Wed 16 Aug 2006, 14:00 Uranium One - Results of feasibility study on the
SXR
 SXR                                                                             
Uranium One -  Results of feasibility study on the Modder East project of its   
               Aflease Gold subsidiary                                          
SXR Uranium One Inc                                                             
Share code: SXR                                                                 
Isin: CA87112P1062                                                              
26 Wellington Street East, Suite 820                                            
Toronto, Ontario M5E 1S2                                                        
Trading Symbol:  SXR - Toronto Stock Exchange, Johannesburg Stock Exchange      
NEWS RELEASE                                                                    
August 16, 2006                                    Toronto, Ontario             
Uranium One Announces Results of Feasibility Study on the Modder East Project   
of its Aflease Gold subsidiary                                                  
Toronto, Ontario and Johannesburg, South Africa - sxr Uranium One Inc.          
("Uranium One") reports that Aflease Gold Limited ("Aflease Gold") has          
announced the results of the feasibility study conducted by Turgis Consulting   
(Pty) Ltd ("Turgis") and independently audited by SRK Consulting (South Africa) 
(Pty) Ltd ("SRK") on the Modder East Gold Project ("Modder East") of its        
approximately 75% owned Aflease Gold subsidiary. Modder East is located         
approximately 30km east of Johannesburg, South Africa.                          
Highlights of the Modder East feasibility study include:                        
*    The project is financially robust and technically viable                   
*    The first phase of Modder East will target a Probable Reserve estimated at 
     1.07 million ounces of gold contained within 6.68 million tonnes of ore at 
an average head grade of 5.00g/t                                           
*    The first gold pour is scheduled for Q3 2009                               
*    Production at steady state (2010 to 2015) is expected to average           
     approximately 110,000 ounces of gold per annum                             
*    Average cash operating cost is US$217/oz                                   
*    The first phase of the project has an operational life of 10 years         
*    As at June 1, 2006, the pre-finance, after-tax project cash flows yield an 
     IRR of 31% and an NPV at a discount rate of 0% of US$156.9 million and an  
NPV at a discount rate of 8% of US$74.0 million                            
*    Project payback from commencement of mine construction is estimated to be  
     4.5 years and is expected to be less than 2 years from the start of on-    
     reef development.                                                          
The Modder East project encompasses a shallow underground mine with a dedicated 
gold treatment facility with a production capacity of 70,000 tonnes per month.  
The mine is expected to deliver 6.68 million tonnes of ore to the plant over a  
10 year period at an average mill head grade of 5.00g/t of gold, producing      
approximately 948,290 ounces of gold during this period. The mine plan has been 
developed by applying a one metre mining cut to all areas. Mining will take     
place between 300 metres and 530 metres below surface.                          
The feasibility study has used a base case gold price of US$629/oz and an       
exchange rate of US$1.00: ZAR6.585. The analysis has been completed in real     
terms, and the valuation date is June 1, 2006.                                  
In light of the positive results of the feasibility study, the Aflease Gold     
board has approved the full implementation of the project.                      
Neal Froneman, CEO of Aflease Gold, commented:  "The results of the feasibility 
study have confirmed the high margin nature of Modder East.  The initial phase  
of construction is proceeding well and we are looking forward to bringing the   
mine into production.  This is a significant commitment as it will be the first 
new gold mine in the East Rand in 28 years. We will also continue to delineate  
additional Kimberley Reef resources in the project area for phase 2 with a view 
to either extending the life of the mine or increasing gold production."        
Modder East Project Overview                                                    
The Modder East Project is located approximately 30 km East of Johannesburg in  
the Gauteng Province, South Africa.  Aflease Gold will mine the Black Reef at a 
depth of 300 metres below surface and the UK9a Kimberley Reef at depths of      
between 300 metres and 530 metres below surface.                                
The company completed a pre-feasibility study in January 2004, which returned   
favorable results.  Additional exploration was carried out in the project area  
in 2004 and 2005.  The full feasibility study was completed on May 19, 2006 and 
revised in June/July 2006.                                                      
Mineral Resources and Reserves                                                  
Aflease Gold carried out an extensive exploration program in the project area.  
From this comprehensive sampling base, a Mineral Resource Estimate was prepared 
by Peter Camden-Smith of Camden Geoserve and Charles Muller of Global Geo       
Services (Pty) Ltd. Peter Camden-Smith has been involved in the Modder East     
Project since 2001 and Charles Muller has been involved in the project since    
2003. All resources were subsequently audited by SRK. The estimates were based  
on a three dimensional block model with grades interpolated using geo-          
statistical methods.                                                            
Aflease Gold published a revised Mineral Resource for the Modder East project   
on February 13, 2006, declaring a gold resource of 2.01 million ounces of gold  
in the indicated category and 1.02 million ounces of gold in the inferred       
category. Table 1 below summarizes the previously released resource estimate by 
category as audited by SRK. The Mineral Resources were determined using a gold  
price of US$430/oz and an exchange rate of US$1.00: ZAR6.49.                    
Table 1 - SRK Audited Mineral Resource Estimate for Modder East (February 13,   
2006)                                                                           
                           MINERAL RESOURCES                                    
                             Tonnage     Cut-off   Au Grade   Contained         
                                           Grade                   Gold         
(thousands)     (cmg/t)  (g/tonne)       (koz)         
Indicated                                                                       
Black Reef (BPLZ) +            5,720         167       6.07       1,120         
BF(1)                                                                           
Channel Facies                15,200         379       1.32         650         
Kimberley UK9a Reef            1,350         199       5.47         240         
Total Measured &              22,270                   2.79       2,010         
Indicated Resources                                                             
Inferred                                                                        
BPLZ + BF (1)                    470         167       3.31          50         
Kimberley UK9a Reef            2,500         199       5.00         400         
Kimberley UK5a Reef            9,700         496       1.82         570         
Total Inferred                12,670                   2.50       1,020         
(1)  BPLZ - Buckshot Pyrite Leader Zone/BF-Blanket Facies                       
Notes:                                                                          
1.   The Mineral Resources have been reported in accordance with the            
classification criteria of the South African Code for Reporting of Mineral 
     Resources and Mineral Reserves (the SAMREC Code).                          
2.   The Mineral Resources were estimated by Mr. Charles Muller of Global Geo   
     Services (Pty) Ltd. and reported to a cut-off grade of 167 cmg/t (in the   
case of the BPLZ and Blanket Facies), 379 cmg/t (in the case of the        
     Channel Facies, 199 cmg/t (in the case of the UK9a) and 496 cmg/t (in the  
     case of the UK5). The Resource was audited by Dr Mike Harley of SRK.       
3.   Mineral Resources are not Mineral Reserves and do not have demonstrated    
economic viability.                                                        
4.   The Indicated Resources detailed in Table 1 have been converted into a     
     Probable Reserve, as shown in Table 2, through a process of mine planning, 
     economic modeling and the application of appropriate modifying factors and 
is reported as delivered to the plant.                                     
Table 2 - SRK Audited Mineral Reserve Estimate for Modder East (June 1, 2006)   
PROBABLE MINERAL RESERVES                                                       
                                         Tonnage     Au Grade  Contained        
Gold        
                                     (thousands)        (g/t)      (koz)        
Probable                                                                        
BPLZ Mining                                5,150         5.28        890        
Kimberley UK9a Reef                        1,420         3.97        180        
Total Reserves                             6,680         5.00      1,070        
Notes:                                                                          
1.   The Mineral Reserve was estimated by Andrew Pooley of Turgis and audited   
by HG (Wally) Waldeck of SRK.                                              
2.   Tonnes and grade are stated on the basis of delivery to the plant.         
3.   Mineral Reserves are included in Mineral Resources                         
Reconciliation of Reserve Estimates                                             
In its News Release of February 13, 2006, Aflease Gold had presented Probable   
Mineral Reserves for the Modder East project of 10.1Mt at an average grade of   
4.02g/t.  The reduction in Mineral Reserves as presented in this News Release   
is based on a different mining philosophy which incorporates greater confidence 
in the geological block model, modifying factors used to convert Mineral        
Resources to Mineral Reserves, the level of accuracy of the feasibility study   
and engineering assumptions made.  SRK is satisfied that this reduction in      
Mineral Reserves, given the changed mining philosophy and greater confidence    
associated with the feasibility study, is reasonable.                           
Mine Design                                                                     
The reefs will be accessed by a decline from surface, developed into the        
footwall of both horizons and will be developed using trackless drilling,       
loading and hauling. Mine personnel will access the workings via a vertical     
ventilation shaft. The mining method will be traditional South African narrow   
reef breast mining with face cleaning using scraper winches. Thirty tonne haul  
trucks will be used to transport ore, loaded from stope chutes, to a central    
silo system. Dedicated fifty tonne haul trucks will transport the ore to        
surface.                                                                        
The gold plant planned for Modder East is based on a standard carbon-in-leach   
gold recovery process. The plant is designed to treat 840,000 tonnes of ore per 
annum, yielding approximately 110,000 oz of gold annually at steady state. The  
planned metallurgical recoveries are 88% for the Black Reef (BPLZ facies) and   
95% for the UK9a Reef.                                                          
Project Status                                                                  
The Boards of Uranium One and of Aflease Gold decided to fast-track the project 
and the initial stage of construction began on May 18, 2006.  A budget of       
US$3.04 million (ZAR20 million) was allocated to cover the following            
activities:                                                                     
-    Site clearing and portal excavation                                        
-    Selection of basic services and surface infrastructure                     
-    Acquisition of trackless equipment                                         
-    Selection and training of workers                                          
The portal excavation and dam construction are well advanced and the areas for  
the offices, workshops, stores and waste dump have been prepared. The trackless 
equipment has been secured. The supply of water to the mine has been sourced    
from the local municipality. The development team and associated support team   
have been recruited and training is in progress.                                
The project is on schedule for the commencement of gold production in Q3 2009.  
Operating Costs                                                                 
The operating costs have been prepared using zero-based costing techniques      
(i.e. without factoring-in historical costs) assuming reasonable consumable     
consumption levels and are in January 1, 2006 money terms.                      
The average operating cost for the life of mine is US$30.82 per tonne of ore    
milled in real terms including rehabilitation costs and excluding envisaged     
royalties and tax, reflecting the low cost nature of this shallow mine. In line 
with the company"s accounting policy all footwall development and associated    
infrastructure has been capitalized at an amount of US$36.3 million. Conversion 
of the capitalized development costs into an operating cost increases the       
average life of mine cost to US$34.31 per tonne of ore milled, which is         
reasonable when compared to other narrow reef operations.                       
Capital Costs                                                                   
Capital costs have been estimated at the appropriate level with the back up of  
budgetary quotes from major equipment suppliers. The capital estimate for the   
plant is based on the use of new equipment. The capital costs were estimated in 
South African Rand on January 1, 2006, and converted to US dollars at           
US$1.00=ZAR6.585.  The project construction capital expenditure totals US$58.5  
million.  Working capital comprising of pre-production costs and footwall       
development is US$40.9 million. Contingencies catering for the construction     
capital expenditure as well as the working capital expenditure total US$8.5     
million. In addition, the ongoing capital costs for the life of mine have been  
estimated at US$6.5 million.   The data is shown in Tables 3 and 4 below:       
Table 3: Modder East Project - capital expenditure estimates                    
Capital Item                 Units            Project    Ongoing        Total   
                                             Capital    Capital      Capital    
requirements    
Surface engineering          (US$"000)         15,155        626       15,781   
Capital Development          (US$"000)         34,885      1,441       36,327   
Mining equipment             (US$"000)          8,857        366        9,223   
Replacement equip            (US$"000)              0      2,743        2,743   
Shaft sinking                (US$"000)          9,037        373        9,410   
Underground engineering      (US$"000)          1,890         78        1,968   
Process Plant                (US$"000)         19,242        795       20,037   
Tailings dam                 (US$"000)          2,565          0        2,565   
Preproduction costs          (US$"000)          5,984          0        5,984   
Environmental (Initial Sum)  (US$"000)            346          0          346   
Design                       (US$"000)          1,422          0        1,422   
Contingencies                (US$"000)          8,461         53        8,513   
Total Modder East            (US$"000)        107,844      6,476      114,320   
Table 4:   Modder East Project - estimated closure costs                        
Activities                                                             Cost     
provision     
                                                                  (US$"000s     
                                                                as at 2006)     
Operational costs per annum                                                     
Proposed operational budget from 2009 (environmental)                    59     
Annual provision for SLP initiatives                                    100     
Ongoing capital costs                                                           
EMPR update, specialist studies and water use licence                   137     
application                                                                     
Closure liability                                                               
Liability as determined by Study                                      1,950     
SRK estimated additional liability (post closure monitoring)            296     
Total estimated closure liability                                     2,246     
Provision for closure at end of life of mine in Trust Fund              186     
Outstanding provision to be funded over life of mine                  2,060     
Financial Evaluation                                                            
The project has been valued in real terms as at June 1, 2006. As at that date   
the pre-finance after-tax cash flows yield an IRR of 31%.  At a real discount   
rate of 0% the project is estimated to yield an after-tax NPV of US$156.9       
million and at a real discount rate of 8%, the project is estimated to yield an 
after-tax NPV of US$74.0 million. Project payback from commencement of mine     
construction is estimated to be 4.5 years and is expected to be less than 2     
years from the start of on-reef development.  Table 5 below summarizes the      
results of the feasibility study:                                               
Table 5: Modder East Project - nominal cash flow model                          
Financial Year Units        Totals   2006   2007   2008   2009   2010   2011    
                                      (1)                                       
Project Year             /Averages      1      2      3      4      5      6    
Tonnes Milled  (kt)          6,680      0      0     36    491    767    845    
Head Grade     (g/t)           5.0    0.0    0.0   13.6    8.0    4.8    3.3    
Metallurgical  (%)             88%     0%     0%     0%    87%    87%    88%    
Recovery                                                                        
Recovered Gold (koz)           948      0      0      0    123    102     78    
Gold Price     (US$/oz)        721    629    642    654    667    681    694    
Exchange Rate  (ZAR:US$)             6.59   6.84   7.11   7.39   7.68   7.98    
Sales Revenue  (US$m)        596.5      -      -      -   77.5   64.5   49.3    
Sales          (US$m)         87.6                         4.8    5.3    5.1    
Escalation                                                                      
Less Mineral   (US$m)       (31.2)                       (2.9)  (2.6)  (2.2)    
Royalties                                                                       
Attributable   (US$m)        652.9                        79.4   67.2   52.2    
Revenue                                                                         
Total Working  (US$m)      (256.7)      -      -  (0.2)                         
Costs                                                   (21.5) (25.9) (26.2)    
Mining         (US$m)      (139.4)      -      -      -  (9.4)                  
                                                               (14.8) (16.3)    
Processing     (US$m)       (42.9)      -      -      -  (3.4)  (4.7)  (5.1)    
Administration (US$m)       (37.4)      -      -  (0.2)  (2.3)  (4.0)  (3.6)    
(1)                                                                             
Operating Cost (US$m)       (35.0)      -      -      -  (0.9)  (1.9)  (2.6)    
Escalation                                                                      
Working        (US$m)        (2.1)      -      -      -  (5.5)  (0.5)    1.3    
Capital                                                                         
Changes                                                                         
Operating      (US$m)        397.6      -      -  (0.2)   58.0   41.4   26.2    
Profit                                                                          
Tax Deductible (US$m)      (121.0)                                     (4.9)    
Allowances                         (10.4) (21.6) (39.5) (15.6) (10.2)           
Tax Liability  (US$m)       (88.9)      -      -      -      -      -  (4.7)    
Capital        (US$m)      (121.0)                                     (4.9)    
Expenditure                        (10.4) (21.6) (39.5) (15.6) (10.2)           
Project        (US$m)      (107.8)                              (9.1)  (4.0)    
                                   (10.4) (21.2) (37.9) (14.4)                  
Ongoing        (US$m)        (6.5)      -      -      -  (0.3)  (0.4)  (0.4)    
Capital        (US$m)        (6.7)      -  (0.4)  (1.5)  (0.9)  (0.8)  (0.5)    
escalation                                                                      
Final Net Free (US$m)        186.3                        42.2   31.1   16.5    
Cash - Nominal                     (10.4) (21.6) (39.7)                         
Final Net Free (US$m)        156.9                        39.8   28.7   14.9    
Cash - Real                        (10.4) (21.2) (38.2)                         
Cash Operating (US$/oz)        231      -      -      -    122    229    318    
Costs - Real                                                                    
Financial Year Units        Totals   2012   2013   2014   2015   2016   2017    
Project Year             /Averages      7      8      9     10     11     12    
Tonnes Milled  (kt)          6,680    834    832    794    840    658    431    
Head Grade     (g/t)           5.0    4.9    5.6    6.0    4.5    3.7    4.1    
Metallurgical  (%)             88%    88%    89%    88%    88%    88%    91%    
Recovery                                                                        
Recovered Gold (koz)           948    112    133    138    107     69     52    
Gold Price     (US$/oz)        721    708    723    737    752    767    782    
Exchange Rate  (ZAR:US$)             8.29   8.62   8.96   9.31   9.67  10.05    
Sales Revenue  (US$m)        596.5   70.8   83.7   86.7   67.4   43.1   32.6    
Sales          (US$m)         87.6    8.9   12.4   14.9   13.2    9.5    7.9    
Escalation                                                                      
Less Mineral   (US$m)       (31.2)  (3.4)  (4.3)  (4.9)  (4.1)  (2.8)  (2.3)    
Royalties                                                                       
Attributable   (US$m)        652.9   76.3   91.8   96.7   76.5   49.8   38.2    
Revenue                                                                         
Total Working  (US$m)      (256.7)                                              
Costs                              (29.8) (29.6) (29.1) (28.1) (27.4) (24.0)    
Mining         (US$m)      (139.4)                                              
                                   (16.1) (16.1) (16.1) (16.3) (16.0) (12.6)    
Processing     (US$m)       (42.9)  (4.8)  (4.9)  (4.9)  (5.0)  (4.9)  (3.8)    
Administration (US$m)       (37.4)  (3.9)  (3.6)  (3.4)  (3.7)  (3.4)  (3.4)    
(1)                                                                             
Operating Cost (US$m)       (35.0)  (3.1)  (3.7)  (4.2)  (4.9)  (5.3)  (4.8)    
Escalation                                                                      
Working        (US$m)        (2.1)  (1.9)  (1.3)  (0.4)    1.7    2.2    0.6    
Capital                                                                         
Changes                                                                         
Operating      (US$m)        397.6   46.6   62.4   67.8   48.6   22.5   14.4    
Profit                                                                          
Tax Deductible (US$m)      (121.0)  (6.4)  (5.5)  (3.4)  (1.1)  (1.1)  (1.0)    
Allowances                                                                      
Tax Liability  (US$m)       (88.9)                              (6.9)  (4.1)    
                                   (13.3) (19.2) (21.9) (16.0)                  
Capital        (US$m)      (121.0)  (6.4)  (5.5)  (3.4)  (1.1)  (1.1)  (1.0)    
Expenditure                                                                     
Project        (US$m)      (107.8)  (4.0)  (4.3)  (0.9)  (0.5)  (0.5)  (0.5)    
Ongoing        (US$m)        (6.5)  (1.7)  (0.4)  (1.9)  (0.4)  (0.4)  (0.4)    
Capital        (US$m)        (6.7)  (0.7)  (0.7)  (0.5)  (0.2)  (0.2)  (0.2)    
escalation                                                                      
Final Net Free (US$m)        186.3   26.7   37.5   42.4   31.3   14.3    9.1    
Cash - Nominal                                                                  
Final Net Free (US$m)        156.9   23.7   32.7   36.2   26.2   11.8    7.3    
Cash - Real                                                                     
Cash Operating (US$/oz)        231    221    185    177    233    354    382    
Costs - Real                                                                    
The administration cost includes a provision for separation benefits during the 
life of mine of US$13 million, which should be excluded from the calculation of 
unit operating cost.  The cash operating costs would be US$217 per ounce        
excluding the separation benefits of US$13 million.                             
The numbers in the above table have been rounded, and any resulting             
discrepancies should not be regarded as material.                               
Sensitivity Analysis                                                            
The following tables show the NPV of the real cash flows as derived from the    
financial model for the project.  The tables illustrate that the project is     
neither capital nor operating cost sensitive. In summary they include the       
following:                                                                      
-    The variation in NPV with discount factors (Table 6)                       
-    The variation in NPV based on single parameter sensitivities (Table 7).    
     The sensitivity of the project to changes in gold price or head grade can  
be seen in the variation of revenue.  The sensitivity to variations in     
     operating cost and capital expenditure is also presented                   
-    The variation in NPV based on twin (revenue and operating expenditure)     
     sensitivities (Table 8)                                                    
-    The variation in NPV based on twin (gold price and exchange rate)          
     sensitivities (Table 9).                                                   
Table 6: Modder East Project - variation of Real NPV with discount factors      
Discount                              NPV (US$m)                                
Factor                                                                          
          Valuation Basis                Alternative Scenarios                  
(%)           US$629/oz Au     US$500/oz Au    US$629/oz Au     US$758/oz Au    
          ZAR6.585=US$1.00  ZAR7.00=US$1.00 ZAR7.00=US$1.00  ZAR7.00=US$1.00    
0%                   156.9             92.9           170.3            246.2    
2%                   130.2             75.1           142.2            207.8    
4%                   108.0             60.2           118.8            175.8    
6%                    89.5             47.9            99.3            149.1    
8%                    74.0             37.6            82.9            126.6    
10%                   61.0             28.9            69.1            107.6    
12%                   49.9             21.7            57.4             91.6    
Table 7: Modder East Project - Real NPV, single parameter sensitivity           
Sensitivity Range -      -30%   -20%    -10%     0%    10%    20%     30%       
Revenue                                                                         
Sensitivity Range -      -15%   -10%     -5%     0%     5%    10%     15%       
Working Costs                                                                   
Sensitivity Range -      -15%   -10%     -5%     0%     5%    10%     15%       
Capital                                                                         
Currency               (US$m) (US$m)  (US$m) (US$m) (US$m) (US$m)  (US$m)       
Variation in NPV at 0%                                                          
DCF                                                                             
Revenue                  37.7   77.8   117.5  156.9  196.7  235.3   273.9       
Total Working Costs     204.8  189.2   172.5  156.9  141.3  124.9   109.1       
Capital                 178.9  172.0   165.1  156.9  149.9  141.9   134.9       
Variation in NPV at 8%                                                          
DCF                                                                             
Revenue                   3.7   27.6    51.0   74.0   97.2  119.3   141.5       
Total Working Costs     100.8   92.2    82.7   74.0   65.3   56.1    47.2       
Capital                  92.8   86.9    80.9   74.0   67.9   61.1    54.7       
Table 8: Modder East Project - Real NPV sensitivity, varying twin parameter at  
8% discount                                                                     
NPV (US$m)                                 Revenue Sensitivity                  
-30%   -20%   -10%     0%     10%    20%     30%   
                      -15%   18.0   41.5   64.7   87.3   110.1  132.2   154.4   
                      -10%   13.5   37.1   60.3   82.7   105.8  127.9   150.1   
                       -5%    8.9   32.7   55.4   78.4   101.5  123.6   145.8   
TWC Sensitivity         0%    3.7   27.6   51.0   74.0    97.2  119.3   141.5   
                        5%  (1.2)   23.1   46.6   69.7    92.9  115.0   137.2   
                       10%  (6.2)   18.6   42.1   65.3    88.6  110.7   132.9   
                       15%  (11.3)   13.9   37.7   61.0    83.9  106.4   128.6  
Table 9: Modder East - Real NPV sensitivity, varying twin parameter at 8%       
discount                                                                        
NPV (US$m)                                 Gold Price Sensitivity               
                                         503     535      566     598      629  
-20.0%  -15.0%   -10.0%   -5.0%     0.0%  
                     5.597 -15.0%      2.8    14.8     25.9    37.6     48.5    
Exchange                                                                        
Rate                                                                            
Sensitivity                                                                     
                     5.927 -10.0%     13.3    24.4     36.1    47.0     57.9    
                     6.256  -5.0%     21.9    33.6     44.4    55.3     66.7    
                     6.585   0.0%     29.9    41.1     52.0    63.3     74.0    
6.914   5.0%     37.0    47.9     59.2    70.0     80.9    
                     7.244  10.0%     43.2    54.6     65.3    76.1     87.4    
                     7.573  15.0%     48.9    60.1     70.8    82.2     92.8    
NPV (US$m)                            Gold Price Sensitivity                    
660      692     723      755           
                                       5.0%    10.0%   15.0%    20.0%           
                     5.597 -15.0%    59.4     70.9    81.6     92.3             
Exchange                                                                        
Rate                                                                            
Sensitivity                                                                     
                     5.927 -10.0%    69.3     80.0    90.7    102.3             
                     6.256  -5.0%    77.4     88.3    99.7    110.3             
6.585   0.0%    85.0     96.2   106.8    117.4             
                     6.914   5.0%    92.1    102.7   113.3    123.9             
                     7.244  10.0%    98.0    108.6   119.2    129.8             
                     7.573  15.0%   103.4    114.0   124.6    135.2             
Mining Rights                                                                   
Aflease Gold is in possession of an old order mining right (mining licence      
ML15/2004), which is valid until April 29, 2009.  Aflease Gold is compiling an  
application for the conversion of its old order mining right to a new order     
mining right in terms of the Minerals and Petroleum Resources Development Act   
No 28 of 2002 ("MPRDA") and expects to submit that application before the end   
of 2006.  It is expected that the new order mining right will be granted within 
the available time period.                                                      
A temporary water use licence has been approved for the development of the      
portal. An application for the required permanent water use licence will be     
submitted before the temporary water use licence expires.                       
The surface rights for the project have been secured and accommodate the Modder 
East project as contemplated in the feasibility study.                          
Qualified Person                                                                
HG (Wally) Waldeck, a Partner with SRK, is the Qualified Person for the         
purposes of NI 43-101 and has audited all information relating to the           
feasibility study and has reviewed the contents of this news release.           
About sxr Uranium One                                                           
sxr Uranium One Inc. is a Canadian uranium and gold resource company with a     
primary listing on the Toronto Stock Exchange and a secondary listing on the    
Johannesburg Stock Exchange. The Corporation owns the Dominion Reefs Uranium    
Mine in South Africa and the Honeymoon Uranium Project in South Australia, as   
well as a number of exploration projects. The Corporation holds an approximate  
75% interest in Aflease Gold Limited, which owns the Modder East Gold Project   
in South Africa. Through a joint venture with Pitchstone Exploration Ltd., the  
Corporation is also engaged in uranium exploration activities in the Athabasca  
Basin of Saskatchewan.                                                          
About Aflease Gold                                                              
Aflease Gold Limited was formed on January 23, 2006 through the reverse         
takeover of Sub Nigel Gold Mining Company Ltd. by New Kleinfontein Mining       
Company Ltd. a wholly owned subsidiary of Aflease Gold and Uranium Resources    
Ltd.  The company is listed on the Johannesburg Stock Exchange and is owned as  
to approximately 75% by sxr Uranium One Inc.                                    
For further information please contact:                                         
Neal Froneman            Chris Sattler               Robert van Niekerk         
Chief Executive Officer  Vice President, Investor    Executive Vice President:  
Tel: + 27 11 482 3605    Relations                   Aflease Gold               
                         Tel: +1 416 350 3657        Tel: +27 11 814 4290       
Forward-looking statements: Certain of the statements made herein, including    
any information as to the Corporation"s future financial or operating           
performance, may be forward-looking and subject to important risk factors and   
uncertainties, many of which are beyond the Corporation"s ability to control or 
predict. Forward-looking statements are necessarily based on a number of        
estimates and assumptions that are inherently subject to significant business,  
economic and competitive uncertainties and contingencies.  Known and unknown    
factors could cause actual results to differ materially from those projected in 
the forward-looking statements. Such factors include, among others: gold price  
volatility; impact of any hedging activities, including margin limits and       
margin calls; discrepancies between actual and estimated production, between    
actual and estimated reserves and resources and between actual and estimated    
metallurgical recoveries; changes in national and local government legislation, 
taxation, controls, regulations and political or economic developments in South 
Africa or other countries in which the Corporation does or may carry on         
business in the future; risks of sovereign investment; the speculative nature   
of gold exploration and development, including the risks of obtaining necessary 
licenses and permits; dilution; competition; loss of key employees; additional  
funding requirements; and defective title to mineral claims or property. In     
addition, there are risks and hazards associated with the business of gold      
exploration, development and mining, including, among others, environmental     
hazards, industrial accidents, unusual or unexpected formations, pressures,     
cave-ins, flooding and gold bullion losses (and the risk of inadequate          
insurance or inability to obtain insurance, to cover these risks).              
Accordingly, readers should not place undue reliance on forward-looking         
statements. The Corporation undertakes no obligation to update publicly or      
release any revisions to forward-looking statements to reflect events or        
circumstances after the date of this document or to reflect the occurrence of   
unanticipated events. Investors are advised to refer to competent persons       
reports on the Corporation"s material properties for detailed information with  
respect to such properties, which information is subject to the qualifications  
and notes set forth therein. This presentation uses the terms "indicated"and    
"inferred"resources as defined in accordance with the SAMREC Code. United       
States investors are advised that while these terms are recognized and required 
by South African regulations, the SEC does not recognize them. Investors are    
cautioned not to assume that all or any part of the mineral deposits in these   
categories will ever be converted into reserves. In addition, "inferred         
resources" have a great amount of uncertainty as to their existence and         
economic and legal feasibility and it cannot be assumed that all or any part of 
an inferred mineral resource will be ever be upgraded to a higher category.     
Investors are cautioned not to assume that all or any part of an inferred       
resource exists or is economically or legally mineable. Mineral resources are   
not mineral reserves and do not have demonstrated economic viability.           
Scientific and technical information contained herein has been reviewed by Mr.  
H.G. (Wally) Waldeck (PrEng (ECSA), FSAIMM, AMAMMSA, BSc(Eng), (MBA), Partner   
and Principal Mining Engineer with SRK.                                         
Date: 16/08/2006 02:00:40 PM Produced by the JSE SENS Department                
                                                                                
                                                                                
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: