Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Thu 6 Jul 2006, 15:51 DRDGold - High grade zine structures taking shape
DRD
 DRDD                                                                            
DRDGold - High grade zine structures taking shape at Tolukuma Gold Mine         
DRDGOLD LIMITED                                                                 
(Incorporated in the Republic of South Africa)                                  
(Registration number 1895/000926/06)                                            
ARB number 086 277 616                                                          
JSE trading symbol: DRD                                                         
ISIN Code: ZAE000058723                                                         
Issuer code: DUSM                                                               
Nasdaq trading symbol: DROOY                                                    
ASX trading symbol: DRD                                                         
("DRDGOLD" or "the Company")                                                    
HIGH GRADE ZINE STRUCTURES TAKING SHAPE AT TOLUKUMA GOLD MINE                   
Tolukuma Gold Mine ("TGM") is a mining operation based in Papua New Guinea.     
TGM is owned by Emperor Mines Limited, a company registered in Australia and    
listed on the Australian Stock Exchange in which DRDGOLD hold 79.7% through     
its wholly owned subsidiary DRD (Offshore) Limited, a company registered in     
the Isle of Man.                                                                
Exploration development and underground diamond drilling at TGM has continued   
to intersect high grade gold mineralisation on the Zine Structure as well as    
in a newly discovered splay off the Zine structure. The Zine Structure is now   
being developed in two drives on the 1525m RL and 1495m RL levels               
respectively. To date more than 140m of strike length of the Zine Structure     
has intersected high grade mineralisation on 1525m level and 30m of strike      
length on 1495m level. An exploration drive along the new Zine Splay            
structure has intersected 97 m of mineralised strike length. The sampling       
results from this development are shown below.                                  
Development Level        Strike Length (m)  Width (m) g/t Au*  g/t Ag*          
Zine vein 1495 Zone 1    30                 0.8       84.6     129.7            
Zine vein 1525 Zone 1    50                 0.7       37.4     115.5            
Zine vein 1525           14                 0.4       1.3      22.7             
Zine vein 1525 Zone 2    80                 1.4       90.0     143.3            
Zine 1525 Splay          97                 0.5       44.6     96.3             
* Values are uncut                                                              
A significant feature has been the discovery of the above mentioned             
mineralised splay structure off the main Zine vein structure, trending in a     
south easterly direction. This discovery is very significant being the first    
high grade mineralised vein to be found extending eastwards from the known      
vein array that has been mined at Tolukuma. It indicates the potential for an   
entirely new mineralised corridor to the east, as well as a new internal        
target area along the potential north west extension.                           
Zone 1 on 1495 level and Zone 2 on 1525 level both remain open to the south     
whilst the newly discovered splay vein is open to the south east. Diamond       
drilling has also intersected the Zine vein some 100m south of current          
development in hole TU071 and some 160m down dip in hole TU073 both of which    
returned similar styles of mineralisation.                                      
The following table lists the underground diamond drilling results from the     
main Zine and Zine Splay structures.                                            
Hole No     Intersection (down hole & uncut)    Core Recovery   RL              
                                                %                               
TU069       1.3m @ 1.1 g/t Au & 3.0 g/t Ag      100             1210            
TU070       2.5m @ 1.7 g/t Au & 6 g/t Ag        60              1488            
TU071       0.3m @ 56.8 g/t Au and 20.6 g/t Ag  31              1542            
            0.8m @ 4.1 g/t Au and 158 g/t       50              1534            
            Ag                                                                  
TU072       2.4m @ 2.9 g/t Au and 4.2 g/t Ag    61              1610            
TU073       2.9m @ 21.2g/t Au & 51.9 g/t Ag     98              1362            
TU075       1.6m @ 13.8 g/t Au and 40.1 g/t Ag  60              1419            
Due to the exceptionally soft and clay rich nature of the Zine ore body, and    
the possibility of high water pressures encountered in the Zine vein, drill     
results to date are affected significantly by poor core recovery. This          
commonly results in the reported drill intersection significantly under         
calling the actual mineralisation intersected by exploration development.       
Similar to many other high grade ore bodies it is often a case of "drill for    
structure, drive for grade."                                                    
The continued success of the underground development and diamond drilling       
exploration is confirmation that the Zine mineralised vein structure and        
associated splay are likely to host a significant high grade, low               
sulphidation ore body. Of particular importance is the close proximity of       
these discoveries to existing mine infrastructure which will allow their        
speedy incorporation into the mining plan. Development has commenced on 4       
levels and it is anticipated that the mineralised structure will contribute     
to production in the December 06 quarter.                                       
Currently two underground rigs are conducting step out drilling whilst a 3rd    
rig is being shipped to the mine to expedite the resource infill drill          
program.                                                                        
Johannesburg                                                                    
06 July 2006                                                                    
Date: 06/07/2006 03:51:08 PM Produced by the JSE SENS Department                
                                                                                
                                                                                
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: