                                                                            
* PGM production marginally down 3% to 1,484 PGM ounces (Aquarius attributable  
742 PGM ounces)                                                               
* Significant operational improvement as recoveries increase to 51% from 27% in 
  the previous quarter                                                          
* Improvement in unit costs, down 42% lower than previous quarter at R2000 per  
PGM ounce                                                                     
* Gross cash margin improves to 65% from 43% in the previous quarter            
Commenting on the results, Stuart Murray, CEO said. "The group has achieved     
record quarterly production, notably with the new Everest mine contribution, at 
a time of good platinum group metal basket prices, to deliver a significant net 
profit.  I believe that this performance is satisfactory, notwithstanding       
certain operational difficulties that we encountered at both at Kroondal and    
Marikana.  Whilst rain is always welcome in Africa, for open pit miners like    
Aquarius at Marikana, the abnormally high rainfall during the quarter has hurt  
production.  Encouragingly, trial underground mining at Marikana is progressing 
well and we are confident that the long-term solution for this operation is now 
assured through the P&SA2 and underground operations in general."               
Production by Mine                                                              
PGMs (4E)    Quarter Ended                                                      
             Jun 2005      Sep 2005     Dec 2005      March 2006                
Kroondal     116,669       115,362      117,175       107,501                   
Marikana     26,940        27,322       20,789        5,810                     
Mimosa       35,644        36,368       35,394        33,252                    
CTRP         1,473         1,363        1,533         1,484                     
Everest      -             -            7,111         46,081                    
Total        180,726       180,415      182,002       194,128                   
Production by Mine Attributable to Aquarius                                     
PGMs (4E)    Quarter Ended                                                      
             Jun 2005     Sep 2005      Dec 2005      March 2006                
Kroondal     58,335       57,681        58,588        53,751                    
Marikana     26,940       27,322        10,394        2,905                     
Mimosa       17,822       18,184        17,697        16,626                    
CTRP         737          682           767           742                       
Everest      -            -             7,111         46,081                    
Total        103,834      103,869       94,557        120,105                   
Aquarius announces consolidated earnings for the quarter to 31 March 2006 of    
$18.6 million (US 22.2 cents per share) on a 27% increase in attributable       
production. The newly commissioned Everest mine made a significant contribution 
in the quarter.  Cash earnings (before depreciation and amortisation) were $26.7
million.                                                                        
Aquarius Attributable Production and Net Profit Summary                         
Quarter   Quarter    Quarter                
                                    :         :          :                      
                                    Sep       Dec        Mar                    
                                    2005      2005       2006                   
PGM Production (4E) (attributable   103,869   94,557     120,105                
ounces)                                                                         
Net Profit After Tax & Outside      $9.9 m    $16.0 m    $18.6 m                
Equity Interests                                                                
Production of PGMs attributable to shareholders of Aquarius was 120,105 PGM     
ounces, up 27% from the previous quarter ended December 2005.                   
Revenue for the quarter, net of currency adjustments, was $115 million, up 46%  
from the previous quarter.  Net finance costs for the quarter were $0.6 million.
Depreciation was $3.7 million for the quarter.  Amortisation arising from the   
fair value uplift of mineral rights at $4.3 million reflects increased          
production.                                                                     
Aquarius Group cash balances at 31 March 2006 were $119.4 million, an increase  
of $34.4 million since December 2005.  The increased cash balance reflects lower
capital expenditure of $25 million incurred in the quarter and significantly    
higher PGM revenue, up 46% from the previous quarter, due to higher metal prices
and production.                                                                 
Over the quarter, the Rand strengthened 6% against the US Dollar impacting on   
costs in US Dollar terms.  This was, however, offset by increased production and
higher US Dollar PGM basket prices achieved during the quarter, contributing to 
the improved quarterly profit performance.                                      
Kroondal"s cash costs per ROM ton increased 2% to R181 compared with the        
previous quarter due to fewer working days as a result of Christmas and New Year
holidays.  Cash costs per PGM ounce for the quarter increased by 3% to R2,514.  
These costs include R219 per PGM ounce of decline development costs comprising  
ledging and sinking. Development costs on a PGM ounce basis represented R34 per 
PGM ounce.                                                                      
Marikana"s cash costs for the quarter were negatively impacted by low production
due to very heavy rains.  Because of the low levels of production in the        
quarter, the implementation of the P&SA2 and the mobilisation of the new mining 
contractor, on mine cash costs on a PGM ounce basis do not reflect steady state 
production and are not comparable to previous quarters.                         
Mimosa realised a cash cost per PGM ounce of US$331 ($108 per ounce after by-   
product credits) compared with the previous quarter"s figure of US$325 per ounce
($94 per ounce after by-product credits).  The 2% increase in costs is          
attributable to a lower volume realised in this quarter compared with the       
previous quarter, due to the Christmas and New Year holidays.                   
Metals Prices                                                                   
The value of the South African PGM basket continued to rise during the quarter  
to close at R7,188 per PGM ounce, an 18% increase since the end of December     
2005. This price strength has continued into the current quarter, having at one 
point broken through the historic highs of 2001. The average Zimbabwean PGM     
basket over the quarter was 13% higher at US$750 per PGM ounce, and went on to  
close 18% higher quarter on quarter at US$877 per PGM ounce.                    
Although the country basket prices underwent similar increases, the reasons were
different. The South African basket is heavily biased towards platinum and      
rhodium, the prices for which increased 12% and 14% respectively over the       
quarter.  In Zimbabwe, where the basket is less platinum rich and more balanced 
with lower priced palladium, the overall basket price nonetheless increased 18% 
over the quarter owing to a quarter on quarter 29% increase in the palladium    
price to close at US$332 per ounce.                                             
Financials                                                                      
Aquarius Platinum Limited                                                       
Consolidated Income Statement                                                   
Quarter ended 31 March 2006                                                     
US$"000                                                                         
                                       Quarter   Nine       Financia            
ended*    months     l year              
                                                 ended*     ended               
                                       31/03/06  31/03/06   30/06/05            
Aquarius PGM Production                120,105   318,531    327,669             
(attributable ounces)                                                           
                                Not                                             
                                e                                               
Revenue                         (i)    116,939   276,645    222,327             
Forex sales adjustments         (ii    (1,900)   (4,197)    2,797               
                                )                                               
Total revenue                          115,039   272,448    225,124             
Cost of sales                   (ii    (58,798)  (157,348   (174,936            
i)               )          )                   
Gross profit                           56,241    115,100    50,188              
Amortisation of fair value             (4,289)   (8,014)    (6,745)             
uplift of mineral properties                                                    
Gross profit after                     51,952    107,086    43,443              
amortisation of fair value                                                      
uplift                                                                          
Admin & other costs                    (3,218)   (5,201)    (5,976)             
Finance costs                   (iv    (573)     634        484                 
                                )                                               
FX movements                    (v)    (3,638)   (5,962)    (9,889)             
Profit before tax                      44,523    96,557     28,062              
Income tax expense                     (12,860)  (25,441)   (3,446)             
Profit after tax                       31,663    71,116     24,616              
Minority interest               (vi    (13,019)  (26,557)   (3,666)             
                                )                                               
Net profit for the period              18,644    44,559     20,950              
Earnings per share (basic -            22.2      53.1       25.3                
cents)                                                                          
* Unaudited                                                                     
Notes on the Consolidated Income Statement                                      
(i)  Revenue is up 46% from the previous quarter due to increased production and
     higher PGM prices                                                          
(ii) Reflects effects of adjusting revenue recorded at time of production to    
cash received at the end of the four month pipeline                        
(iii)Cost of sales on a per PGM ounce basis (Aquarius Group) are in line with   
     previous quarter"s performance                                             
(iv) Finance costs reflect interest expense on Group interest bearing borrowings
(v)  Reflects foreign exchange movements on translation of net monetary assets  
(vi) Minority interests reflects 29.5% and 20% outside equity interest of       
     Savannah Consortium and Impala Platinum Holdings Limited (Implats) in AQPSA
Aquarius Platinum Limited                                                       
Consolidated Cash Flow Statement                                                
Quarter ended 31 March 2006                                                     
US$"000                                                                         
                                      Quarter    Nine        Financi            
ended*     months      al year            
                                                 ended*      ended              
                                      31/03/06   31/03/06    30/06/0            
                                                             5                  
Note                                             
Net operating cash inflow      (i)    56,678     115,378     31,458             
Net investing cash outflow     (ii)   (25,010)   (100,417    (88,152            
                                                 )           )                  
Net financing cash inflow      (iii   2,915      26,412      54,921             
                               )                                                
Net increase (decrease) in            34,583     41,373      (1,773)            
cash held                                                                       
Opening cash balance                  84,954     75,251      77,942             
Exchange rate movement on             (154)      2,759       (918)              
cash                                                                            
Closing cash balance                  119,383    119,383     75,251             
* Unaudited                                                                     
Notes on the YTD Consolidated Cash Flow Statement                               
(i)   Net operating cash flow includes $129.4 million net inflow from           
      operations, $0.4 million net finance costs and $13.6 million income tax   
payments                                                                  
(ii)  Reflects payments for mine construction costs relating mainly to the new  
      Everest operation                                                         
(iii) Reflects net proceeds from redraw of finance facilities of $28.1 million, 
conversion of options $5.0 million, dividends paid of $9.2m and repayment 
      of share plan loans and option conversion $2.5 million                    
.Aquarius Platinum Limited                                                      
Consolidated Balance Sheet                                                      
at 31 March 2006                                                                
US$"000                                                                         
                              Note    31 March 06    30 June 05                 
                                      *                                         
Assets                                                                       
   Cash assets                (i)     119,383        75,251                     
   Current receivables        (ii)    50,144         44,695                     
   Other current assets       (iii)   21,463         16,312                     
Non-current receivables    (iv)    295            2,928                      
   Mining assets              (v)     501,643        408,765                    
   Other non-current assets           663            541                        
   Total Assets                       693,591        548,492                    
Liabilities                                                                  
   Current liabilities        (vi)    44,415         35,480                     
   Non-current payables       (vii)   160,316        150,735                    
   Non-current interest-      (viii   44,705         16,037                     
bearing liabilities        )                                                 
   Other non-current          (ix)    100,708        78,315                     
   liabilities                                                                  
   Total Liabilities                  350,144        280,567                    
Net Assets                         343,447        267,925                    
   Equity                                                                       
   Parent entity interest             281,730        235,352                    
   Minority interest                  61,717         32,573                     
Total Equity                       343,447        267,925                    
* Unaudited                                                                     
Notes on the Consolidated Balance Sheet                                         
(i)   Cash balance rose due to strong operating cash flows during the quarter   
(ii)  Reflects debtors receivable on PGM concentrate sales                      
(iii) Increase reflects stockpile build up to accommodate the Everest expansion 
(iv)  Reduction attributable to the repayment of employee share plan loans      
(v)   Increase in mining assets mainly relates to Everest construction          
(vi)  Includes tax payable ($10 million) and creditors ($34 million)            
(vii) Reflects deferred income from BEE transaction ($10.6 million) and portion 
      of Implats and Savcon non interest bearing shareholder loans (Impala      
      Platinum $66.9 million and Savcon $82.8 million)                          
(viii)Reflects non-current portion of interest bearing debt payable to RMB      
      ($27.2 million) and interest bearing shareholder loan to Savcon ($17.5    
      million)                                                                  
(ix)  Reflects deferred tax liabilities $66 million and provision for closure   
costs $35 million                                                         
Operations                                                                      
AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum 50.5%)            
Kroondal Mine                                                                   
Safety                                                                          
The (12 month rolling average) DIIR improved marginally to 0.93 from 0.96 in the
previous quarter. The Mine achieved 800,000 fatality-free man shifts.           
Mining                                                                          
* Underground operations hoisted 1.32 million tons from 192,000 square meters   
  mined, with a further 72,000 tons from opencast mining                        
* Decline development at the No. 5 Shaft is on track, expecting to intersect UG2
  reef in late 2006                                                             
Processing                                                                      
* Plant feed was 1.49 million tons processed, including 106,000 tons from the   
  stockpile                                                                     
* Due to shorter working quarter, PGM production down 8% to 107,501 PGM ounces  
* Concentrator plants performed well with recoveries improving 2% to 78%        
Revenue                                                                         
The PGM basket price for the quarter increased 12% to $1,064 per PGM ounce,     
resulting in mine revenue of R686m for the quarter (AQPSA share R343m).  The    
gross cash margin rose to 61%, reflecting the higher PGM prices.                
Kroondal: Metal in concentrate produced (PGM ounces)                            
Quarter     Pt      Pd       Rh      Au       PGMs    PGMs                      
ended                                                 attributable              
to Aquarius               
March 06    64,248  31,372   11,342  539      107,501 53,751                    
Dec 05      69,830  34,332   12,422  591      117,175 58,588                    
Sept 05     69,129  33,420   12,250  563      115,362 57,681                    
Jun 05      69,875  33,728   12,499  567      116,669 58,335                    
Operations                                                                      
The mining operations were impacted by the Christmas and New Year holiday breaks
with a slower than desired ramp up in the New Year. This resulted in 85         
operating days in the quarter, 6 days less than the previous quarter. Operations
produced a total 1.4 million ROM tons, and a 25,000 ton stockpile remains on the
surface for processing.  PGM production for the quarter was 8% lower at 107,501 
PGM ounces (Aquarius attributable 53,751 PGM ounces).                           
Plant head grade was 3% lower at 2.85g/t due to higher than normal potholing at 
No. 3 Shaft.  Increased development is ongoing to overcome this problem.        
Although negatively impacting on production, this was partly offset by excellent
plant performance.  Following ongoing re-engineering, overall recoveries        
improved 2% despite the reduced head grade to the K2 plant. The K1 concentrator 
achieved recoveries of 80%+ during the last two month"s of the quarter following
adjustments to the circuit.  The K2 concentrator also underwent a phase of      
re-engineering to improve plant performance.                                    
Cash costs per ROM ton increased 2% to R181 compared with the previous quarter  
in part due to lower comparable period on period production.  Cash costs per PGM
ounce for the quarter increased by 3% to R2,514.  Importantly, these costs      
include R219 per PGM ounce of decline development costs comprising ledging and  
sinking.  Development costs on a PGM ounce basis represented R34 per PGM ounce. 
Development and equipping of additional underground mining areas continues at   
the Central, East and No. 3 and No. 5 Shafts.  Decline sinking is approximately 
1,000 metres ahead of schedule which will ensure that P&SA1 is able to sustain  
production going forward pending the production ramp-up at the new No. 5 shaft. 
No. 4 Shaft                                                                     
No. 4 shaft was transferred to P&SA2 at the start of the quarter under review as
part of the P&SA2 Agreement and the associated capital expenditures were also   
transferred to the P&SA2 books.                                                 
Project Management and Capital Expenditure                                      
Capital expenditure for the next quarter is expected to be R23 million          
comprising the following:                                                       
a)  Ongoing Mine Equipping: The ongoing installation of conveyors and associated
    equipment is progressing well against schedule.                             
b)  Chairlifts: Chairlift installations at Central and East mines are nearing   
    completion.  This will reduce the travelling time of the workforce resulting
in a positive effect on productivity.                                       
c)  No. 5 Shaft (Townlands): Sinking of this decline commenced in February 2006 
    and is at 148m at the end of the quarter.  It is expected that reef will be 
    intersected in October this year.  R51m of the R131m budget has been        
committed to date and the project is expected to be completed on budget.    
Marikana Mine                                                                   
Comparatives between the current quarter and the previous quarter are not       
meaningful owing to the appointment of a new open pit mining contractor, MCC in 
January 2006 (currently in ramp-up mode) in place of the previous contractor    
whose contract was rescinded in December 2005.                                  
Safety                                                                          
The (12 month rolling average) DIIR rate improved to a record 0.23 from 0.72 in 
the previous quarter. The Mine recorded 627,946 fatality-free shifts.           
Mining                                                                          
* Open pit mining contractor MCC has mobilised to schedule, recording a good    
  performance in the face of adverse weather conditions                         
* No. 4 shaft underground production build-up & service infrastructure is on    
  schedule                                                                      
* Trial mining at No. 1 shaft continues to advance, with favourable mining      
  conditions continuing                                                         
* ROM Stockpiles at the end of the quarter totalled 124,000 tons                
Processing                                                                      
* Concentrator throughput for the quarter was 178,000 tons (94,000 from P&SA2   
  and including 84,000 tons treated on behalf of Anglo Platinum)                
* Recoveries improved to 66% for the quarter (62% previous quarter)             
* New contractor in ramp-up mode produced 5,810 PGM ounces for the quarter from 
  94,000 tons, (AQPSA attributable 2,905 PGM ounces)                            
* ROM stockpiles built up in March contain an estimated recoverable 6,400 PGM   
ounces                                                                        
Revenue                                                                         
The PGM basket price for the quarter increased 11% to $1,028 per PGM ounce,     
resulting in mine revenue of R51m for the quarter (AQPSA share R25 million).    
The cash margin decreased to 4% and cash costs increased to R8,416 per ounce.   
Marikana: Metal in concentrate produced (PGM ounces)                            
Quarter     Pt         Pd         Rh         Au         PGMs                    
ended                                                                           
March 06    3,591      1,642      534        43         5,810                   
Dec 05      12,887     5,879      1,861      162        20,789                  
Sept 05     17,244     7,409      2,466      203        27,322                  
Jun 05      16,893     7,402      2,428      217        26,940                  
Operations                                                                      
94,000 ROM tons were processed resulting in PGM production for the quarter of   
5,810 PGM ounces.  Due to open pit water issues, an opportunity to toll mill    
84,000 tons of ore on behalf of Anglo Platinum was undertaken.                  
ROM stockpiles were built up from 54,000 tons to 124,000 tons by the end of the 
quarter, containing an estimated 6,400 recoverable PGM ounces.  In April, 60% of
this stockpile yielding approximately 4,000 PGM ounces is scheduled to be       
treated, in addition to planned production.                                     
The low production rate for the quarter was the result of both the pattern of   
rainfall and the unusually high rainfall in January and February which flooded  
the main open-pit bottom.  Over one week at the beginning of January, 300 mm (12
inches) of rain fell at the operation. Some four weeks later, 230mm (9 inches)  
of rain then again fell over one week, an amount approximating the typical      
annual rainfall for the area over a rainy season, and an amount almost four     
times as much as would fall on average for January and February combined.       
During this period, three 1-in-10 year flood events were recorded in the        
surrounding area.  In-pit pumping capacity was increased five fold to allow MCC 
access to pit bottom for reefing operations during the month of March.  Access, 
however, was denied to reefing operations for nearly two-thirds of the available
time during January and February.                                               
MCC have mobilised on site and are on schedule to deliver the full production   
schedule for the main pit by the end of the financial year despite the flooding 
setback that occurred during the quarter.  The toll milling has allowed the     
process plant to operate during March whilst the open pit was being de-watered  
and reefing operations were being re-established with the objective of building 
an ore stockpile.                                                               
Cash costs for the quarter were negatively impacted as a result of poor         
production affected by the heavy rains.                                         
Due to the very low levels of production in the quarter, on mine cash costs on a
PGM ounce basis do not reflect steady state production and are not comparable to
previous quarters.                                                              
Marikana Pool & Share Agreement (P&SA2)                                         
Production from No. 4 Shaft during the quarter progressed to plan.  Underground 
development and construction infrastructure are also progressing on schedule.   
The upgrading of the process plant to 250,000 tons per month capacity by the    
incorporation of a dense media separator commenced during the quarter and       
remains on schedule.                                                            
Project Management and Capital Expenditure                                      
Capital expenditure for the next quarter is expected to be R15 million.         
Trial Underground Mining (No. 1 Shaft)                                          
The declines have progressed approximately 200 metres with favourable mining    
conditions persisting.  The portal highwall was permanently supported during the
quarter with shotcrete.  Belt and services infrastructure installations have    
commenced.  Production and service construction, delayed due to heavy rains, has
been revised to ensure that the program remains on schedule.                    
Contractor dispute with Moolman Mining                                          
AQPSA resiled from the mining contract with Moolman Mining during December 2005 
on the basis of a misrepresentation on the part of Moolman Mining when the      
mining contract was originally concluded.  This misrepresentation became        
apparent to AQPSA after the audit, conducted by KPMG during October 2005, into  
the rise and fall formula applied in the mining contract.                       
In the notice of rescission, AQPSA advised Moolman Mining that AQPSA would be   
instituting a damages claim against Moolman Mining arising from the rescission. 
Summons for the damages claim in an amount of R 963,775,098 was served on       
Grinaker-LTA on 18 April 2006.                                                  
Everest Mine                                                                    
Safety                                                                          
The (12 month rolling average) DIIR deteriorated to 0.82 from 0.77 in the       
quarter.  Corrective action initiated early in the quarter has had positive     
results with no disabling injuries occurring during the last month of the       
quarter.  The Department of Minerals and Energy has issued its investigation    
report into the fatality that occurred in the previous quarter.  The report     
concluded that the deceased had failed to secure himself appropriately although 
he had been provided with a safety harness and been trained in the use of a     
safety harness.                                                                 
Mining                                                                          
* Opencast operations are ahead of schedule with 217,052 tons produced during   
  the period                                                                    
* Underground development continues, producing 157,362 tons in the period       
* Stockpiles at the end of the quarter totalled 143,000 tons                    
Processing                                                                      
* Concentrator throughput ramp-up remains ahead of schedule, with 674,720 tons  
processed during the period                                                   
* Overall recoveries increased by 10% to 65%, exceeding expectations for the    
  ramp-up period                                                                
* 46,081 PGM ounces were produced during the period                             
Revenue                                                                         
The realised PGM basket price for the quarter was $964 per PGM ounce, resulting 
in mine revenue of R225 million for the quarter (AQPSA share 100%).             
Everest: Metal in concentrate produced (PGM ounces)                             
Quarter     Pt         Pd         Rh         Au         PGMs (4E)               
ended                                                                           
Mar-06      27,257     14,913     3,472      439        46,081                  
Dec-05      4,161      2,351      532        67         7,111                   
Operations                                                                      
Opencast mining remained ahead of programme, with a total of 217,000 tons       
produced during the quarter.  The opencast mining operation continues to perform
well in terms of production and cost, providing the bulk of the plant feed to   
date.                                                                           
Underground mining also progressed well during the period, with on-reef decline 
development and the establishment of stoping sections continuing.  The          
underground production ramp-up was as planned with an 85% increase in production
to 157,000 tons of underground ROM tons produced during the quarter. Equipping  
of the underground mining remains on track with conveyor installations,         
ventilation and mining services completed on schedule.  The underground mining  
is ramping up as planned within budget, and no significant geological or mining 
problems have been experienced.                                                 
The ramp-up of the concentrator proceeded well with 674,720 tons milled during  
the period.  Plant head grade improved to 3.22 g/t from 3.12 g/t in the previous
quarter, with 70 % of the plant feed consisting of opencast material.  The      
improvement in operational stability following commissioning was reflected in   
the metallurgical recoveries, which improved by 10% to 65%.  This yielded       
production of 46,081 PGM ounces for the period.                                 
Process plant availability and the throughput ramp-up remain encouraging.  A    
stockpile of 143,000 ROM tons remained at the end of the quarter.               
The quarter was the first operational quarter, achieving on mine cash costs of  
R156 per ROM ton milled and R2,280 per PGM ounce.  This is inclusive of ledging 
and sinking costs, of R215 per PGM ounce.                                       
Project Capital Expenditure                                                     
The project capital expenditure commitments totalled R672 million at the end of 
the quarter with capital expenditure to date of R609 million.                   
It is anticipated that the Everest project which was originally budgeted at R819
million will be completed for R707 million, a saving of R112 million.           
Mimosa Mine (Aquarius Platinum 50%)                                             
Safety                                                                          
The good safety record was marred by three disabling injuries incurred in the   
quarter compared with one in the previous quarter, resulting in a (12-month     
rolling average) DIIR for the quarter was 0.23, compared with 0.13 in the       
previous quarter.                                                               
Operations                                                                      
PGM production for the quarter was 6% above targeted levels at 33,252 PGM       
ounces.  ROM tonnage for the quarter was 399,000 tons compared with 429,000 for 
the previous quarter.  The decrease is attributable to less operating days      
arising from the holiday season.  Tons milled during the quarter at 365,000 were
4% below the previous quarter"s level of 279,000 tons as a result of a 5-day    
plant shutdown for mill relining.  Plant feed grade remained almost at par at   
3.69g/t and 3.72g/t for the current and previous quarter respectively.          
Revenue                                                                         
The average basket price realised in the quarter at $750 per PGM ounce, 13%     
stronger than the previous quarter price of $662 per PGM ounce.  Together with  
the contribution from base metals (approximately 27% of gross revenue), this    
generated sales revenue of $27.3 million compared with $27.8 million for the    
previous quarter.                                                               
Mimosa: Metal in concentrate produced (PGM ounces)                              
Quarter    Pt       Pd      Rh       Au       PGMs      PGMs (4E)               
ended                                         (4E)      attributable            
to Aquarius             
March 06   16,820   12,809  1,306    2,317    33,252    16,626                  
Dec 05     17,961   13,582  1,390    2,461    35,394    17,697                  
Sept 05    18,548   13,915  1,407    2,498    36,368    18,184                  
Jun 05     18,269   13,518  1,406    2,451    35,644    17,822                  
Mimosa: Base Metals in concentrate produced (tons)                              
           Mine Production            Attributable to Aquarius                  
Quarter    Ni       Cu       Co       Ni        Cu       Co                     
ended                                                                           
March 06   452      383      14       226       191      7                      
Dec 05     488      410      15       244       205      8                      
Sept 05    512      422      15       256       211      8                      
Jun 05     514      420      15       257       210      8                      
Operating costs                                                                 
Mimosa realised a cash cost per PGM ounce of US$331 ($108 per ounce after by-   
product credits) compared with the previous quarter"s figure of US$325 per ounce
($94 per ounce after by-product credits).  The 2% increase in costs is          
attributable to a lower volume realised in the quarter compared with the        
previous quarter.                                                               
Wedza Phase IV Upgrade                                                          
Work on the Wedza Phase IV Upgrade project has progressed well. Commissioning   
has commenced subsequent to the end of the quarter on 8th April, 6 weeks ahead  
of schedule.                                                                    
Proposed Amendments to the Mines and Minerals Bill                              
The Zimbabwe Minister of Mines and Mining Development issued a statement during 
the quarter proposing radical changes to the Mines and Minerals Act which would 
impact negatively on the business environment in Zimbabwe.  Following further   
representations by the Company and the Chamber of Mines of Zimbabwe, it has     
since been clarified that the statement was no more than an expression of an    
opinion on an issue that is still work in progress.  Meanwhile the company is   
pursuing its indigenisation agenda for discussion with the relevant authorities 
once the work has been finalised.                                               
AQUARIUS PLATINUM (SA) CORPORATE SERVICES (PTY) LTD                             
Chromite Tailings Retreatment Plant (CTRP) (Aquarius Platinum 50%)              
Safety                                                                          
No accidents or lost time injuries have occurred since the start-up of the CTRP 
in February 2005.                                                               
Processing                                                                      
* 26,422 tons processed for the quarter, significantly reduced due to the       
  decision to not treat poor recovery materials                                 
* 1,484 PGM ounces produced, a decrease of 3% on the previous quarter despite   
  58% decrease in tons processed                                                
* Recoveries up to 51% from 27% in the previous quarter                         
Operations                                                                      
During the quarter only current arisings from the Kroondal Chrome Mine were fed 
to the CTRP.  The feed of dump material from Bayer Chrome Mine was stopped due  
to poor recoveries achieved in the second quarter.  The effect was that         
recoveries rose to 51% against 27% in the previous quarter.  Consequently, unit 
costs decreased by 42% to R2,000 per PGM ounce from R3,441 per PGM ounce in the 
previous quarter.                                                               
Following the results of the initial Mintek testwork, a small expansion project 
is planned to increase plant throughput and production.  This expansion will add
dump material from the Kroondal Chrome Mine to the CTRP feed.  It is anticipated
that this project will be completed in the first quarter of the 2007 Financial  
Year at a cost of approximately R2 million.                                     
Additional testwork has also been commissioned at Mintek to further optimise the
recoveries achievable with the various feed sources.                            
CORPORATE MATTERS                                                               
Conversion of South African mining and prospecting rights                       
a) Mining Rights:  The conversion applications for Kroondal and Marikana have   
been submitted by the Regional Office of the Department of Minerals and      
   Energy to their Head Office in Pretoria for approval.                        
   The conversion for Everest will be submitted to the DME Head Office during   
   May 2006.                                                                    
b) Prospecting Rights: All prospecting right conversions have been granted.     
Appointment of Anton Wheeler                                                    
In May 2006, Anton Wheeler will join the AQPSA team as Operations Director.     
Anton is a qualified mining engineer and brings a wealth of knowledge in        
opencast and underground platinum mining experience.  He has a track record     
including implementing "best practice" at Impala Platinum, and laterly worked at
Zimplats in Zimbabwe. All AQPSA mining operations will report to him.           
Dividend paid to Aquarius shareholders"                                         
On 23rd March 2006, an interim dividend of 6 US cents per share (2005: 3 US     
cents per share) was paid to shareholders registered on 2 March 2006.           
Statistical Information: Kroondal P&SA1                                         
Statistical Information:  Kroondal                                              
Data reflects 100%                       Previous  %                            
of mine operations               Current           Change                       
                   Unit                   Quarter  Quarter                      
                                 Quarter Dec       on                           
March   2005      Quarter                      
                                 2006                                           
Safety                                                                          
DIIR               Rate/200,000  0.93    0.96      (3)                          
man hours                                                    
Revenue                                                                         
Gross Revenue      R"M           686     654       5                            
PGM basket Price   $/oz          1,064   946       12                           
Gross cash margin  %             61      56        9                            
Nickel Price       $/lb          6.72    5.74      17                           
Copper Price       USc/lb        224     195       15                           
Ave R/$ rate                     6.13    6.51      (6)                          
Cash Costs on-mine                                                              
Per ROM ton        R/ton         181     177       2                            
                   $/ton         30      27        9                            
Per PGM oz (3E+Au) R/oz          2,514   2,429     3                            
$/oz          410     373       10                           
Per PGE (5E+Au)    R/oz          2,075   2,303     (10)                         
                   $/oz          339     354       (4)                          
Capex                                                                           
Current/Sustaining R"000s        5,237   17,003    (69)                         
100%                                                                            
                   $"000s        854     2,612     (67)                         
Expansion 100%     R"000s        (14631) 25,301                                 
*                                              
                   $"000s        (2386)  3,886                                  
                                 *                                              
Mining Processed                                                                
Underground        ROM Ton "000  1,420   1,446     (2)                          
Open Pit           ROM Ton "000  72      160       (55)                         
Total              ROM Ton "000  1,492   1,606     (7)                          
Grade                                                                           
Plant Head         g/t           2.85    2.96      (4)                          
Recoveries         %             78      77        2                            
PGM Production                                                                  
Platinum           Ozs           64,247  69,830    (8)                          
Palladium          Ozs           31,372  34,332    (9)                          
Rhodium            Ozs           11,342  12,422    (9)                          
Gold               Ozs           540     591       (9)                          
Total PGM (3E+Au)  Ozs           107,501 117,175   (8)                          
Total PGE (5E+Au)  Ozs           130,222 142,650   (9)                          
Base Metals                                                                     
Production                                                                      
Nickel             Tons          104     112       (7)                          
Copper             Tons          49      50        (2)                          
Chromite (000)     Tons (000)    115     145       (21)                         
Statistical Information:  Kroondal                                              
Data reflects 100%             Current   Previous  +/- %   YTD                  
of mine operations                                                              
                   Unit        9 months  9 months  Year    9 months             
                               to Mar    to March  on      to March             
                               06        05        Year    2006                 
Safety                                                                          
DIIR               Rate/200,0  0.93      0.72      29      0.93                 
                   00 man                                                       
                   hours                                                        
Revenue                                                                         
Gross Revenue      R"M         1,912     784       144     1,912                
PGM basket Price   $/oz        942       700       35      942                  
Gross cash margin  %           56        37        51      56                   
Nickel Price       $/lb        6.35      6.56      (3)     6.35                 
Copper Price       USc/lb      197       139       41      197                  
Ave R/$ rate                   6.39      6.12      4       6.39                 
Cash Costs on-mine                                                              
Per ROM ton        R/ton       180       185       (3)     180                  
                   $/ton       28        30        (6)     28                   
Per PGM oz (3E+Au) R/oz        2,476     2,369     5       2,476                
                   $/oz        388       387       0       388                  
Per PGE (5E+Au)    R/oz        2,039     2,281     (11)    2,039                
                   $/oz        319       373       (14)    319                  
Capex                                                                           
Current/Sustaining R"000s      38,761    2068      1,774   38,761               
100%                                                                            
                   $"000s      6,070     338       1,696   6,070                
Expansion 100%     R"000s      43,306    395,176   (89)    43,306               
                   $"000s      6,782     64,607    (90)    6,782                
Mining Processed                                                                
Underground        ROM Ton     4,331     2,454     76      4,331                
                   "000                                                         
Open Pit           ROM Ton     357       206       73      357                  
"000                                                         
Total              ROM Ton     4,688     2,660     76      4,688                
                   "000                                                         
Grade                                                                           
Plant Head         g/t         2.90      3.07      (6)     2.90                 
Recoveries         %           78        80        (3)     78                   
PGM Production                                                                  
Platinum           Ozs         203,207   124,416   63      203,207              
Palladium          Ozs         99,124    60,256    65      99,124               
Rhodium            Ozs         36,014    22,416    61      36,014               
Gold               Ozs         1,694     973       74      1,694                
Total PGM (3E+Au)  Ozs         340,039   208,061   63      340,039              
Total PGE (5E+Au)  Ozs         412,890   252,147   64      412,890              
Base Metals                                                                     
Production                                                                      
Nickel             Tons        326       195       67      326                  
Copper             Tons        147       89        65      147                  
Chromite (000)     Tons (000)  373       189       98      373                  
Note:                                                                           
* Capital expenditure reversal on expansion reflects the transfer of No. 4 Shaft
to P&SA2.                                                                       
Statistical Information: Marikana P&SA2                                         
Statistical Information:                                                        
Marikana                                                                        
Data reflects 100%                 Current    Previous   % Change               
of mine operations                                                              
                     Unit          Quarter     Quarter   Quarter                
                                  March 2006  Dec 2005   on                     
Quarter                
Safety                                                                          
DIIR                 Rate/200,00  0.23        0.72       (68)                   
                     0 man hours                                                
Revenue                                                                         
Gross Revenue        R"M          51          70         (27)                   
PGM basket Price     $/oz         1,028       925        11                     
Gross cash margin    %            4           24         (85)                   
Nickel Price         $/lb         6.72        5.74       17                     
Copper Price         USc/lb       224         195.00     15                     
Ave R/$ rate                      6.13        6.51       (6)                    
Cash Costs on-mine                                                              
Per ROM ton          R/ton        520         334        56                     
                     $/ton        85          51         (5)                    
Per PGM oz (3E+Au)   R/oz         8,416       5,132      64                     
                     $/oz         1,373       788        74                     
Per PGE (5E+Au)      R/oz         6,974       4,879      43                     
                     $/oz         1,138       749        52                     
Capital expenditure                                                             
Current/Sustaining   R"000s       1,202       3,312      (64)                   
100%                                                                            
                     $"000s       196         509        (61)                   
Expansion 100%       R"000s       50,591      8,147      521                    
                     $"000s       8,253       1,251      560                    
Mining Processed                                                                
Underground          ROM Ton      43          28         54                     
                     "000                                                       
Open Pit             ROM Ton      51          291        (82)                   
"000                                                       
Total                ROM Ton      94          319        (71)                   
                     "000                                                       
Grade                                                                           
Plant Head           g/t          2.93        3.24       (10)                   
Recoveries           %            66          62         6                      
PGM Production                                                                  
Platinum             Ozs          3,591       12,887     (72)                   
Palladium            Ozs          1,642       5,879      (72)                   
Rhodium              Ozs          534         1,861      (71)                   
Gold                 Ozs          43          162        (73)                   
Total PGM (3E+Au)    Ozs          5,810       20,789     (72)                   
Total PGE (5E+Au)    Ozs          7,011       24,999     (72)                   
Base Metals                                                                     
Production                                                                      
Nickel               Tons         8           32         (75)                   
Copper               Tons         4           17         (76)                   
Chromite (000)       Tons (000)   13          44         (70)                   
Statistical Information:                                                        
Marikana                                                                        
Data reflects 100% of            Current  Previous  +/- %   YTD                 
mine operations                                                                 
                       Unit      9        9 months  Year    9                   
                                 months   to March  on      months              
to Mar   05        Year    to Mar              
                                 06                         06                  
Safety                                                                          
DIIR                   Rate/200, 0.32     1.09      (71)    0.32                
000 man                                                  
                       hours                                                    
Revenue                                                                         
Gross Revenue          R"M       297      259       15      297                 
PGM basket Price       $/oz      918      701       31      918                 
Gross cash margin      %         1        (17)      n/a     1                   
Nickel Price           $/lb      6.35     6.56      (3)     6.35                
Copper Price           USc/lb    197      139       41      197                 
Ave R/$ rate                     6.39     6.12      4       6.39                
Cash Costs on-mine                                                              
Per ROM ton            R/ton     353      273       29      353                 
                       $/ton     55       45        23      55                  
Per PGM oz (3E+Au)     R/oz      5,427    4,206     29      5,427               
                       $/oz      850      688       24      850                 
Per PGE (5E+Au)        R/oz      4,509    4,027     12      4,509               
                       $/oz      706      658       7       706                 
Capital expenditure                                         -                   
Current/Sustaining     R"000s    7,948    13,309    (40)    7,948               
100%                                                                            
                       $"000s    1,245    2,176     (43)    1,245               
Expansion 100%         R"000s    58,738   -         n/a     58,738              
                       $"000s    9,199    -         n/a     9,199               
Mining Processed                                                                
Underground            ROM Ton   79       -         n/a     79                  
"000                                                     
Open Pit               ROM Ton   751      1,111     (32)    751                 
                       "000                                                     
Total                  ROM Ton   830      1,111     (25)    830                 
"000                                                     
Grade                                                                           
Plant Head             g/t       3.22     3.72      (14)    3.22                
Recoveries             %         63.00    55        15      63                  
PGM Production                                                                  
Platinum               Ozs       33,721   46,975    (28)    33,721              
Palladium              Ozs       14,930   19,012    (21)    14,930              
Rhodium                Ozs       4,861    5,633     (14)    4,861               
Gold                   Ozs       408      602       (32)    408                 
Total PGM (3E+Au)      Ozs       53,920   72,222    (25)    53,920              
Total PGE (5E+Au)      Ozs       64,899   85,566    (24)    64,899              
Base Metals                                                                     
Production                                                                      
Nickel                 Tons      80       87        (8)     80                  
Copper                 Tons      45       46        (1)     45                  
Chromite (000)         Tons      117      169       -       117                 
(000)                                                    
Statistical Information: Everest                                                
Statistical Information:  Everest                                               
Data reflects 100% of               Current     Previous   % Change             
mine operations                                                                 
                       Unit         Quarter      Quarter   Quarter              
                                   March 2006   Dec 2005   on                   
                                                           Quarter              
Safety                                                                          
DIIR                   Rate/200,0  0.82         0.77       6                    
                       00 man                                                   
                       hours                                                    
Revenue                                                                         
Gross Revenue          R"M         225          31         626                  
PGM basket Price       $/oz        964          886        9                    
Gross cash margin      %           53           28         89                   
Nickel Price           $/lb        6.72         6.09       10                   
Copper Price           USc/lb      224          208.00     8                    
Ave R/$ rate                       6.14         6.35       (3)                  
Cash Costs on-mine                                                              
Per ROM ton            R/ton       156          168        (7)                  
                       $/ton       25           27         (5)                  
Per PGM oz (3E+Au)     R/oz        2,280        3,136      (27)                 
                       $/oz        371          494        (25)                 
Per PGE (5E+Au)        R/oz        1,974        2,635      (25)                 
                       $/oz        321          415        (23)                 
Capital expenditure                                                             
Current/Sustaining     R"000s      -            -                               
100%                                                                            
                       $"000s                   -                               
Expansion 100%         R"000s      67,094       203,272    (67)                 
                       $"000s      10,927       32,047     (66)                 
Mining Processed                                                                
Underground            ROM Ton     202          39         418                  
                       "000                                                     
Open Pit               ROM Ton     473          89         431                  
"000                                                     
Total                  ROM Ton     675          129        423                  
                       "000                                                     
Grade                                                                           
Plant Head             g/t         3.22         3.12       3                    
Recoveries             %           65           55         18                   
PGM Production                                                                  
Platinum               Ozs         27,257       4,161      555                  
Palladium              Ozs         14,913       2,351      534                  
Rhodium                Ozs         3,472        532        553                  
Gold                   Ozs         439          67         555                  
Total PGM (3E+Au)      Ozs         46,081       7,111      548                  
Total PGE (5E+Au)      Ozs         53,202       8,223      547                  
Base Metals Production                                                          
Nickel                 Tons        54           8          591                  
Copper                 Tons        28           5          464                  
Chromite (000)         Tons (000)               -          -                    
Statistical Information:  Everest                                               
Data reflects 100% of              Curren  Previo   +/- %   YTD                 
mine operations                    t       us                                   
Unit        9       9        Year on 9                   
                                   months  months   Year    months              
                                   to Mar  to               to Mar              
                                   06      March            06                  
05                                   
Safety                                                                          
DIIR                   Rate/200,0  0.82    -        -       0.82                
                       00 man                                                   
hours                                                    
Revenue                                                                         
Gross Revenue          R"M         225     -        -       225                 
PGM basket Price       $/oz        964     -        -       964                 
Gross cash margin      %           53      -        -       53                  
Nickel Price           $/lb        6.72    -        -       6.72                
Copper Price           USc/lb      224     -        -       224                 
Ave R/$ rate                       6.14    -        -       6.14                
Cash Costs on-mine                                                              
Per ROM ton            R/ton       156     -        -       156                 
                       $/ton       25      -        -       25                  
Per PGM oz (3E+Au)     R/oz        2,280   -        -       2,280               
$/oz        371     -        -       371                 
Per PGE (5E+Au)        R/oz        1,974   -        -       1,974               
                       $/oz        321     -        -       321                 
Capital expenditure                                         -                   
Current/Sustaining     R"000s      -       -        -       -                   
100%                                                                            
                       $"000s              -        -       -                   
Expansion 100%         R"000s      67,094  -        -       67,094              
$"000s      10,927  -        -       10,927              
Mining Processed                                                                
Underground            ROM Ton     202     -        -       202                 
                       "000                                                     
Open Pit               ROM Ton     473     -        -       473                 
                       "000                                                     
Total                  ROM Ton     675     -        -       675                 
                       "000                                                     
Grade                                                                           
Plant Head             g/t         3.22    -        -       3.22                
Recoveries             %           65      -        -       65                  
PGM Production                                                                  
Platinum               Ozs         27,257  -        -       27,257              
Palladium              Ozs         14,913  -        -       14,913              
Rhodium                Ozs         3,472   -        -       3,472               
Gold                   Ozs         439     -        -       439                 
Total PGM (3E+Au)      Ozs         46,081  -        -       46,081              
Total PGE (5E+Au)      Ozs         53,202  -        -       53,202              
Base Metals Production                                                          
Nickel                 Tons        54      -        -       54                  
Copper                 Tons        28      -        -       28                  
Chromite (000)         Tons (000)  -       -        -       -                   
Statistical Information:  Mimosa                                                
Data reflects 100% of mine                         Previo   %                   
operations                                  Curre  us       Change              
                                            nt                                  
                               Unit                         Quarte              
                                            Quart  Quarte   r on                
er     r        Quarte              
                                            Mar    Dec      r                   
                                            2006   2005                         
Safety                                                                          
DIIR - 12 Month rolling        Rate/200,0   0.40   0.13     208                 
Average                        00 man                                           
                               hours                                            
Revenue                                                                         
Gross Revenue                  US$M         27     28       (2)                 
PGM basket Price               $/oz         750    662      13                  
Gross cash margin              %            66     64       3                   
Nickel Price                   $/lb         6.14   6.13     0                   
Copper Price                   USc/lb       201    171      18                  
Cash Costs on-mine                                                              
Per ROM ton                    $/ton        30     30       -                   
Per PGM oz (3E+Au)             $/oz         331    325      2                   
after by-product credits       $/oz         108    94       15                  
Capital expenditure                                                             
Current/Sustaining 100%        $"000s       705    1,895    (63)                
Expansion 100%                 $"000s       6,526  1,050    522                 
Mining                                                                          
Underground                    ROM Ton      399    429      (7)                 
                               "000                                             
Grade                                                                           
Plant Head                     g/t PGM      3.69   3.72     (1)                 
Recoveries                     %            77     78       (1)                 
PGM Production                                                                  
Platinum                       Ozs          16,82  17,961   (6)                 
0                                   
Palladium                      Ozs          12,80  13,582   (6)                 
                                            9                                   
Rhodium                        Ozs          1,306  1,390    (6)                 
Gold                           Ozs          2,317  2,461    (6)                 
Total PGM (3E+Au)              Ozs          33,25  35,394   (6)                 
                                            2                                   
Base Metals Production                                                          
Nickel                         Tons         452    488      (7)                 
Copper                         Tons         383    410      (7)                 
Cobalt                         Tons         14     15       (7)                 
Statistical Information:  Mimosa                                                
Data reflects 100% of mine                 Curren  Previo  +/- %                
operations                                 t       us                           
                               Unit        9       9       Year                 
                                           months  months  on                   
to Mar  to Mar  Year                 
                                           06      05                           
Safety                                                                          
DIIR - 12 Month rolling        Rate/200,0  0.21    0.3     (30)                 
Average                        00 man                                           
                               hours                                            
Revenue                                                                         
Gross Revenue                  US$M        83      61      36                   
PGM basket Price               $/oz        672     585     15                   
Gross cash margin              %           62      61      2                    
Nickel Price                   $/lb        6.41    6.31    2                    
Copper Price                   USc/lb      172     115     50                   
Cash Costs on-mine                                                              
Per ROM ton                    $/ton       32      31      3                    
Per PGM oz (3E+Au)             $/oz        339     346     (2)                  
after by-product credits       $/oz        102     132     (23)                 
Capital expenditure                                                             
Current/Sustaining 100%        $"000s      5,032   11427   (56)                 
Expansion 100%                 $"000s      7,576   738     927                  
Mining                                                                          
Underground                    ROM Ton     1,261   1037    22                   
                               "000                                             
Grade                                                                           
Plant Head                     g/t PGM     3.73    3.67    2                    
Recoveries                     %           78      77      1                    
PGM Production                                                                  
Platinum                       Ozs         53,328  48,473  10                   
Palladium                      Ozs         40,305  35,741  13                   
Rhodium                        Ozs         4,102   3,750   9                    
Gold                           Ozs         7,277   6,559   11                   
Total PGM (3E+Au)              Ozs         105,01  94,523  11                   
                                           2                                    
Base Metals Production                                                          
Nickel                         Tons        1,452   1,382   5                    
Copper                         Tons        1,215   1,143   6                    
Cobalt                         Tons        44      41      7                    
Statistical Information:  Chromite Tailings Retreatment Project                 
Data reflects 100% of                 Current    Previous   % Change            
mine operations                                                                 
                       Unit           Quarter     Quarter   Quarter on          
March 2006  Dec 2005   Quarter             
Safety                                                                          
DIIR                   Rate/200,000  -           -          -                   
                       man hours                                                
Revenue                                                                         
Gross Revenue          R"M           8           9          (7)                 
PGM basket Price       $/oz          1,276       1,099      16                  
Gross cash margin      %             65          43         51                  
Nickel Price           $/lb          6.72        5.74       17                  
Copper Price           USc/lb        224         195        15                  
Ave R/$ rate                         6.13        6.51       (6)                 
Cash Costs on-mine                                                              
Per ROM ton            R/ton         113         87         30                  
                       $/ton         18          13         (5)                 
Per PGM oz (3E+Au)     R/oz          2,000       3,441      (42)                
                       $/oz          326         529        (38)                
Per PGE (5E+Au)        R/oz          1,386       2,346      (41)                
                       $/oz          226         360        (37)                
Capital expenditure                                                             
Current/Sustaining     R"000s                    -          -                   
100%                                                                            
                       $"000s                    -          -                   
Expansion 100%         R"000s                    -                              
                       $"000s                    -                              
Feed Processed                                                                  
Feed Processed         ROM Ton "000  26          61         -                   
Total                  ROM Ton "000  26          61         (57)                
Grade                                                                           
Plant Head             g/t           2.76        2.98       (7)                 
Recoveries             %             51          27         89                  
PGM Production                                                                  
Platinum               Ozs           887         937        (5)                 
Palladium              Ozs           334         350        (5)                 
Rhodium                Ozs           260         243        7                   
Gold                   Ozs           3           3          (2)                 
Total PGM (3E+Au)      Ozs           1,484       1,533      (3)                 
Total PGE (5E+Au)      Ozs           2,142       2,248      (5)                 
Base Metals Production                                                          
Nickel                 Tons          1           1          -                   
Copper                 Tons          0           1          -                   
Chromite (000)         Tons (000)                -          -                   
Statistical Information:  Chromite Tailings Retreatment Project                 
Data reflects 100%                Current  Previous  +/- %   YTD                
of mine operations                                                              
Unit         9        9 months  Year    9                  
                                  months   to March  on      months             
                                  to Mar   05        Year    to Mar             
                                  06                         06                 
Safety                                                                          
DIIR                 Rate/200,000 -        -         -       -                  
                     man hours                                                  
Revenue                                                                         
Gross Revenue        R"M          24       0.4       5,900   24                 
PGM basket Price     $/oz         1,105    812       36      1,105              
Gross cash margin    %            49       30.0      63      49                 
Nickel Price         $/lb         6.35     -         -       6.35               
Copper Price         USc/lb       197      -         -       197                
Ave R/$ rate                      6.39     -         -       6.39               
Cash Costs on-mine                                                              
Per ROM ton          R/ton        95       13        632     95                 
$/ton        15       400       (96)    15                 
Per PGM oz (3E+Au)   R/oz         2,839    -         -       2,839              
                     $/oz         445      -         -       445                
Per PGE (5E+Au)      R/oz         1,998    -         -       1,998              
$/oz         313      -         -       313                
Capital expenditure                                          -                  
Current/Sustaining   R"000s                -         -       -                  
100%                                                                            
$"000s                -         -       -                  
Expansion 100%       R"000s                -         -       -                  
                     $"000s                3,676     -       -                  
Feed Processed                                                                  
Feed Processed       ROM Ton "000 131      20        553     131                
Total                ROM Ton "000 131      20        553     131                
Grade                                                                           
Plant Head           g/t          3.21     2.97      8       3.21               
Recoveries           %            35.00    34        3       35                 
PGM Production                                                                  
Platinum             Ozs          2,687    401       570     2,687              
Palladium            Ozs          966      136       610     966                
Rhodium              Ozs          718      106       577     718                
Gold                 Ozs          9        1         795     9                  
Total PGM (3E+Au)    Ozs          4,380    644       580     4,380              
Total PGE (5E+Au)    Ozs          6,225    -         -       6,225              
Base Metals                                                                     
Production                                                                      
Nickel               Tons         3        -         -       3                  
Copper               Tons         1        -         -       1                  
Chromite (000)       Tons (000)   -        -         -       -                  
Aquarius Platinum Limited                                                       
Incorporated in Bermuda                                                         
Exempt company number 26290                                                     
Board of Directors                                                              
Nicholas Sibley          Non-executive Chairman                                 
Stuart Murray            Chief Executive Officer                                
David Dix                Non-executive                                          
Edward Haslam            Non-executive                                          
Sir William Purves       Non-executive (senior independent director)            
Patrick Quirk            Non-executive                                          
Zwelakhe Sisulu          Non-executive                                          
Audit/Risk Committee                                                            
Sir William Purves (Chairman)                                                   
David Dix                                                                       
Edward Haslam                                                                   
Nicholas Sibley                                                                 
Remuneration/Succession Planning Committee                                      
Edward Haslam (Chairman)                                                        
Nicholas Sibley                                                                 
Nomination Committee                                                            
The full Board comprises the Nomination Committee                               
Company Secretary                                                               
Willi Boehm                                                                     
Issued Capital                                                                  
At 31 March 2006, the Company had on issue:                                     
83,889,892 fully paid common shares                                             
2,721,402 unlisted options                                                      
Substantial Shareholders 31 March  Number of    Percentage                      
2006                               Shares                                       
Impala Platinum Holdings Ltd.      7,141,966    8.6                             
National Nominees Limited          5,473,050    6.5                             
Nutraco Nominees Limited           5,162,850    6.2                             
Chase Nominees Limited             4,341,154    5.2                             
Broker (LSE)                                                                    
Williams de Broe                                                                
6 Broadgate                                                                     
London EC2M 2RP                                                                 
Telephone: +44 (0)20 7588 7511                                                  
Facsimile: +44 (0)20 7588 8860                                                  
Broker (ASX)                                                                    
Euroz Securities                                                                
Level 14, The Quadrant                                                          
1 William Street                                                                
Perth WA 6000                                                                   
Telephone: +61 (0)8 9488 1400                                                   
Facsimile: +61 (0)8 9488 1478                                                   
Sponsor (JSE)                                                                   
Investec Bank Limited                                                           
100 Grayston Drive                                                              
Sandown Sandton 2196                                                            
Telephone: +27 (0)11 286 7326                                                   
Facsimile: +27 (0)11 291 1066                                                   
Aquarius Platinum (South Africa)            Aquarius Platinum Corporate         
(Proprietary) Ltd.                          Services Pty Ltd                    
50.5% Owned                                 100% Owned                          
(Incorporated in the Republic of South      (Incorporated in Australia)         
Africa)                                     ACN 094 425 555                     
Registration Number 2000/000341/07                                              
                                            Level 4, Suite 5, South Shore       
Block A, 1st Floor, The Great Wall Group    Centre,                             
Building                                    85 The Esplanade, South Perth, WA   
5 Skeen Boulevard, Bedfordview              6151,                               
South Africa 2007                           Australia                           
P O Box 1282                                PO Box 485                          
Bedfordview South Africa 2009               South Perth, WA 6151, Australia     
Telephone:     +27 (0)11 455 2050           Telephone:     +61 (0)8 9367 5211   
Facsimile:     +27 (0)11 455 2095           Facsimile:     +61 (0)8 9367 5233   
Email:         info@aquariussa.co.za        Email:                              
                                            info@aquariusplatinum.com           
AQPSA Management                                                                
Stuart Murray  Executive Chairman                                               
Gert Ackerman  Managing Director                                                
Ayanda Khumalo Finance Director                                                 
Neil Collett   General Manager Business Development                             
Graham Ferreira     General Manager Finance & Company Secretary                 
Hugo Holl General Manager Everest                                               
Robert Mallinson    General Manager Marikana                                    
Gordon Ramsay  General Manager Projects                                         
Dave Starley   General Manager Kroondal                                         
Gabriel de Wet General Manager Engineering                                      
Mimosa Mine Management                                                          
Alex Mhembere  Managing Director                                                
Winston Chitando    Finance Director                                            
Herbert Mashanyare  Technical Director                                          
Peter Chimboza Operations Director                                              
Glossary                                                                        
A$        Australian Dollar                                                     
Aquarius       Aquarius Platinum Limited                                        
ABET      Adult Basic Education Training programme                              
APS       Aquarius Platinum Corporate Services Pty Ltd                          
AQPSA          Aquarius Platinum (South Africa) Pty Ltd                         
ASACS          Aquarius Platinum (SA) (Corporate Services) (Pty) Limited        
CTRP      Chromite Ore Tailings Retreatment Operation                           
DIFR      Disabling Injury Incidence Rate - being the number of lost time       
injuries expressed as a rate per 1,000,000 man-hours worked                     
DIIR      Disabling Injury Incidence Rate - being the number of lost time       
injuries expressed as a rate per 200,000 man-hours worked                       
EMPR      Environmental Management Programme Report                             
Everest   Everest Platinum Mine                                                 
Great Dyke Reef     A PGE bearing layer within the Great Dyke Complex in        
Zimbabwe                                                                        
g/t  Grams per tonne, measurement unit of grade (1g/t = 1 part per million)     
JORC code      Australasian code for reporting of Mineral Resources and Ore     
Reserves                                                                        
JSE       JSE Securities Exchange South Africa                                  
Kroondal       Kroondal Platinum Mine                                           
LHD       Load Haul Dump machine                                                
Marikana  Marikana Platinum Mine                                                
Mimosa    Mimosa Mining Company (Private) Limited                               
NOSA National Occupational Safety Association                                   
PGE(s) (6E)         Platinum Group Elements.  Six metallic elements commonly    
found together which constitute the platinoids.  These are Pt (platinum), Pd    
(palladium), Rh (rhodium), RU (ruthenium), Ir (iridium) and Os (osmium)         
PGM(s) (4E)         Platinum Group Metals.  Aquarius reports the composite grade
comprising Pt+Pd+Rh+Au (gold), the Pt, Pd and Rh being the most economic        
platinoids in the UG2 Reef.                                                     
P&SA1          Pooling & Sharing Agreement between AQPSA and RPM Ltd on Kroondal
P&SA2          Pooling & Sharing Agreement between AQPSA and RPM Ltd on Marikana
R         South African Rand                                                    
RK1       Consortium comprising Aquarius Platinum (SA) (Corporate Services)     
(Pty) Limited (ASACS), GB Mining and Exploration (SA) (Pty) Limited (GB) and    
Sylvania South Africa (Pty) Ltd (SLVSA)                                         
ROM       Run of Mine.  The ore from mining which is fed to the concentrator    
plant.  This is usually a mixture of UG2 ore and waste.                         
RPM       Rustenburg Platinum Mines Limited                                     
TKO       TKO Investment Holdings Limited                                       
Ton       1 Metric tonne (1 000kg)                                              
UG2 Reef       A PGE bearing chromite layer within the Critical Zone of the     
Bushveld Complex                                                                
$         United States Dollars                                                 
Z$        Zimbabwe Dollar                                                       
For further information please visit  www.aquariusplatinum.com  or contact:     
In Australia:                                                                   
Willi Boehm / Anne Cully                                                        
Aquarius Platinum Corporate Services Pty Ltd                                    
+61 (0)8 9367 5211                                                              
In the United Kingdom:                                                          
Alex Buck                                                                       
BuckBias Limited                                                                
+44 (0)7392 740 452                                                             
In South Africa:                                                                
Gert Ackerman                                                                   
Aquarius Platinum (South Platinum) (Pty) Ltd                                    
+27 (0)14 536 4001                                                              
Charmane Russell                                                                
Russell & Associates                                                            
+27 (0)11 880 3924                                                              
Date: 26/04/2006 03:37:04 PM Produced by the JSE SENS Department                
                                                                                
                                                                                
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: