Thu 25 Jan 2007, 9:00 AQP - Aquarius Platinum Limited - Quarterly result
AQP
 AQP                                                                             
AQP - Aquarius Platinum Limited - Quarterly results                             
Aquarius Platinum Limited                                                       
(Incorporated in Bermuda)                                                       
Registration Number: EC26290                                                    
Share Code JSE: AQP                                                             
ISIN Code:   BMG0440M1029                                                       
("Aquarius Platinum")                                                           
Aquarius Platinum (isin bmg0440M1029) Second Quarter 2007 Financial Year        
Production results                                                              
P&SA2 at Marikana Comes of Age                                                  
Highlights of the Quarter                                                       
Production by mine 232,668 PGM ounces, Aquarius attributable 136,928 PGM ounces 
Approved new order conversion of Kroondal, Marikana and Everest mining rights   
Announced buy-back acquisition of 3.5% of South African subsidiary from BEE     
partners                                                                        
P&SA1 at Kroondal                                                               
Production 117,189 PGM ounces (Aquarius attributable: 58,594 PGM ounces)        
Primary development increased by 12% to improve face availability and mining    
flexibility due to challenging geology at No. 3 Shaft                           
New K5 Shaft on budget and first reef tons produced one month ahead of plan     
Firm commodity prices buoy quarterly gross cash margin at 64%                   
P&SA2 at Marikana                                                               
Production increased 27% to 39,077 PGM ounces (Aquarius attributable: 19,538 PGM
ounces)                                                                         
Underground ramp-up advances accounting for 37% of total tons                   
DMS plant commissioned and already improving operational performance and        
flexibility                                                                     
Gross cash margin for the quarter increased to 50% from 43% in the previous     
quarter                                                                         
Everest                                                                         
Production steady at 41,191 PGM ounces                                          
Underground ramp-up continues accounting for 75% of total tons, despite         
contractor labour challenges                                                    
Ramp up to complete during second half, with full production output targeted for
first quarter FY 2008                                                           
Gross cash margin for the quarter 56%                                           
Mimosa                                                                          
Planned shutdown coupled with primary mill breakdown reduced production to      
33,345 PGM ounces (Aquarius attributable: 16,672 PGM ounces)                    
Wedza Phase IV optimisation completed and Phase V expansion to 190,000 PGM      
ounces announced                                                                
Mining production on track, with 7 week stockpile on surface (following plant   
shutdowns)                                                                      
Gross cash margin at 68%, reflecting a strong financial performance despite     
lower production                                                                
CTRP                                                                            
Production increased to 1,866 PGM ounces (Aquarius attributable: 933 PGM ounces)
Significant increase in feed achieved, with focus now on achieving higher       
recoveries and production                                                       
Gross cash margin for the quarter at 77%                                        
Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said, "The   
second quarter has delivered us some new challenges as we have focused on mine  
development for longer-term benefits, in order to continue to deliver production
in to the sustained high commodity prices.                                      
In South Africa, production at AQPSA increased 2%.  This modest increase masks  
the strong turnaround being enjoyed at Marikana, and is a fair performance given
the considerable development ongoing at Kroondal and Everest.  In Zimbabwe, both
planned and unplanned plant shut downs resulted in lower quarterly production,  
yet the mining operations are in particular on a stronger footing going forward,
and the mills are hungry to process a sizeable surface stockpile.               
Marikana deserves a special mention this quarter, for completion of its DMS     
plant and the ongoing and improving performance of all the mining teams there.  
Aquarius Platinum Quarterly PGM Production (Attributable)                       
Production by Mine                                                              
 PGMs (4E)         Quarter Ended                                                
                   Mar 2006    Jun 2006     Sep 2006     Dec 2006               
 Kroondal          107,501     99,406       121,713      117,189                
Marikana          5,810       31,992       30,865       39,077                 
 Everest           46,081      43,838       41,717       41,191                 
 Mimosa            33,252      37,395       42,733       33,345                 
 CTRP              1,484       1,856        1,711        1,866                  
Total             194,128     214,487      238,739      232,668                
Production by Mine Attributable to Aquarius                                     
 PGMs (4E)         Quarter Ended                                                
                   Mar 2006    Jun 2006     Sep 2006     Dec 2006               
Kroondal          53,751      49,703       60,856       58,594                 
 Marikana          2,905       15,996       15,432       19,538                 
 Everest           46,081      43,838       41,717       41,191                 
 Mimosa            16,626      18,697       21,367       16,672                 
CTRP              742         928          855          933                    
 Total             120,105     129,162      140,227      136,928                
Metals Prices and Foreign Exchange                                              
Commodity prices through the quarter remained firm consolidating on strong gains
realised over calendar 2006.  The chart below illustrates the individual prices 
for platinum, palladium, rhodium and gold.  Platinum prices peaked in November  
at over $1,300 per ounce on news of the possible introduction of a platinum     
exchange traded fund (ETF) and closed the quarter at $1,119 per ounce.  The     
rhodium price was strong towards the quarter end, closing for the quarter at    
$5,550 per ounce due to continued physical demand.  Gold and palladium enjoyed  
modest increases over the quarter of 4% and 6% respectively.                    
Platinum Group Metal Prices (Dollar per PGM ounce)                              
The table below details the individual basket prices achieved at each operation 
calculated using a four-element PGM ounce (platinum, palladium, rhodium and     
gold).  All operations continued to benefit from strong basket prices, broadly  
in line with the two previous quarters.                                         
Average PGM basket prices achieved at Aquarius operations: US$ per PGM ounce    
(4E)                                                                            
                    Basket Prices (Financial Year Quarters)                     
                    Mar 2006    Jul 2006    Sep 2006     Dec 2006               
Kroondal           1,064       1,306       1,311        1,287                  
 Marikana           1,028       1,275       1,283        1,270                  
 Everest            964         1,162       1,199        1,179                  
 Mimosa             750         854         958          934                    
CTRP               1,276       1,449       1,622        1,592                  
The Rand basket price at South African operations averaged R9,315 per PGM ounce 
over the quarter, flat when compared with the previous quarter.  In Dollar      
terms, this is equal to $1,266 per PGM ounce.  In Zimbabwe, the Dollar basket   
price averaged $939 per PGM ounce.  In addition, by-product base metals copper  
and nickel recorded strong prices at Mimosa, with copper averaging 1% higher at 
$3.42/lb and nickel averaging 34% higher at $13.03/lb over the quarter.         
Platinum Group Metal Basket Prices (Dollar and Rand per PGM ounce)              
The South African Rand weakened against the US Dollar over the quarter, however,
averaging 7.36, which was 4% weaker than the average in the first quarter.  This
had a positive impact on the Rand PGM basket price, trading much of the second  
quarter above R9,000 per PGM ounce, and in November breaking though R10,000 per 
PGM for a short period.                                                         
South African Rand: Dollar                                                      
AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum 50.5%)            
P&SA 1 at Kroondal                                                              
Safety                                                                          
The 12-month rolling average DIIR for the quarter improved to 0.93 from 1.02 in 
the previous quarter. Kroondal achieved 1,777,521 fatality-free shifts up to the
end of the quarter.                                                             
Mining                                                                          
Open pit production increased to 147,089 tons, underground production decreased 
to 1,513,610 tons                                                               
Primary development increased by 12% to improve face-availability and mining    
flexibility                                                                     
K5 Project remains ahead of schedule                                            
Head grade stable at 2.85g/t                                                    
Processing                                                                      
Plant processed 1.7 million tons                                                
Production decreased 4% to 117,189 PGM ounces                                   
Concentrator recoveries stable at 77%                                           
P&SA1 at Kroondal PGM Production & Rand Cash Costs per PGM Ounce                
Revenue                                                                         
Revenue at Kroondal increased 1% to R963 million for the quarter (Aquarius      
share: R481 million).  The increased total Rand revenue was due to the positive 
impact of a weakening in the average Rand Dollar exchange rate of 4% in the     
quarter which offset lower PGM production and a 2% reduction in the Dollar      
basket price to $1,287 per PGM ounce.  The cash margin for the quarter was      
virtually unchanged at 64% compared to 65% in the previous quarter (65%).       
Operations                                                                      
Production totalled 1,658,754 tons.  Open pit production increased 1% to 147,089
tons and underground production decreased by 8% to 1,513,610 tons.  During the  
quarter, production was adversely impacted by excessive downtime on trackless   
mechanised mining machinery due to breakdowns.  To rectify this situation,      
Murray & Roberts Cementation, the underground mining contractor, subsequently   
recruited additional personnel and revised maintenance, replacement and rebuild 
programmes.  In addition, of the four operating shafts at Kroondal, the No. 3   
and East Shafts encountered some geological losses due to potholing.  A surface 
drilling programme was initiated during the quarter to upgrade the geological   
model and help improve planning going forward.                                  
Tons processed declined by 2% to 1,657,967 tons, which included 107,374 tons of 
opencast.                                                                       
Over the quarter, stockpiles increased marginally to 100,000 tons at the end of 
the quarter, in preparation for the Christmas close and to mitigate the Q3      
holiday impact.                                                                 
The head grade was flat at 2.85g/t. compared to 2.86g/t previous quarter.       
It is anticipated that the high rate of development that has been ongoing at    
Kroondal, will decrease in the next quarter and that this should result in a    
positive effect on the head grade and unit cost.                                
Plant recoveries decreased by 1% to 77% as a result of the relatively poor      
quality of opencast ore processed.                                              
PGM production decreased by 4% to 117,189 PGM oz (Aquarius attributable: 58,594 
PGM ounces).                                                                    
Kroondal: Metal in concentrate produced (PGM ounces)                            
Quarter    Pt      Pd      Rh      Au       PGMs    PGMs                       
 ended                                               attributable               
                                                     to Aquarius                
 Dec 2006   70,522  33,748  12,295  624      117,189 58,594                     
Sep 2006   73,239  35,166  12,679  629      121,713 60,856                     
 Jun 2006   59,057  29,194  10,649  506      99,406  49,703                     
 Mar 2006   64,248  31,372  11,342  539      107,501 53,751                     
Operating Cash Costs                                                            
Cash costs increased by 7% to R211 per ROM ton reflecting both lower volumes and
an increase in primary development and infrastructure costs.  Consequently, cash
costs per PGM ounce for the quarter increased by 8% to R2,982.                  
Kroondal: Operating Cash Costs                                                  
4E (Pt+Pd+Rh+Au)  6E                   6E net of by-               
                               (Pt+Pd+Rh+Ir+Ru+Au)  products (Ni&Cu)            
 Kroondal    R 2,982 per PGM   R 2,453 per PGE      R 2,294 per PGE             
             ounce             ounce                ounce                       
Operating cash costs include ledging and primary development costs of R429 per  
PGM ounce (up 42% on the previous quarter), secondary development costs of R75  
per PGM ounce (up 108% on previous quarter) and engineering infrastructure costs
of R243 per PGM ounce (up 7% on previous quarter).  Cash cost of stoping for    
Kroondal were R2,235 per PGM ounce, a 2% increase compared to the previous      
quarter.  It should also be noted that operating costs also include costs       
associated with the new K5 shaft of R122 per PGM ounce.  The K5 Shaft is in a   
ramp-up phase and therefore attracts high relative unit costs at this stage.    
Kroondal Operating Cash Costs Reconciliation                                    
 Rand per PGM ounce            Q1 (Sep      Q2 (Dec       Variance              
                               2006)        2006)                               
 Cash costs                    2,982        2,754         -8%                   
Ledging and primary           (429)        (302)         -42%                  
 development costs                                                              
 Secondary development costs   (75)         (36)          -108%                 
 Engineering infrastructure    (243)        (227)         -7%                   
costs                                                                          
 Cash cost after adjustments   2,235        2,189         -2%                   
It is expected that the unit costs will start to decrease.  In the next quarter 
it is anticipated that primary development will reduce, followed by reduction in
equipping and engineering infrastructure in the subsequent quarter.  Ensuring   
adequate face availability and mining flexibility at Kroondal is key to the     
longer-term management of the mine and while development has taken time the     
benefits are now expected to be realised.                                       
Project Capital Expenditure                                                     
During the quarter R93 million was spent on capital on belt extensions and      
infrastructure improvements.                                                    
K5 Project at Kroondal                                                          
Mining                                                                          
The appointed contractor Deilmann-Haniel (SA) (Pty) Ltd is performing           
satisfactorily.                                                                 
During the quarter a total of 541 metres of development was completed.  With the
two main declines already on the reef horizon, the new `R1` chair-lift decline  
began construction, completing a total 41 metres in the quarter.  The           
excavations to transfer ore from the reef horizon to the main belt (known as ore
passes) were completed and civil construction due to start in January 2007 has  
commenced.  The No 1 ventilation shaft excavation started on schedule.          
Construction                                                                    
Construction both on surface and underground continued satisfactorily.  The     
conveyors to the reef horizon were commissioned on schedule.  Construction of   
the rail-loading facility commenced during the quarter.                         
Capital Cost                                                                    
Of the budget of R131.1 million, R106.2 million has been committed at the end of
the quarter.                                                                    
P&SA2 at Marikana                                                               
Safety                                                                          
The 12-month rolling average DIIR for the quarter deteriorated to 0.43 from 0.21
in the previous quarter as a result of four lost-time accidents.  Codes and     
procedures have been reviewed and amended with the workforce being re-trained   
accordingly.                                                                    
Mining                                                                          
Underground production for the quarter increased 11% to 188,901 tons            
Open pit production for the quarter increased 13% to 383,342 tons               
By quarter-end, the stockpile increased by 18% to 196,000 tons                  
Processing                                                                      
Marikana Dense Media Separation Plant commissioned                              
A record 542,091 ROM tons were processed during the quarter                     
Marginal 1% fall in recoveries to 69% due to a higher feed of oxidised opencast 
material                                                                        
Production increased 27% to 39,077 PGM ounces (Aquarius attributable: 19,538 PGM
ounces)                                                                         
P&SA2 at Marikana PGM Production & Rand Cash Costs per PGM Ounce                
Revenue                                                                         
The PGM basket price for the quarter averaged $1,270 per PGM ounce, 1% lower    
than the previous quarter.  Despite this, a growth in volumes, an increase of   
production, and a weaker average Rand Dollar exchange rate of 7.36 resulted in a
27% increase in mine revenue to R324 million for the quarter (AQPSA share R162  
million.  The cash margin for the quarter rose to 50% from 43%.                 
Operations                                                                      
Total production increased 12% to 572,243 ROM tons for the quarter, with one    
third coming from underground production and two thirds from open pit.          
Open pit production increased by 13% to 383,342 tons.  The opencast mining      
contractor, MCC Mining (Pty) Ltd, is performing well and is managing costs      
effectively as both efficiencies and output have improved since their           
appointment.  Production in Marikana Pit B was accelerated to facilitate a box  
cut for the construction of a second decline shaft, an expedient way to access  
the underground ore from the opencast operations.  Stormwater controls and      
additional pumping capacity have been established to prepare for the local rain-
season in the third quarter.                                                    
Underground production increased by 11% to 188,901 tons.  At No. 1 Shaft, 465   
metres of primary development was completed.  A hybrid-mining method was        
successfully implemented.  This has resulted in a reduced stoping-width, thereby
contributing to an increase in the plant head grade.  At No. 4 Shaft 972 metres 
of primary development was completed during the quarter.  Some potholes were    
encountered in the main decline ends. Infill drilling is being undertaken to    
determine the extent of the geological disturbance, resulting in a short delay  
in tonnage build up.  Preparation of the high wall at No. 2 Shaft was completed 
and development of the twin-decline system has commenced.                       
The stockpile (predominantly comprising oxidised material) increased by 18% to  
196,000 tons at the end of the quarter.                                         
A total of 542,091 tons were processed during the quarter, a 22% increase.  Of  
this, 202,391 tons were from underground, a 44% increase and 339,700 tons from  
opencast, an 11% increase.                                                      
The plant head grade improved by 6% to 3.26 g/t from 3.07 g/t.  Plant recoveries
decreased marginally by 1% to 69% as a result of the additional open material in
the mix.                                                                        
PGM production increased by 27% to 39,077 PGM ounces (Aquarius attributable:    
19,538 PGM ounces).                                                             
Marikana: Metal in concentrate produced (PGM ounces)                            
 Quarter    Pt      Pd       Rh      Au       PGMs    PGMs                      
ended                                                attributable              
                                                      to Aquarius               
 Dec 2006   23,627  11,218   3,941   291      39,077  19,538                    
 Sep 2006   18,588  8,944    3,098   235      30,865  15,432                    
Jun 2006   19,036  9,531    3,162   263      31,992  15,996                    
 Mar 2006   3,591   1,642    534     43       5,810   2,905                     
Operating Cash Costs                                                            
Cash cost per ROM ton decreased by 9% to R299 per ROM ton from increased        
production volumes generated by underground stoping activities versus           
development in the previous quarter.                                            
Marikana: Operating Costs                                                       
           4E (Pt+Pd+Rh+Au)   6E                   6E net of by-                
(Pt+Pd+Rh+Ir+Ru+Au)  products (Ni&Cu)             
 Marikana  R 4,147 per PGM    R 3,402 per PGE      R 3,141 per PGE              
           ounce              ounce                ounce                        
The cash cost per PGM ounce decreased by 12% to R4,147 per PGM ounce.           
Development costs, which form part of the cash costs per PGM ounce reduced by   
22% from the previous quarter to R431 per PGM ounce.  Deducting the development 
cost, the reefing and stoping costs achieved a milestone, breaking below R4,000 
at R3,716 per PGM ounce.                                                        
Marikana Pool & Share Agreement (P&SA2)                                         
The Dense Media Separation (DMS) Plant was successfully commissioned during the 
quarter.  This resulted in an increase in throughput.  Further ramp-up and      
optimisation will continue.                                                     
During the quarter expansion capital expenditure of R46 million was incurred.   
The total expansion capital expenditure to date is R99 million (AQPSA share:    
49.5 million).                                                                  
Contractor dispute with Moolman Mining                                          
Moolman Mining was the primary opencast mining contractor employed at the       
Marikana Mine from start up in May 2002 until December 2005.  In December 2005, 
AQPSA resiled from the contract with Moolman Mining on discovering              
misrepresentations by Moolman which induced the contract.  Moolman has been     
replaced by MCC as opencast contractor and MCC has since improved production    
from the opencast mine significantly at no additional cost over the disputed    
Moolmans contract rates.                                                        
In April 2006, AQPSA instituted action against Moolman arising from the         
misrepresentation.  The action includes a damages component.  In May 2006, AQPSA
served an application to stay the arbitration in respect of the Rise and Fall   
claim pending the determination of the action.  In September 2006, AQPSA        
received Moolmans` response in the application to stay the arbitration as well  
as a plea to the action.  Moolmans delivered a conditional counterclaim,        
comprising four components in an aggregate amount of ZAR472 million.  The AQPSA 
legal team is in the process of preparing a reply in the application proceedings
and a plea to the conditional counterclaims.  During the course of this process,
AQPSA has requested further documentation from Moolmans relating to the Marikana
contract.  The process of finalising the replying affidavit and inspection of   
documents continues and is expected to be finalised in the 3rd Quarter of the   
2007 financial year.                                                            
It is anticipated that legal proceedings relating to the dispute may take years 
to resolve.                                                                     
Everest Platinum Mine                                                           
Safety                                                                          
The 12-month rolling DIIR improved to 0.52 from 0.95 in the previous quarter,   
with no lost-time injuries during November and December.  Safety initiatives    
during the period focussed on fall-of-ground prevention and materials handling. 
Mining                                                                          
Underground ore production increased substantially, up 51% to 487,114 tons      
Opencast operations production fell in favour of underground production to      
163,130 tons                                                                    
Opencast mining extended through development of the South-West Pit adding       
320,000 tons to the opencast reserve                                            
Processing                                                                      
Plant processed 656,386 tons, an 8% increase compared to the previous quarter   
Recoveries fell to 70% from 72% in the previous quarter                         
Production decreased by 1% to 41,191 PGM ounces                                 
Everest PGM Production & Rand Cash Costs per PGM Ounce                          
Revenue                                                                         
Revenue at Everest increased 5% to R334 million for the quarter.  The increase  
in revenue was due to a weaker average Rand Dollar exchange rate which offset   
lower production and a 2% decrease in the average PGM basket price for the      
quarter to $1,179 per PGM ounce.  The cash margin for the quarter fell to 56%.  
Operations                                                                      
Operational ramp-up continued, with opencast and underground producing a total  
650,244 tons, a 6% increase compared to the previous quarter, with the          
production balance now firmly shifting towards underground operations, now      
producing three quarters of all production compared to just over half in the    
previous quarter.                                                               
In line with the shift towards more favourable underground production, opencast 
mining declined to 163,130 tons.  As the North Pit was depleted, the opencast   
reserve was boosted through the establishment of an extension at the South-West 
Pit, adding an additional 320,000 tons to the opencast reserve.  The opencast   
ROM grade fell significantly from the previous quarter with more production     
coming from the low-grade area in the North Pit and shallow oxidised reef from  
the South-West Pit extension.  It is anticipated that opencast grades will      
improve during the next quarter as mining extends into the deeper areas of the  
South-West pit yielding more competent reef.  The opencast mining contractor    
(MCC Mining) continues to perform well.  Opencast unit costs increased as a     
result of the lower production and the initial high stripping ratio in the      
South-                                                                          
West Pit extension.                                                             
On-reef decline development and the establishment of stoping sections continued 
during the quarter, resulting in a 51% increase in underground tonnages to      
487,114 tons, a significant improvement from the previous quarter by the        
underground mining contractor, Shaft Sinkers Mining (Pty) Ltd.  There was no    
recurrence of the industrial relations issues which affected output during the  
previous quarter and production showed consistent growth through the quarter.   
The underground head grade improved slightly from the previous quarter as the   
mining extended into thicker reef areas resulting in less dilution.             
Although the percentage of underground feed increased to 74%, the grade and     
recovery benefit was outweighed by the low opencast grades, with the plant head 
grade falling to 2.79 g/t from 2.98 g/t.                                        
Concentrator throughput was 656,386 tons milled for the period, with 6,142 tons 
consumed from the stockpile, which fell to 13,743 tons at the end of the        
quarter.                                                                        
Metallurgical recoveries were adversely affected by the reduction in grade and  
the oxidised opencast material, dropping to 70% from 72%.  Advanced flotation   
process control systems were implemented towards the end of the quarter and a   
reduction in oxidised material will result in improved recoveries during the    
next quarter.                                                                   
Production fell 1% to 41,191 PGM ounces for the quarter.                        
Everest: Metal in concentrate produced (PGM ounces)                             
Quarter     Pt         Pd          Rh         Au         PGMs (4E)              
ended                                                                           
Dec 06      23,495     13,484      3,838      374        41,191                 
Sep 06      23,459     14,140      3,697      421        41,717                 
Jun 06      24,699     14,844      3,817      478        43,838                 
Mar 06      27,257     14,913      3,472      439        46,081                 
Operating Cash Costs                                                            
Cash costs increased by 18% to R224 per ROM ton milled as a result of the higher
consumption of underground production, which has not yet achieved steady-state  
and the unit cost increase from higher opencast stripping ratios during the     
establishment of the South-West Pit.  Consequently, cash costs per PGM ounce for
the quarter increased by 23% to R3,573 per PGM ounce.  Of this cost increase    
R292 per PGM ounce can be attributed to a lower grade and recovery and R230 per 
PGM ounce to an increase in labour and mobile mining equipment that was brought 
in earlier to facilitate and secure the underground ramp-up.  The higher        
opencast stripping ratio contributed a further increase in cost of R152 per PGM 
ounce.                                                                          
It is anticipated that unit costs will reduce as the underground volumes ramp up
to steady-state production and metallurgical recovery and head grade            
improvements are realised.                                                      
Everest Operating Costs                                                         
4E (Pt+Pd+Rh+Au)    6E                   6E net of by-                 
                             (Pt+Pd+Rh+Ir+Ru+Au)  products (Ni&Cu)              
 Everest R3,573* per PGM     R 3,011 per PGE      R 2,814 per PGE               
         ounce               ounce                ounce                         
*Included in the cash cost is IFRIC-4 (determining whether an arrangement       
contains a lease) for R129 per PGM ounce.                                       
MIMOSA INVESTMENTS (Aquarius Platinum 50%)                                      
Mimosa Platinum Mine                                                            
Safety                                                                          
The 12-month rolling average DIIR deteriorated to 0.52 for the quarter from 0.26
in the previous quarter.  Regrettably, a fatality occurred during the quarter   
when an Underground Team Leader was fatally injured by a fall of ground.        
Mining                                                                          
Wedza Phase IV Expansion Project completed and Phase V Expansion Project        
announced                                                                       
Underground production lost the gains achieved in first quarter, falling to     
447,605 tons                                                                    
The surface stockpile increased by 33% to 308,383 tons at quarter-end, despite  
plant shutdowns                                                                 
Processing                                                                      
Plant shutdown for maintenance coupled with mill breakdown reduced tons         
processed to 365,177 tons as the surface stockpile increased                    
Concentrator plant recoveries fell 1% to 77%                                    
Total mine production decreased 22% to 33,345 PGM ounces due to maintenance     
shutdowns                                                                       
Mimosa Mine PGM Production and $ Cash Cost per PGM Ounce (Including 12 month    
rolling-average)                                                                
Revenue                                                                         
The PGM basket price for the quarter decreased 2% to $939 per PGM ounce.  The   
average nickel price over the quarter rose by 34% to $13.03 per pound from $9.71
per pound in the previous quarter.  Together with a contribution from base      
metals of approximately 33% of gross revenue, sales revenue for the quarter     
totalled $44.3 million, a decrease of $2.8 million when compared to the previous
quarter.  The gross cash margin decreased to 68% from 76% in the previous       
quarter.                                                                        
Operations                                                                      
During the quarter mining operations hoisted 456,740 tons compared to 497,487   
tons in the previous quarter.  Tons milled during the quarter totalled 365,177  
tons, with the balance going to the stockpile, which totaled 308,383 tons at the
quarter end.                                                                    
The average plant head grade improved to 3.67 g/t, compared to 3.64 g/t in the  
previous quarter.  During November, the plant underwent a planned major         
maintenance shut down, resulting in a budgeted 10% production shortfall over the
previous quarter.  In addition, in October the plant suffered an unplanned mill 
breakdown due to a bearing failure, which had been scheduled to be changed      
concurrently with the November planned maintenance shut down.  This resulted in 
an unbudgeted 15% shortfall against planned production.  While the lost time    
resulted in a build up of the stockpile and ultimately lost production, the     
plant is now operating at capacity, and no shutdowns or maintenance stoppages   
are envisaged for the second half of the year.                                  
Recoveries decreased by 1% in the quarter to 77%.                               
Due to the concentrator plant shut down, PGM production during the second       
quarter decreased to 33,345 ounces (Aquarius attributable: 16,673 ounces).      
Mimosa: PGMs in concentrate produced (ounces)                                   
 Quarter    Pt       Pd       Rh       Au       PGMs     PGMs                   
 ended                                                   attributable           
to Aquarius            
 Dec 2006   16,810   12,856   1,316    2,363    33,345   16,672                 
 Sep 2006   21,613   16,486   1,671    2,963    42,733   21,367                 
 Jun 2006   18,904   14,417   1,475    2,599    37,395   18,697                 
Mar 2006   16,820   12,809   1,306    2,317    33,252   16,626                 
Mimosa: Base Metals in concentrate produced (tons)                              
            Mine Production           Attributable to Aquarius                  
 Quarter    Ni      Cu       Co       Ni        Cu        Co                    
ended                                                                          
 Dec 2006   449     377      14       225       189       7                     
 Sep 2006   574     475      18       287       238       9                     
 Jun 2006   506     423      15       253       211       7                     
Mar 2006   452     383      14       226       191       7                     
Operating Cash Costs                                                            
Cash costs for the quarter increased to $446 per PGM ounce, a 25% increase      
compared to the previous quarter`s figure of $356 per PGM ounce.  The increase  
in cash costs was attributable to high Zimbabwe dollar denominated costs, mainly
due to disparity between inflation rate and exchange rate and low production    
throughput due to the plant shutdown.                                           
Net of by-products, however, cash costs were negative at -$52 per PGM ounce, a  
significant windfall, even compared to $11 per PGM ounce in the previous        
quarter.                                                                        
Mimosa Operating Costs                                                          
            4E               6E                  4E net of by-products          
(Pt+Pd+Rh+Au)    (Pt+Pd+Rh+Ir+Ru+Au) (Ni, Cu& Co)                   
 Mimosa     $446 per PGM     $421 per PGE ounce  ($52) per PGE ounce            
            ounce                                                               
AQUARIUS PLATINUM (SA) CORPORATE SERVICES (PTY) LTD                             
Chromite Tailings Retreatment Plant (CTRP) (Aquarius Platinum 50%)              
Safety                                                                          
The DIIR is zero.  No Lost-Time Accidents have occurred since the project       
commenced.                                                                      
Processing                                                                      
Material processed increased 68% to 44,000 tons                                 
Recoveries decreased to 38%                                                     
Production increased 9% to 1,866 PGM ounces                                     
CTRP PGM Production & Rand Cash Costs per PGM Ounce                             
Revenue                                                                         
The PGM basket price for the quarter decreased 2% to $1,592 per PGM ounce, which
despite a weaker Rand Dollar exchange rate and higher production, resulted in R1
million fall in revenue to R17 million (Aquarius attributable: R8.5 million).   
The cash margin, though still high, fell for the quarter to 77% compared to 79% 
in the previous quarter.                                                        
Operations                                                                      
The dump material project successfully commissioned at the end of the first     
quarter resulted in a 68% increase in tons processed to 44,000 tons.  The ROM   
grade improved from 3.33g/t to 4.49g/t.  While a substantial improvement, this  
resulted in lower recoveries of 38% due to oxidization of dump materials,       
yielding 1,866 PGM ounces. (Aquarius attributable: 933 PGM ounces).  A project  
to reconfigure of the flotation circuit has commenced to improve recoveries.    
Operating Costs                                                                 
Cash costs decreased by 3% to R2,143 per PGM ounce.  The decrease in cost is a  
result of higher volumes.                                                       
              4E (Pt+Pd+Rh+Au)  6E                   6E net of by-              
                                (Pt+Pd+Rh+Ir+Ru+Au)  products                   
 CTRP         R2,143 per PGM    R1,459 per PGE       R1,384 per PGE             
ounce             ounce                ounce                      
CORPORATE MATTERS                                                               
Development of Prospective Platinum Properties in South Africa with Bakgaga     
Mining (Pty) Ltd                                                                
In October 2006 Aquarius announced the signing of a farm-in agreement between   
its wholly owned subsidiary Aquarius Platinum (SA) Corporate Services (Pty) Ltd 
and Bakgaga Mining (Pty) Ltd to drill and conduct feasibility work at           
prospective Platinum Group Metals (PGMs) bearing properties on South Africa`s   
Bushveld.                                                                       
An initial site investigation was undertaken during September 2006 with         
subsequent field mapping during October 2006.  Historical exploration data for  
the farms adjacent to the farms in the Bakgaga Project areas was obtained in    
December 2006.                                                                  
This data is currently being evaluated to determine the exploration programme   
going forward.                                                                  
Appointment of New Broker                                                       
On 13th December, Aquarius announced the appointment of Investec Bank (UK)      
Limited and Morgan Stanley & Co International Limited as joint corporate brokers
to Aquarius Platinum on the London Stock Exchange.                              
Further Expansion in Production Announced at Mimosa                             
Subsequent to the end of the quarter, on 9th January 2007, Aquarius announced an
approved low capital cost expansion to increase annual production capacity to   
195,000 PGM ounces (100,000 platinum ounces in concentrate) at the Mimosa       
Platinum Mine in Zimbabwe.                                                      
The expansion project, known as "Wedza Phase V", follows four earlier successful
expansion projects at Mimosa and is expected to increase annual PGM production  
from 168,750 PGM ounces to 195,000 PGM ounces.  The increase in mining will come
from the South Hill ore body where current operations are based, increasing     
throughput by 17% from 150,000 tons to 175,000 tons milled per month.  The      
expansion will not have an impact on day-to-day operations, or have any material
impact on the life-of-mine.                                                     
Total capital cost of the expansion, which has an estimated payback period of   
twenty-four months, is forecast at $23.2 million.  It will be funded from       
retained cash flows at Mimosa level.                                            
Conversion of Mining Licenses to New Order Rights                               
On 24th October 2006 Aquarius announced that the South African Department of    
Minerals and Energy (DME) approved AQPSA`s applications for the new order mining
rights conversions in respect of all three of its mines: Kroondal, Marikana and 
Everest.  Consequently, AQPSA is now in full compliance with the South African  
Mineral and Petroleum Resources Development Act 2002, having exceeded the       
requirement for 26% Black Economic Empowerment ownership by 2014.               
Aquarius purchases 3.5% of South African subsidiary from SavCon                 
On 7th November, Aquarius announced that an agreement was reached with Black    
Empowerment partner SavCon for the acquisition by AQP of a 3.5% equity interest 
in AQPSA from SavCon for a cash consideration of R342.5 million.  The           
transaction represented a partial implementation of the final phase of the Black
Economic Empowerment transaction approved by shareholders in Special General    
Meeting on 11 October 2004 and increased AQP`s equity interest in AQPSA from    
50.5% to 54%.  Implementation requires South African DME approval as per section
9 of the AQPSA`s converted mining rights.                                       
Agreement with Bakgaga Mining                                                   
On 23rd October 2006 Aquarius announced that through its wholly owned subsidiary
Aquarius Platinum (SA) Corporate Services (Pty) Ltd ("ASACS") that it signed a  
farm-in agreement with Bakgaga Mining (Pty) Ltd to drill and conduct feasibility
work at prospective Platinum Group Metals (PGMs) bearing properties on South    
Africa`s Bushveld.                                                              
More information on all the corporate matters can be found at                   
www.aquariusplatinum.com                                                        
Statistical Information: Kroondal P&SA1                                         
Statistical Information: Marikana P&SA2                                         
Statistical Information: Everest                                                
Statistical Information: Mimosa                                                 
Note: Cash Cost Per ROM ton calculated using milled tonnage                     
Statistical Information: Chrome Tailings Retreatment Plant                      
Aquarius Platinum Limited                                                       
Incorporated in Bermuda                                                         
Exempt company number 26290                                                     
Board of Directors                                                              
Nicholas Sibley     Non-executive Chairman                                      
Stuart Murray       Chief Executive Officer                                     
David Dix           Non-executive                                               
Timothy Freshwater  Non-executive                                               
Edward Haslam       Non-executive                                               
Sir William Purves  Non-executive                                               
Patrick Quirk       Non-executive                                               
Zwelakhe Sisulu     Non-executive                                               
Kofi Morna          Alternate to Zwelakhe Sisulu                                
Audit/Risk Committee                                                            
Sir William Purves (Chairman)                                                   
David Dix                                                                       
Edward Haslam                                                                   
Nicholas Sibley                                                                 
Remuneration/Succession Planning Committee                                      
Edward Haslam (Chairman)                                                        
Nicholas Sibley                                                                 
Nomination Committee                                                            
The full Board comprises the Nomination Committee                               
Company Secretary                                                               
Willi Boehm                                                                     
Issued Capital                                                                  
At 31 December 2006, the Company had on issue:                                  
84,575,558 fully paid common shares and 2,020,320 unlisted options              
Substantial Shareholders 31       Number of     Percentage                      
December 2006                     Shares                                        
Impala Platinum Holdings Ltd      7,127,276     8.43                            
Nutraco Nominees Limited          5,877,403     6.95                            
Trading Information                                                             
ISIN number BMG0440M1029                                                        
 Broker (LSE) (Joint)       Broker (ASX)              Sponsor (JSE)             
                                                                                
Morgan Stanley & Co        Euroz Securities          Investec Bank Limited     
 International Limited      Level 14, The Quadrant    100 Grayston Drive        
 20 Cabot Square            1 William Street          Sandown                   
 Canary Wharf               Perth WA 6000             Sandton 2196              
London, E14 4QW                                                                
                                                                                
 Telephone:                 Telephone:                Telephone:                
 +44 (0) 20 7425 8000       +61 (0)8 9488 1400        +27 (0)11 286 7326        
Facsimile:                 Facsimile:                Facsimile:                
 +44 (0)20 7425 8990        +61 (0)8 9488 1478        +27 (0)11 291 1066        
                                                                                
 Investec Securities                                                            
Limited                                                                        
 Investec Bank (UK) Limited                                                     
 2 Gresham Street                                                               
 London,  EC2V 7QP                                                              
Telephone:                                                                     
 +44 (0)20 7597 5970                                                            
 Facsimile:                                                                     
 +44 (0)20 75975120                                                             
Aquarius Platinum (South Africa) (Proprietary) Ltd.                             
50.5% Owned                                                                     
(Incorporated in the Republic of South Africa)                                  
Registration Number 2000/000341/07                                              
Block A, 1st Floor, The Great Wall Group Building                               
5 Skeen Boulevard, Bedfordview                                                  
South Africa 2007                                                               
P O Box 1282                                                                    
Bedfordview South Africa 2009                                                   
Telephone:     +27 (0)11 455 2050                                               
Facsimile:     +27 (0)11 455 2095                                               
Email:         info@aquariussa.co.za                                            
Aquarius Platinum Corporate Services Pty Ltd                                    
100% Owned                                                                      
(Incorporated in Australia)                                                     
ACN 094 425 555                                                                 
Level 4, Suite 5, South Shore Centre,                                           
85 The Esplanade, South Perth, WA  6151,Australia                               
PO Box 485                                                                      
South Perth, WA 6151, Australia                                                 
Telephone:     +61 (0)8 9367 5211                                               
Facsimile:     +61 (0)8 9367 5233                                               
Email:         info@aquariusplatinum.com                                        
AQPSA Management                                                                
Stuart Murray            Executive Chairman                                     
Gert Ackerman            Managing Director                                      
Ayanda Khumalo           Finance Director                                       
Anton Wheeler            Operations Director                                    
Graham Ferreira          General Manager Finance & Company Secretary            
Hugo Holl                General Manager Everest                                
Robert Mallinson         General Manager Marikana                               
Gordon Ramsay            General Manager Projects                               
Abraham (Rudi) Rudolph   General Manager Kroondal                               
Gabriel de Wet           General Manager Engineering                            
Mimosa Mine Management                                                          
Alex Mhembere            Managing Director                                      
Winston Chitando         Finance Director                                       
Herbert Mashanyare       Technical Director                                     
Peter Chimboza           Operations Director                                    
Glossary                                                                        
A$             Australian Dollar                                                
Aquarius       Aquarius Platinum Limited                                        
ABET           Adult Basic Education Training programme                         
APS            Aquarius Platinum Corporate Services Pty Ltd                     
AQPSA          Aquarius Platinum (South Africa) Pty Ltd                         
ASACS          Aquarius Platinum (SA) (Corporate Services) (Pty) Limited        
CTRP           Chromite Ore Tailings Retreatment Operation                      
DIFR           Disabling Injury Incidence Rate - being the number of lost-time  
injuries expressed as a rate per 1,000,000 man-hours worked       
DIIR           Disabling Injury Incidence Rate - being the number of lost-time  
              injuries expressed as a rate per 200,000 man-hours worked         
DME            South African Government Department of Minerals and Energy       
DMS            Dense Media Separation                                           
Dollar or $    United States Dollar                                             
EMPR           Environmental Management Programme Report                        
Everest        Everest Platinum Mine                                            
Great Dyke Reef     A PGE bearing layer within the Great Dyke Complex in        
              Zimbabwe                                                          
g/t            Grams per tonne, measurement unit of grade (1g/t = 1 part per    
              million)                                                          
JORC code      Australasian code for reporting of Mineral Resources and Ore     
              Reserves                                                          
JSE            JSE Limited                                                      
Kroondal       Kroondal Platinum Mine or P&SA1 at Kroondal                      
LHD            Load Haul Dump machine                                           
Marikana       Marikana Platinum Mine or P&SA2 at Marikana                      
Mimosa         Mimosa Mining Company (Private) Limited                          
NOSA           National Occupational Safety Association                         
PGE(s) (6E)    Platinum Group Elements plus Gold.  Five metallic elements       
              commonly found together which constitute the platinoids           
              (excluding Os (osmium)).  These are Pt (platinum), Pd             
              (palladium), Rh (rhodium), Ru (ruthenium), Ir (iridium) plus Au   
(gold)                                                            
PGM(s) (4E)    Platinum Group Metals plus Gold.  Aquarius reports the PGMs as   
              comprising Pt+Pd+Rh plus Au (gold) with the Pt, Pd and Rh being   
              the most economic platinoids in the UG2 Reef.                     
P&SA1          Pooling & Sharing Agreement between AQPSA and RPM Ltd on Kroondal
P&SA2          Pooling & Sharing Agreement between AQPSA and RPM Ltd on Marikana
R              South African Rand                                               
RK1            Consortium comprising Aquarius Platinum (SA) (Corporate Services)
(Pty) Limited (ASACS), Ivanhoe Nickel and Platinum Limited and    
              Sylvania South Africa (Pty) Ltd (SLVSA).                          
ROM            Run of Mine.  The ore from mining which is fed to the            
              concentrator plant.  This is usually a mixture of UG2 ore and     
waste.                                                            
RPM            Rustenburg Platinum Mines Limited                                
SavCon         The Savannah Consortium. The principal Black Empowerment Investor
              in Aquarius Platinum                                              
TKO            TKO Investment Holdings Limited                                  
Ton            1 Metric tonne (1,000kg)                                         
UG2 Reef       A PGE bearing chromite layer within the Critical Zone of the     
              Bushveld Complex                                                  
Z$             Zimbabwe Dollar                                                  
A comprehensive announcement is available on the company`s website.             
For further information please contact:                                         
In Australia:                                                                   
Willi Boehm                                                                     
Aquarius Platinum Corporate Services Pty Ltd                                    
+61 (0)8 9367 5211                                                              
In United Kingdom:                                                              
Nick Bias                                                                       
BuckBias Limited                                                                
+ 44 (0)7887 920 530                                                            
Alex Buck                                                                       
BuckBias Limited                                                                
+44 (0)7392 740 452                                                             
In South Africa:                                                                
Stuart Murray                                                                   
Aquarius Platinum (South Platinum) (Pty) Ltd                                    
+27 (0)11 455 2050                                                              
Charmane Russell                                                                
Russell & Associates                                                            
+27 (0)11 880 3924                                                              
or visit:  www.aquariusplatinum.com                                             
Date: 25/01/2007 09:00:02 Produced by the JSE SENS Department.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: