Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Mon 4 Dec 2006, 16:20 sxr Uranium One Inc - Increase in resources and re
SXR
 SXR                                                                             
sxr Uranium One Inc - Increase in resources and reserves                        
sxr Uranium One Inc                                                             
(Formerly Southern Cross Resources Inc.)                                        
(Incorporated in Canada)                                                        
(Registration number: 15096422420)                                              
Share code on the JSE: SXR & ISIN: CA87112P1062                                 
Share code on the TSX: SXR & ISIN: CA87112P1062                                 
("Corporation")                                                                 
sxr Uranium One Inc.                                                            
390 Bay Street, Suite 1610                                                      
Toronto, Ontario M5H 2Y2                                                        
Trading Symbol:  SXR - Toronto Stock Exchange, JSE Limited (Johannesburg stock  
exchange)                                                                       
NEWS RELEASE                                                                    
December 4, 2006                   Toronto, Ontario                             
Increase in Resources and Reserves at Aflease Gold"s Modder East                
and Sub Nigel Gold Projects, South Africa                                       
Toronto, Ontario and Johannesburg, South Africa - sxr Uranium One Inc. announced
today that its 71.6% owned Aflease Gold Limited ("Aflease Gold") affiliate has  
released an updated mineral resource and reserve statement for its Modder East  
Project and an updated resource statement for its Sub Nigel Project. The updated
statements show an increase in both resources and reserves at Modder East and an
upgrading of resources at Sub Nigel. The Modder East and Sub Nigel Projects are 
located in South Africa"s East Rand goldfields, 30km east and 35km east-        
southeast of the city of Johannesburg, respectively.                            
Modder East Project                                                             
The revised statement shows a reserve tonnage of 7.69Mt grading 5.54g/t for 1.37
million contained ounces of gold in the probable category. This represents a 28%
increase over the estimates contained in the August 16, 2006 Modder East        
feasibility study prepared by Turgis Consulting and audited by SRK Consulting   
(available on the Aflease Gold website www.afleasegold.com and on SEDAR). In    
addition, the revised statement shows a resource tonnage of 22.57Mt grading     
3.31g/t for 2.40 million contained ounces of gold in the indicated category (a  
19% increase from the 2.01 million ounces reported previously) and 13.32Mt      
grading 2.31g/t for 0.99 million contained ounces of gold in the inferred       
category (a 3% decrease from the 1.02 million ounces reported previously). The  
indicated resource tonnage at Modder East has remained essentially unchanged    
while the average grade has increased by 19% (from 2.79g/t to 3.31g/t). In all  
cases, mineral reserves and resources have been reported in accordance with the 
classification criteria of the South African Code for Reporting of Mineral      
Resources and Mineral Reserves (the SAMREC Code).                               
The increase in reserves and resources at Modder East reflects the results of   
the 2006 Phase II drilling program conducted on the property by Aflease Gold.   
The cut-off grades (Table 1 refers), gold price (US$430/oz) and exchange rate   
(US$1:R6.49) used in the assessment are the same as in the Modder East          
feasibility study. This was considered necessary to allow for a direct          
comparison to be made with the previous resource estimate, despite the recently 
improved outlook for the gold price going forward.                              
The main components of the Modder East Mineral Resource are:                    
-    The Black Reef Buckshot Pyrite Leader Zone (BPLZ).                         
-    The Black Reef Channel Facies (CF).                                        
-    The Blanket Facies (BF).                                                   
-    The UK9A Kimberley Reef.                                                   
-    The UK5A Kimberley Reef.                                                   
The Black Reef comprises three facies. At the top is the higher grade BPLZ,     
which averages 0.5 metres in width and is the primary mining target. The BPLZ is
a placer deposit, with gold present within a heavy mineral suite dominated by   
pyrite and hosted within a conglomerate. Continuity of mineralization in the    
target area has been confirmed, with the zone of mineralization clearly visible 
within drillhole cores. The BPLZ overlies the BF, a 1.3 metre thick quartzite   
which has not been targeted due to its very low gold grades. At the base of the 
Black Reef is the 3 metre thick, erosional CF. The Black Reef dips at around 3  
to the south.                                                                   
The UK9A is a narrow channel reef, commonly characterized by the presence of    
kerogen, either as lamina partings or as flyspeck carbon within the conglomerate
reef unit. The UK5A is a multi-stacked package of robust conglomerates. The     
reefs dip at around 12 to the south.                                            
The Black Reef is developed at approximately 300 metres below surface, while the
sub-cropping Kimberley (UK9A and UK5A) reefs reach depths of around 600 metres. 
The mineralized horizons are considered to be structurally simple and generally 
well understood, as a result of a long history of mining the underlying Main    
Reef on the East Rand and the selective mining of the UK9A at the adjacent      
Petrex operations.                                                              
The BPLZ resource estimate is based on diamond boreholes drilled by Aflease Gold
and the previous owners of the project Gencor, and declustered underground      
channel samples from the adjacent UC prospect previously operated by Petrex     
Mines ("Petrex"). The database consists of 51 drillholes (excluding deflections)
and 238 underground channel samples declustered (i.e. averaged) within 50m  50m 
squares from 16,694 sample points. The methodology employed in the resource     
estimation is similar to that applied in the previous resource estimate.        
The CF consists of a sequence of pyrite-rich quartzites, pebbly quartzites and  
conglomerates, is approximately 3m in thickness, and is separated from the      
overlying BPLZ by the BF. The CF is erosional into its footwall and estimates   
have been developed for the Channel Facies over the footprint of the mineralized
BPLZ that has been delineated.                                                  
Pillars remaining in the UC prospect area have been included in the resource    
estimate. The estimate is based on the declustered values obtained from Petrex  
as well as outlines of the remnants from Petrex plans. The pillars are all      
within the higher grade area close to the `Shoreline" feature, and are generally
surrounded by sampling data on all sides. Given the relative density of data,   
Ordinary Kriging has been applied rather than the Simple Kriging used in the    
other estimates.                                                                
In addition to the Black Reef, Aflease Gold has also delineated mineral         
resources on the UK9A and the UK5A reefs lying within the footwall of the Black 
Reef. A dataset consisting of 171,000 underground channel samples within stoping
and development on Grootvlei Mine immediately south of the Modder East project  
area is available as an analogue to the payshoot that has been intersected on   
Modder East.                                                                    
The estimation process for the Kimberley reefs is the same as that described    
above for the BPLZ, with 45 intersections (excluding deflections) being used in 
the estimate.                                                                   
As noted above, there has been an increase in reserve ounces at Modder East.    
With respect to the BPLZ, the increase resulted from the following factors:     
Borehole DD54, drilled in 2006, cut higher grade gold mineralization within an  
area of previously relatively lower grade beach facies material.                
Marginal, lower grade BPLZ material, which was included in the previous reserve 
estimate, has been removed from the November 2006 estimate. This is reflected by
a drop in the reserve tonnage.                                                  
The BPLZ was remodeled (i.e. domained) based on new sample data. In the previous
resource estimate (February 2006) the BPLZ was sub-divided into three domains.  
In the current estimate, the BPLZ has been subdivided into four distinct domains
based on metal accumulation and channel width distributions as indicated by the 
drillhole data. Notably, the higher grade beach facies, which forms the basis of
the reserve at Modder East, was modeled as a separate domain.                   
The increase in UK9A reserve ounces at Modder East was caused by a significant  
increase in indicated tonnes. This resulted from the upgrading of the main UK9A 
channel in the south of the prospect area, together with the smaller Kimberley  
channel in the east.                                                            
2006 Phase II drilling program                                                  
The Phase II exploration drilling program at Modder East was completed in July  
2006. Five holes were drilled to test the southerly continuity of the UK9A reef 
while one hole was drilled to confirm the northern margin of the BPLZ. Drillhole
DD54, sunk on the BPLZ, intersected higher grade gold mineralization (795cmg/t) 
thus confirming both the northern boundary of the mineralized envelop and the   
sedimentalogical model used to direct exploration on the Black Reef at Modder   
East.                                                                           
The five holes sunk on the UK9A (DD55, DD56, DD57, DD58 and DD59) confirmed the 
southward continuation of the gold mineralization, specifically the relatively  
higher grade central payshoot. Furthermore, a new potentially higher grade UK9A 
payshoot was identified near the southwest margin of the UC prospect area.      
Drillhole DD59, located near the southeast corner of the Modder East prospect   
area, unexpectedly cut BPLZ mineralization grading at up to 267cmg/t.           
Further drilling will be carried out at Modder East in 2007 (Phase III) in order
to:                                                                             
Test for higher grade extensions to the BPLZ outside the current resource       
envelope.                                                                       
Test the BPLZ in the vicinity of DD59 in order to delineate the extent of the   
mineralization intersected in the hole.                                         
Delineate more accurately the new UK9A payshoot identified near the southwest   
margin of the UC prospect area.                                                 
Resource and reserve statements for Modder East                                 
The revised mineral resource and reserve estimates for the Modder East Project  
are shown in Tables 1 and 2, respectively. The BPLZ and UK9A reefs have been    
modeled at a minimum mining width of 1m.                                        
Table 1. November 2006 Modder East resource statement - cut-offs as             
per February 2006                                                               
                     Tonnes  Grade    Metal   %          Actual                 
(Mt)    (g/t)    Content increase/  increase/              
                                      (Moz)   decrease   decrease               
                                              in ounces  in ounces              
                                              Nov 2006   (Moz)                  
vs Feb                            
                                              2006                              
Indicated                                                                       
(1) BPLZ+BF          6.46    6.35     1.32    18%        0.20                   
(2) Channel +BF      13.15   1.41     0.60    -8%        -0.05                  
(1) BPLZ pillars     0.27    8.33     0.07    na         0.07                   
(3) UK9A             2.69    4.76     0.41    71%        0.17                   
(4) UK5A                                                                        
SubTotal Indicated   22.57   3.31     2.40    19%        0.39                   
Inferred                                                                        
(1) BPLZ+BF          0.43    2.08     0.03    -40%       -0.02                  
(2) Channel +BF      1.06    2.60     0.09    na         0.09                   
(3) UK9A             2.43    4.09     0.32    -20%       -0.08                  
(4) UK5A             9.41    1.82     0.55    -4%        -0.02                  
SubTotal Inferred    13.32   2.31     0.99    -3%        -0.03                  
(1) Quoted at a cut-off of 167cmg/t                                             
(2) Quoted at a cut-off of 379 cmg/t                                            
(3) Quoted at a cut-off of 199 cmg/t                                            
(4) Quoted at a cut-off of 496 cmg/t                                            
Notes:                                                                          
The mineral resources have been reported in accordance with the classification  
criteria of the SAMREC Code.                                                    
The revised resource estimate was prepared by Charles Muller, B.Sc. (Hons),     
Pr.Sci.Nat., of Global Geo Services, an independent geoscience consultant to the
Corporation. Charles Muller is a qualified person for the purposes of NI 43-101.
The resource was audited by Mark Wanless of SRK Consulting.                     
In the opinion of SRK, the mineral resource classifications defined in the      
SAMREC code are materially similar to those defined in Standards on Mineral     
Resources and Reserves Definitions and Guidelines adopted by Canadian Institute 
of Mining, Metallurgy and Petroleum utilized by Canadian National Instrument 43-
101.                                                                            
Mineral resources are not mineral reserves and do not have demonstrated economic
viability.                                                                      
The indicated resources detailed in Table 1 have been converted into probable   
reserves, as shown in Table 2, through a process of mine planning, economic     
modeling and the application of appropriate modifying factors, and are reported 
as delivered to the plant.                                                      
Table 2. November 2006 Modder East reserve statement                            
             Tonnes   Grade    Metal    % increase   Actual                     
             (Mt)     (g/t)    Content  in ounces    increase                   
(Moz)    Nov 2006 vs  in ounces                  
                                        feasibility  (Moz)                      
                                        study                                   
Probable                                                                        
BPLZ+BF      5.18     6.43     1.07     20%          0.18                       
UK9a         2.51     3.72     0.30     67%          0.12                       
Total        7.69     5.54     1.37     28%          0.30                       
Probable                                                                        
Notes:                                                                          
The revised reserve statement was prepared by Clive Brown of Turgis Consulting  
and audited by Herbert (Wally) Waldeck of SRK Consulting. The probable mineral  
reserves have demonstrated profitability when included in a mine plan using     
industry accepted mining methods and a gold price of US$430 per ounce and an    
exchange rate of US$1.00:R6.49. Using these criteria, a pay limit was used to   
identify blocks of ground for mining. Within these blocks of ground, a cut-off  
grade of 230cmg/t was applied to identify additional panels for mining. The gold
content figures are fully inclusive of mining dilutions and gold losses and are 
reported as mill delivered tonnes and head grade. Metallurgical recovery factors
have not been applied to the reserve figures.                                   
Mineral reserves are included in mineral resources                              
sxr Uranium One"s President and Chief Executive Officer Neal Froneman, who is   
also Chief Executive Officer of Aflease Gold, commented:                        
"The revised reserve statement for Modder East indicates that the value of the  
project has increased. We will update shareholders of any changes in the        
project"s value in due course."                                                 
Quality Assurance and Quality Control                                           
Exploration programs carried out by Aflease Gold are done so under the direction
of Warwick Bullen, M.Sc., Pr.Sci.Nat., Vice President: Geology and Exploration, 
Aflease Gold, and a qualified person for the purposes of NI 43-101. Geological  
and geostatistical modeling is undertaken by two consultants, Peter Camden-     
Smith, M.Sc., G.D.Eng, MBL, Pr.Sci.Nat, and Charles Muller, B.Sc.(Hons.),       
Pr.Sci.Nat., both of whom are qualified persons for the purposes of NI 43-101   
Exploration data is acquired by the Corporation and its consultants under strict
quality assurance and quality control protocols. All borehole collars are       
surveyed to within an accuracy of 0.1 metre and borehole density measurements   
are routinely performed on all intersections. Down-hole surveys are carried out 
on all surface drillholes by qualified personnel. Half-core assay samples are   
collected by appropriately qualified staff, the remaining half-core being       
retained for inspection by interested parties. All boreholes are routinely      
logged in detail according to a standard procedure. Samples are prepared and are
assayed at the Anglo American Research Laboratory (renamed Anglo Research on 1  
October 2006) located near Johannesburg, South Africa, which is accredited under
SANAS and ISO 17025 certified. Gold assays are performed using conventional lead
collector fire assay procedures, with an ICP-OES instrumental finish. Quality   
control procedures follow industry standard protocols and include the use of    
blind control samples.                                                          
Sub Nigel Project - Nigel Reef target                                           
The November 2006 resource statement for the Nigel Reef target shows a resource 
tonnage of 1,539Kt grading 4.14g/t for 205,000 contained ounces of gold in the  
indicated category and 139Kt grading 2.99g/t for 13,000 contained ounces of gold
in the inferred category (Table 3). The resources were estimated using a cut-off
grade of 220cmg/t.  This compares with a resource of 180,000 ounces in the      
inferred category grading at 5.37 g/t gold, as stated in the audited mineral    
resource statement for the Nigel Reef target prepared by SRK Consulting in      
December 2005. In all cases, mineral resources have been reported in accordance 
with the classification criteria of the South African Code for Reporting of     
Mineral Resources and Mineral Reserves (SAMREC).                                
In light of the November 2006 resource statement, Aflease Gold has decided to   
proceed with a pre-feasibility study on the Nigel Reef target.  The study is    
expected to be completed during the first quarter of 2007. The study will be    
completed internally, with outside consultants used where needed.               
sxr Uranium One"s President and Chief Executive Officer Neal Froneman, who is   
also Chief Executive Officer of Aflease Gold, commented:                        
"Sub Nigel represents a real opportunity to expand the gold mining profile of   
Aflease Gold in the short term. Given the excellent state of the existing       
infrastructure, we could possibly begin production at Sub Nigel even earlier    
than at Modder East, if our feasibility studies produce the expected positive   
results."                                                                       
The Sub Nigel Gold Project consists of three targets - the Nigel Reef, the      
stratigraphically equivalent Main Reef, and the Erosion Channel. The Nigel Reef 
target is located at the dormant Sub Nigel gold mine, while the Main Reef target
is located at the dormant Spaarwater gold mine situated immediately west of Sub 
Nigel. The Erosion Channel target is an erosional feature incised into shales of
the Jeppestown Subgroup immediately below the Nigel and Main Reefs along the    
boundary between the two properties. The October 2006 resource statement        
includes mineral resources to a depth of 750m below surface.                    
Both the Sub Nigel and Spaarwater gold mines are owned as to 100% by Aflease    
Gold Limited.                                                                   
The Nigel/Main Reef is a small-pebble conglomerate ranging from 15cm to 65cm in 
thickness. The reef is developed on a grey, banded shale footwall and is        
overlain by quartzite. Contacts between the hanging and footwall lithologies are
sharp. The Erosion Channel varies between 200m and 500m in width, is some 150m  
in thickness, and contains bands of quartzite, pyritic quartzite and            
conglomerate fill. Gold mineralization occurs in the pyritic quartzites within  
the palaeo-channel.                                                             
The Sub Nigel mine produced an estimated 15 million ounces of gold from the     
Nigel Reef between 1909 and 1971. A total of 29.7 million tonnes of ore at an   
average head grade of 15.7g/t were milled during this period.  The 900m deep Sub
Nigel 1 Shaft on the property was recently re-commissioned and licensed and is  
fully operational. The Spaarwater mine, located immediately to the west of Sub  
Nigel, produced 850,000 ounces of gold from 2.56 million tonnes of ore at an    
average head grade of 10.4g/t between 1947 and 1969. All the gold was produced  
from the Main Reef.                                                             
Both the Nigel and Main Reefs are accessed from Sub Nigel 1 Shaft.              
The table below summarizes the revised resources for the Sub Nigel Project by   
category.                                                                       
Table 3. November 2006 Sub Nigel resource statement                             
                        Tonnes   Grade   Metal   Actual                         
                        (Kt)     (g/t)   Content increase/                      
                                         (Koz)   decrease in                    
ounces - Nov                   
                                                 2006 vs Dec                    
                                                 2005 (Koz)                     
Indicated                                                                       
(1) Sub Nigel - Nigel   1,539    4.14    205     205                            
Reef                                                                            
Spaarwater - Main Reef                                                          
Erosion Channel                                                                 
SubTotal Indicated      1,539    4.14    205     205                            
Inferred                                                                        
(1) Sub Nigel - Nigel   139      2.99    13      -167                           
Reef                                                                            
Spaarwater - Main Reef  1,258    4.08    165     0                              
Erosion Channel         1,301    5.71    239     0                              
SubTotal Inferred       2,698    4.81    417     -167                           
(1) Quoted at a cut-off                                                         
of 220cmg/t                                                                     
Notes:                                                                          
The cut-off grade was determined using a gold price of US$620/oz and an exchange
rate of US$1:R6.50.                                                             
The mineral resources have been reported in accordance with the classification  
criteria of the SAMREC Code.                                                    
In the opinion of SRK, the mineral resource classifications defined in the      
SAMREC code are materially similar to those defined in Standards on Mineral     
Resources and Reserves Definitions and Guidelines adopted by Canadian Institute 
of Mining, Metallurgy and Petroleum utilized by Canadian National Instrument 43-
101.                                                                            
Mineral resources are not mineral reserves and do not have demonstrated economic
viability.                                                                      
The increase in resources at the Nigel Reef target reflected in the November    
2006 resource estimate is the result of a re-evaluation of the resource using   
geostatistical techniques, in contrast to the December 2005 estimate which was  
based on classical statistical methodologies. Geostatistical techniques involve 
the statistical treatment of spatially arranged data using semivariograms,      
kriging and multivariate analysis. In addition, mined-out areas and associated  
development ends were captured in digital format for the first time, as was the 
historical assay database consisting of some 6,500 stretch values located along 
on-reef development drives and in stoped-out areas. The stretch values were     
checked against composited chip samples taken during 2006 from stope faces and  
along on-reef development drives. The decrease in grade at the Nigel Reef target
is primarily a function of the higher stope width used in the November 2006     
estimate - 90cm as opposed to 70cm used in earlier resource estimates.          
The November 2006 resource estimate for the Nigel Reef target was prepared by   
Peter Camden-Smith, M.Sc., G.D.Eng, MBL, Pr.Sci.Nat. of Camden Geoserve, and    
Charles Muller, B.Sc. (Hons), Pr.Sci.Nat. of Global Geo Services, independent   
geoscience consultants to Aflease Gold.  Both Camden-Smith and Muller are       
qualified persons for the purposes of NI 43-101. The resource estimation process
was managed by Warwick Bullen, M.Sc., Pr.Sci.Nat., Vice President, Geology and  
Exploration, Aflease Gold and a qualified person for the purposes of NI 43-101. 
The resources were audited by Mark Wanless of SRK Consulting.                   
About Aflease Gold                                                              
Aflease Gold is a South African gold resource company listed on the JSE Limited 
(the Johannesburg stock exchange).  The company owns the Modder East Gold       
Project, currently under construction, as well as the Sub Nigel, New            
Kleinfontein, Turnbridge and the Holfontein Gold Projects, all on the East Rand;
the Ventersburg Gold Project in the Free State gold field; and the Etendeka Gold
Project in Namibia.  Aflease Gold was formed in January 2006 through the reverse
takeover of Sub Nigel Gold Mining Company by New Kleinfontein Mining Company, a 
wholly-owned subsidiary of sxr Uranium One Inc.  The company is currently owned 
as to approximately 71.6 % by sxr Uranium One and has a market capitalization in
excess of R1billion.                                                            
About sxr Uranium One                                                           
sxr Uranium One Inc. is a Canadian uranium and gold resource company with a     
primary listing on the Toronto Stock Exchange and a secondary listing on the JSE
Limited. The Corporation owns the Dominion Uranium Project in South Africa and  
the Honeymoon Uranium Project in South Australia, and is actively pursuing      
growth opportunities in the uranium sector in the western United States.  The   
Corporation holds an approximate 71.6% interest in Aflease Gold Limited, which  
owns the Modder East gold project in South Africa.  Through a joint venture with
Pitchstone Exploration Ltd., the Corporation is also engaged in uranium         
exploration activities in the Athabasca Basin of Saskatchewan.                  
For further information, please contact:                                        
Neal Froneman                            Chris Sattler                          
President and Chief Executive Officer    Vice President, Investor Relations     
sxr Uranium One                          sxr Uranium One                        
Tel: + 27 11 482 3605                    Tel: +1 416 350 3657                   
Cautionary Statement                                                            
This News Release includes certain "forward-looking statements" within the      
meaning of the Private Securities Litigation Reform Act of 1995 and "forward-   
looking information" within the meaning of applicable Canadian legislation. All 
statements other than statements of historical fact included in this release    
including, without limitation, statements regarding future plans and objectives 
of Uranium One and its Aflease Gold affiliate are forward-looking statements (or
forward-looking information) that involve various risks and uncertainties. There
can be no assurance that such statements will prove to be accurate and actual   
results and future events could differ materially from those anticipated in such
statements. Important factors could cause actual results to differ materially   
from Uranium One"s or Aflease Gold"s expectations. Such factors include, among  
others, the actual results of exploration activities, actual results of         
reclamation activities, the estimation or realization of mineral reserves and   
resources, the timing and amount of estimated future production, costs of       
production, capital expenditures, costs and timing of the development of new    
deposits, availability of capital required to place Uranium One"s or Aflease    
Gold"s properties into production, conclusions of economic evaluations, changes 
in project parameters as plans continue to be refined, future prices of         
commodities, possible variations in ore grade or recovery rates, failure of     
plant, equipment or processes to operate as anticipated, accidents, labour      
disputes and other risks of the mining industry, delays in obtaining            
governmental approvals, permits or financing or in the completion of development
or construction activities, Uranium One"s or Aflease Gold"s hedging practices,  
currency fluctuations, title disputes or claims limitations on insurance        
coverage, as well as those factors discussed under "Risk Factors" in Uranium    
One"s Annual Information Form, Management"s Discussion and Analysis for the     
third quarter of 2006 and Uranium One"s (final) short form prospectus dated     
October 26, 2006 as filed with securities regulatory authorities in Canada.     
Although Uranium One has attempted to identify important factors that could     
cause actual results to differ materially, there may be other factors that cause
results not to be as anticipated, estimated or intended.                        
Statements in this release that are not historical facts are "forward-looking   
statements" involving known and unknown risk and uncertainties which are beyond 
the ability of the Corporation to control or predict and which could cause      
actual events or results to differ materially from those anticipated in such    
forward-looking statements.                                                     
In addition, this news release uses the terms "indicated resources" and         
"inferred resources" as defined in accordance with the SAMREC Code (South       
African Code for Reporting of Mineral Resources and Mineral Reserves prepared by
the South African Mineral Resource Committee) (SAMREC) under the auspices of the
South African Institute of Mining and Metallurgy effective March 2000 or as     
amended from time to time.                                                      
 A mineral reserve is the economically mineable part of a measured or indicated 
resource demonstrated by at least a preliminary feasibility study. This study   
must include adequate information on mining, processing, metallurgical, economic
and other relevant factors that demonstrate at the time of reporting that       
economic extraction can be justified. A mineral reserve includes diluting       
materials and allows for losses that may occur when the material is mined. A    
proven mineral reserve is the economically mineable part of a measured resource 
for which quantity, grade or quality, densities, shape and physical             
characteristics are so well established that they can be estimated with         
confidence sufficient to allow the appropriate application of technical and     
economic parameters to support production planning and evaluation of the        
economic viability of the deposit. A probable mineral reserve is the            
economically mineable part of an indicated mineral resource for which quantity, 
grade or quality, densities, shape and physical characteristics can be estimated
with a level of confidence sufficient to allow the appropriate application of   
technical and economic parameters to support mine planning and evaluation of the
economic viability of the deposit.                                              
A mineral resource is a concentration or occurrence of natural, solid, inorganic
or fossilized organic material in or on the earth"s crust in such form and      
quantity and of such a grade or quality that it has reasonable prospects for    
economic extraction. The location, quantity, grade, geological characteristics  
and continuity of a mineral resource are known, estimated or interpreted from   
specific geological evidence and knowledge. A measured mineral resource is that 
part of a mineral resource for which quantity, grade or quality, densities,     
shape and physical characteristics can be estimated with a level of confidence  
sufficient to allow the appropriate application of technical and economic       
parameters to support mine planning and evaluation of the economic viability of 
the deposit. The estimate is based on detailed and reliable exploration,        
sampling and testing information gathered through appropriate techniques from   
locations such as outcrops, trenches, pits, workings and drillholes that are    
spaced closely enough to confirm both geological and grade continuity. An       
indicated mineral resource is that part of a mineral resource for which         
quantity, grade or quality, densities, shape and physical characteristics can be
estimated with a level of confidence sufficient to allow the appropriate        
application of technical and economic parameters to support mine planning and   
evaluation of the economic viability of the deposit. The estimate is based on   
detailed and reliable exploration and testing information gathered through      
appropriate techniques from locations such as outcrops, trenches, pits, workings
and drillholes that are spaced closely enough for geological and grade          
continuity to be reasonably assumed. An inferred mineral resource is that part  
of a mineral resource for which quantity and grade or quality can be estimated  
on the basis of geological evidence and limited sampling and reasonably assumed,
but not verified, geological and grade continuity. The estimate is based on     
limited exploration and sampling gathered through appropriate techniques from   
locations such as outcrops, trenches, pits, workings and drillholes. Mineral    
resources which are not mineral reserves do not have demonstrated economic      
viability. Investors are cautioned not to assume that all or any part of the    
mineral deposits in the measured and indicated resource categories will ever be 
converted into reserves. In addition, "inferred resources" have a great amount  
of uncertainty as to their existence and economic and legal feasibility. It     
cannot be assumed that all or any part of an inferred mineral resource will be  
ever be upgraded to a higher category.  Under South African rules, estimates of 
inferred mineral resources may not form the basis of feasibility or pre-        
feasibility studies or economic studies except under conditions noted in the    
SAMREC Code.                                                                    
Investors are cautioned not to assume that all or any part of an inferred       
resource exists or is economically or legally mineable. Exploration data is     
acquired by the Corporation and its consultants under strict quality assurance  
and quality control protocols.                                                  
No stock exchange, securities commission or other regulatory authority has      
approved or disapproved the information contained herein.                       
Date: 04/12/2006 04:20:28 PM Produced by the JSE SENS Department                
                                                                                
                                                                                
                                                                                
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: