Wed 7 Feb 2007, 11:03 AQP - Aquarius Platinum Limited - Half Year Financ
AQP
 AQP                                                                             
    AQP - Aquarius Platinum Limited - Half Year Financial Results (31 December  
2006)                                                                           
    Aquarius Platinum Limited                                                   
(Incorporated in Bermuda)                                                   
    Registration Number: EC26290                                                
    Share Code JSE: AQP        ISIN Code:   BMG0440M1029                        
    ("Aquarius Platinum")                                                       
Aquarius Platinum Half Year Financial Results (31 December 2006)            
    Record Interim Profits up 229% and Doubling of Interim Dividend             
                                                                                
                                                                                
Highlights of the half year                                                     
    *    Net Profit more than triples to $85.4 million (100.4 US cents per      
         share)                                                                 
    *    Record half year production, at 277,156 PGM ounces attributable        
*    Interim dividend doubles to 12 US cents per share                      
    Operational                                                                 
    *    On-mine production up 30% to 471,403 PGM ounces (Aquarius              
         attributable: up 45% to 277,156 PGM ounces)                            
*    P&SA1 at Kroondal builds momentum, production increased 3% to 238,900  
    *    PGM ounces (Aquarius attributable: 119,450 PGM ounces)                 
    *    P&SA2 at Marikana comes of age, adding 45% new production to 69,941    
         PGM ounces (Aquarius attributable 34,971 PGM ounces)                   
*    New Everest Mine ramp-up boosts production to 82,908 PGM ounces        
    *    Mimosa Mine production up 6% to 76,078 PGM ounces despite Q2           
         production issues (Aquarius attributable: 38,039 PGM ounces)           
    Financial                                                                   
*    Revenues more than double for the period to $330.8 million             
    *    Average basket prices increased to $1,274 per PGM ounce in South       
         Africa and $949 per PGM ounce in Zimbabwe                              
    *    Net profit before non cash charges up 190% at $151.8 million           
*    Net profit attributable to members of Aquarius  (to IFRS) up 229% at   
         $85.4 million (100.4 cents per share)                                  
    *    Consolidated cash balances at period end $263.6 million, up $102       
         million since June 2006.                                               
Strategic                                                                   
    *    Completed conversion of mining rights to new order licenses approved   
         at all South African mines                                             
    *    Agreement with Bakgaga Mining to drill and conduct feasibility work at 
prospective PGM properties in South Africa                             
    *    Mimosa Phase IV expansion completed and Phase V expansion to 195,000   
         PGM ounces announced                                                   
    *    Purchase by Aquarius of 3.5% of South African subsidiary from BEE      
Partner SavCon                                                         
    Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said,    
    "The financial performance of Aquarius for the first six months of the 2007 
    financial year has been aided by a strong PGM basket price which together   
with our increased production has seen our net profit more than triple to   
    $85.4 million compared with the same period last year. This is despite of   
    the second quarter challenges as we focus on mine development for longer-   
    term benefits, in order to continue to deliver production into the high     
commodity price environment.                                                
    Our focus in the first half of the financial year has been solidly on       
    improving development at all operations, and all are now on a better        
    footing for continued growth and improved efficiencies in the second half   
of the Financial Year and beyond.  Concurrently, our cash balances have     
    increased to $263.6 million dollars, permitting the board to double the     
    interim dividend.                                                           
                                                                                
Financial results: Half Year to 31 December 2006                            
    Aquarius Platinum Limited announces consolidated earnings for the half year 
    to 31 December 2006 of $85.4 million (100.4 US cents per share), up 229% on 
    the previous corresponding six month period December 2005, and equivalent   
to 99.8% of the net profit for the financial year ended 30 June 2006.       
    Revenues from ordinary activities for the period rose 107% to $330.8        
    million (comprising sales revenue of $322.3 million and interest and other  
    income of $8.4 million) up from $159.7 million (sales revenue $157.7        
million and interest and other income of $2.0 million) in the previous      
    corresponding period (pcp). The increase in revenue has been driven by      
    higher PGM basket prices and a 45% increase in Aquarius` attributable PGM   
    production.  PGM basket prices increased 48% in South Africa, and 49% in    
Zimbabwe, with strong base metal prices (Nickel up 63% and Copper up 125%)  
    which contribute approximately 33% of Mimosa`s revenue.                     
    PGM production for the period increased 45% to 277,156 operating PGM ounces 
    attributable to Aquarius at a total cost of production of $138.9 million,   
up 41%.                                                                     
    Amortisation and depreciation at $18.9 million (December 2005, $12.8m) was  
    in line with the 45% increase in production over the previous corresponding 
    period.                                                                     
Net finance income for the period of $0.7 million, comprised $8.0 million   
    in interest income and $7.3 million in interest expense. Interest expense   
    was higher compared to the previous corresponding period due to an increase 
    in pipeline finance which is directly related to sales revenue from PGM     
concentrate sales.                                                          
    Aquarius` cash balances of $264 million at 31 December 2006 have grown      
    sharply, and are expected to increase progressively in the second half of   
    the year in the current high commodity environment, as group production     
increases.                                                                  
    The Directors have declared an interim dividend of 12 US cents per share    
    (2005: 6 US cents per share) payable on 23 March 2007 to shareholders       
    registered on 2 March 2007.                                                 
Group Financials by Operation                                               
                                                                                
                                                                                
$ million       Kroondal Marikana   Everest   Mimosa  CTRP   Corporate  Total   
PGM ounces       119,450  34,971     82,908    38,039  1,788  -          277,15 
(attributable)                                                      6           
Revenue (net of  132.6    39.8       91.3      57.7    2.6    3.9        327.9  
FX sales                                                                        
variance)                                                                       
Cost of sales    (47.5)   (21.3)     (37.6))   (16.5)  (0.8)  -          (123.7 
                                                                   )            
Depreciation &   (4.9)    (4.4)      (4.4)     (1.4)   (0.1)             (15.2) 
Amortisation                                                                    
Gross profit     80.2     14.1       49.3      39.8    1.7    3.9        189.0  
Amortisation of  (3.4)    -          -         (0.4)   -      -          (3.8)  
fair value                                                                      
Gross profit     76.8     14.1       49.3      39.4    1.7    3.9        185.2  
after FVU                                                                       
Corporate admin                                               (3.5)      (3.5)  
& other costs                                                                   
Foreign          0.3      0.2        1.4       2.5     -      0.2        4.6    
currency                                                                        
gain/(loss)                                                                     
Finance charges  -        -          (1.4)     (0.6)   -      (5.3)      (7.3)  
Profit/(loss)    77.1     14.3       49.3      41.3    1.7    (4.7)      179.0  
before tax                                                                      
Tax Expense                                    (7.5)          (38.7)     (46.2) 
Profit/(loss)    77.1     14.3       49.3      33.8    1.7    (43.4)     132.8  
after tax                                                                       
Minority                                                      (47.4)     (47.4) 
interest                                                                        
Profit/(loss)    77.1     14.3       49.3      33.8    1.7    (90.8)     85.4   
after minority                                                                  
interest                                                                        
    Production                                                                  
    Total on-mine production increased 30% to 471,403 PGM ounces.  Attributable 
group operating production for the half year was 277,156 PGM ounces, an     
    increase of 45% period on period.  The Group`s production profile will      
    continue to increase in the second half as operational ramp-ups continue.   
    Aquarius Group PGM Production                                               
Half Year Total Mine & Attributable Production (PGM Ounces)                 
    Production by Mine and Production by Mine attributable to Aquarius          
                                                                                
                                                                                
PGMs (4E)  Production by Mine        Production attributable to                 
                                   Aquarius                                     
          Half Year    Half Year     Half Year     Half Year                    
          endedDec     endedDec      endedDec      endedDec 2006                
2005         2006          2005                                       
Kroondal   232,537      238,900       116,269       119,450                     
Marikana   48,111       69,941        37,716(a)     34,971                      
Everest    7,111        82,908        7,111(b)      82,908                      
Mimosa     71,762       76,078        35,881        38,039                      
CTRP       2,897        3,576         1,449         1,788                       
Total      362,418      471,403       198,426       277,156                     
    (a) Marikana implemented with effect from second quarter, resulting         
attributable production reducing by 10,395 PGM ounces for the period.       
    (b) Everest costs were capitalised to 31 December 2005.  The mine was       
    handed over to operations on 1 January 2006. *P&SA2 at                      
    Foreign Exchange                                                            
The Rand proved relatively volatile through the 6 months to December 2006,  
    averaging 7.23 for the period, despite opening and closing the period at    
    around 7.03.                                                                
    Rand : $ Exchange Rate                                                      
Platinum Group Metal Prices                                                 
    Commodity prices through the second half remained firm consolidating on the 
    strong gains realised over the first half.  The chart below illustrates the 
    individual prices for the platinum, palladium, rhodium and gold.  Platinum  
prices peaked in November at over $1,300 per ounce on news of the possible  
    introduction of a Platinum ETF, while rhodium closed the year firm, having  
    peaked once again above $6,000 per ounce due to continued physical demand.  
    Gold and palladium also maintained gains made over the period, closing the  
second half of the financial year at similar price levels to the start.     
    Platinum Group Metal Prices (Dollar per PGM ounce)                          
    The Rand basket price at South African operations averaged $1,274 per PGM   
    ounce over the second half.  In Rand terms, this is equal to R9,211 per PGM 
ounce.  In Zimbabwe, the Dollar basket price averaged $949 per PGM ounce.   
    In addition, by-product base metals copper and nickel recorded strong       
    prices at Mimosa, with copper averaging $3.40/lb and nickel averaging       
    $11.00/lb over the half year. .                                             
Platinum Group Metal Basket Prices ($ and Rand per ounce PGM ounce)         
    Financials                                                                  
                                                                                
                                                                                
Aquarius Platinum Limited                                                       
Consolidated Income Statement                                                   
For the Half Year ended 31 December 2006                                        
$`000                                                                           
Audit Reviewed                                                                  
                                       Half Year Ended     Year Ended           
                                Note:  31/12/06  31/12/05  30/6/06              
Revenue                          (i)    330,774   159,706   426,569             
Foreign exchange loss on sales   (ii)   (2,914)   (2,297)   13,228              
Cost of sales (including D&A)    (iii)  (138,822) (98,550)  (223,064)           
Gross profit                            189,038   58,859    216,733             
Amortisation of fair value       (iv)   (3,756)   (3,725)   (7,162)             
uplift of mineral properties                                                    
Gross profit after amortisation         185,282   55,134    209,571             
of fair value uplift                                                            
Corporate Admin & other          (v)    (3,574)   (1,983)   (8,027)             
operating costs                                                                 
Finance costs                    (vi)   (7,322)   (2,324)   (10,383)            
Foreign exchange gains/(losses)  (vii)  4,598     1,207     913                 
Profit before tax                       178,984   52,034    192,074             
Income tax expense               (viii) (46,175)  (12,581)  (51,071)            
Profit after tax                        132,809   39,453    141,003             
Minority interest                (ix)   (47,438)  (13,538)  (55,373)            
Net profit                              85,371    25,915    85,630              
Earnings per share (basic -             100.39    31.50     100.87              
cents)                                                                          
    Notes on the Consolidated Income Statement                                  
    (i)  Sales revenue increase reflects impact of increased PGM production and 
higher PGM basket price achieved                                       
    (ii)      Reflects effects of adjusting revenue recorded at time of         
         production at Kroondal, Marikana and CTRP to actual receipts received  
         at the end of the four month pipeline                                  
(iii)     Increase in cost of sales is related to the 45% increase in PGM   
         production                                                             
    (iv)      Relates to amortisation of purchased goodwill associated with the 
         Kroondal, Marikana and Mimosa mines                                    
(v)  Relates to administration costs of the Aquarius Group                  
    (vi) Finance costs are higher to Dec `06 due to increased pipeline finance  
         as a result of increased sales revenue, and interest on Everest mine   
         no longer capitalised,                                                 
(vii)     Reflects foreign exchange movements on net monetary assets        
    (vii)     Income tax expense for the period for AQPSA and Mimosa            
    (ix)      Minority interests reflect 49.5% outside equity interest of the   
         Savannah Consortium (SavCon) and Impala Platinum Holdings Limited      
(Implats) in AQPSA                                                     
Aquarius Platinum Limited                                                       
Consolidated Cash Flow Statement                                                
Half year ended 31 December 2006                                                
$`000                                                                           
Audit Reviewed                                                                  
                                 Half year ended         Year ended             
                        Note:    31/12/06     31/12/05    30/06/06              
Net operating cash       (i)      159,026      58,701      175,531              
inflow                                                                          
Net investing cash       (ii)     (25,489)     (75,406)    (112,880)            
outflow                                                                         
Net financing cash       (iii)    (36,895)     23,496      27,161               
outflow                                                                         
Net increase in cash              96,642       6,791       89,812               
held                                                                            
Opening cash balance              162,425      75,251      75,251               
Exchange rate movement   (iv)     4,496        2,912       (2,638)              
on cash                                                                         
Closing cash balance              263,563      84,954      162,425              
Notes on the Consolidated Cash Flow Statement                               
    (i)       Net operating cash flow includes $180 million inflow from         
              operations, income tax paid $22 million and $0.7 million net      
              finance income                                                    
(ii)      Reflects payments for mine development and development costs      
    (ii)      Reflects repayment of loans $23 million, proceeds of the issue of 
              shares on exercise of employee options $1.5 million and payment   
              of dividends of $15 million                                       
(iii)     Reflects movement of Rand against the US dollar                   
    Aquarius Platinum Limited                                                   
    Consolidated Balance Sheet                                                  
    At 31 December 2006                                                         
$`000                                                                       
    Audit Reviewed                                                              
                                    Half year ended        Year ended           
                           Note:    31/12/06    31/12/05   30/06/06             
Assets                                                                          
Cash assets                          263,563     84,954     162,425             
Current receivables         (i)      71,245      46,098     66,721              
Other current assets        (ii)     27,610      22,798     19,828              
Property, plant and         (iii)    212,140     208,811    206,626             
equipment                                                                       
Mining assets               (iv)     279,145     270,199    247,601             
Other non-current assets             8,571       460        6,994               
Total assets                         862,274     633,320    710,195             
Liabilities                                                                     
Current liabilities         (v)      48,237      37,089     35,463              
Non-current payables        (vi)     124,410     147,626    130,104             
Non-current interest-       (vii)    34,843      44,042     45,372              
bearing liabilities                                                             
Other non-current           (viii)   132,813     85,811     105,419             
liabilities                                                                     
Total Liabilities                    340,303     314,568    316,358             
Net assets/(liabilities)             521,971     318,752    393,837             
                                                                                
Equity                                                                          
Parent entity interest               392,814     270,578    315,559             
Minority interest                    129,157     48,174     78,278              
Total Equity                         521,971     318,752    393,837             
    Notes on the December 06 Consolidated Balance Sheet                         
(i)  Reflects debtors receivable on increased PGM concentrate sales         
    (ii) Reflects PGM concentrate inventory                                     
    (iii) Represents fixed assets within the Group                              
    (iv) Increase in mining assets reflects Kroondal, Marikana, Mimosa and      
Everest mining (mining rights)) assets                                 
    (v)  Includes tax payable ($11 million) and creditors ($37 million)         
    (vi) Includes non interest bearing portion of AQPSA shareholder loans (     
    Implats $49 million and Savcon $73 million)                                 
(vii) Includes interest bearing debt payable to RMB ($27 million), embedded 
    lease re Everest mine $7 million.                                           
    (viii) Reflects deferred tax liabilities $91 million, provision for closure 
    costs $41 million                                                           
OPERATIONS                                                                  
    AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum 50.5%)        
    P&SA 1 at Kroondal                                                          
    Safety                                                                      
The (12-month rolling average) DIIR improved to 0.93 during the half year.  
    Kroondal achieved 1,777,521 fatality-free shifts to the end of December     
    2006.                                                                       
    Mining                                                                      
*    Total production increased 5% to 3.5 million tons                      
    *    Significant primary development completed to improve face-availability 
         and mining flexibility                                                 
    *    K5 Project remains ahead of schedule                                   
*    Head-grade averaged 2.86 g/t for the first half                        
    Processing                                                                  
    *    Plant processed a record 3.4 million tons                              
    *    Concentrator recoveries steady at 77%                                  
*    Record production of 238,902 PGM ounces, a 3% increase period on       
         period                                                                 
    Revenue                                                                     
    The PGM basket price for the half year held strong at $1,299 per PGM ounce. 
With higher production volumes, mine revenue increased to R1.9 billion for  
    the half year (AQPSA share 50%).  The on-mine cash margin for the half year 
    to December 2006 rose to 64% compared with 53% for the first half to        
    December 2005.                                                              

    Operations                                                                  
    Production for the first six months increased 9% compared with the first    
    half 2006, totalling 3.5 million tons: 3.2 million tons from underground    
operations and 0.3 million tons from open pit operations.  Considerable     
    underground development was completed during the first half. In the second  
    quarter, some production was adversely impacted by downtime mechanised      
    mining machinery.  This has since been rectified with the underground       
contractor, Murray & Roberts Cementation, by recruiting additional          
    personnel and a revision of the maintenance, replacement and rebuild        
    programmes.  By the end of period, the stockpile was increased to 100,000   
    tons in preparation for the Christmas close and to mitigate the Q3 holiday  
impact.                                                                     
    Tons processed increased 5% to 3.4 million tons.  The plant head grade fell 
    slightly to 2.86g/t. for the first half for two reasons: first, the         
    considerable underground development and second a planned 3-day maintenance 
shutdown at both the K1 and K2 Concentrators.  It is anticipated that the   
    high rate of development that has been ongoing at Kroondal, will decrease   
    in the second half and that this should result in a positive effect on the  
    head grade and unit cost.  Nevertheless, despite the operational            
challenges, PGM production increased by 3% to a record 238,900 PGM ounces   
    for the half year (Aquarius attributable: 119,450 PGM ounces).              
    Operating Cash Costs                                                        
    Cash costs for the first half increased to R204 per ROM ton and $396 per    
PGM ounce.                                                                  
                                                                                
    Kroondal: Operating Cash Costs                                              
                                                                                

                4E (Pt+Pd+Rh+Au)   6E (Pt+Pd+Rh+Ir+Ru+Au)  6E net of by-        
                                                           products (Ni&Cu)     
    Kroondal    R2,866 per PGM     R 2,359 per PGE ounce   R2,211 per PGE       
ounce                                      ounce                
    Operating cash costs include ledging and primary development costs of R395  
    per PGM ounce (up 32% period on period), secondary development costs of R49 
    per PGM ounce (up 11% period on period) and engineering infrastructure      
costs of R236 per PGM ounce (up 82% period on period).  Cash cost of        
    stoping for Kroondal were R763 per PGM ounce, 2 % increase period on        
    period.  It should be noted that operating costs also include costs         
    associated with the new K5 shaft of R60 per PGM ounce.  The K5 Shaft is in  
a ramp-up phase and therefore attracts high relative unit costs at this     
    stage.                                                                      
    Kroondal Operating Cash Costs Reconciliation                                
                                                                                

    Rand per PGM ounce            1H (Dec 2006)    1H (Dec 2005)   Variance     
    Cash costs                    2,866            2,458           17%          
    Ledging and primary           (395)            (299)           32%          
development costs                                                           
    Secondary development costs   (49)             (44)            11%          
    Engineering infrastructure    (236)            (129)           82%          
    costs                                                                       
Cash cost after adjustments   2,186            1,986           10%          
    It is expected that the unit costs will start to decrease going forward.    
    It is anticipated that primary development will reduce in the following     
    quarter, followed by a reduction in equipping and engineering               
infrastructure in the subsequent quarter.  Ensuring adequate face           
    availability and mining flexibility at Kroondal is key to the longer-term   
    management of the mine and while development has taken time the benefits    
    are now expected to be realised.                                            
P&SA 1 at Marikana                                                          
    Safety                                                                      
    The (12 month rolling average) DIIR for the half year improved to 0.43      
    compared with 0.76 in the previous corresponding period.                    

    Mining                                                                      
    *    The new opencast contractor continues to perform well                  
    *    Underground production ramp-up progressing well, totaling 359,246 tons 
for the period                                                         
    *    Open pit operations produced 722,882 tons, though bias is shifting     
         towards underground tons                                               
    *    Surface stockpile totalled 196,000 tons at end of period (though       
largely poorer openpit material)                                       
    Processing                                                                  
    *    Marikana Dense Media Separation Plant commissioned                     
    *    Record 988,000 tons processed during the quarter, a 34% increase       
period on period                                                       
    *    69,941 PGM ounces produced (Aquarius attributable 34,971 PGM ounces),  
         a 45% increase period on period                                        
    Revenue                                                                     
The PGM basket price for the half year increased 48% period on period to    
    $1,276 per PGM ounce.  Revenues increased nearly threefold to R580 million  
    from R197 million in the previous corresponding period.  Reflecting the     
    improvements in volumes, prices and operating efficiencies, the gross       
margin for the first half was 46% compared with 14% in the previous         
    corresponding period.                                                       
    Operations                                                                  
    Total production for the first 6 months increased to 1.1 million tons, made 
up of 359,246 underground tons and 722,882 open pit tons.                   
    The opencast mining contractor, MCC Mining (Pty) Ltd, is performing well    
    and is managing costs effectively as both efficiencies and output have      
    improved since their appointment.  Production in Marikana Pit B was         
accelerated to facilitate a box cut for the construction of a second        
    decline shaft, an expedient way to access the underground ore from the      
    opencast operations.  Stormwater controls and additional pumping capacity   
    have been established to prepare for the local rain-season in the third     
quarter.  As underground operations are established and ramp-up, it is      
    expected that the majority of tons will be from underground.                
    At No. 1 Shaft, 805 metres of primary development was completed during the  
    period.  A hybrid-mining method was successfully implemented.  This has     
resulted in a reduced stoping-width, thereby contributing to an increase in 
    the plant head grade.  At No. 4 Shaft 1,552 metres of primary development   
    was completed during the first half.  Some potholes were encountered in the 
    main decline ends. Infill drilling is being undertaken to determine the     
extent of the geological disturbance, resulting in a short delay in tonnage 
    build up.  Preparation of the high wall at No. 2 Shaft was completed and    
    development of the twin-decline system has commenced.                       
    The surface stockpile (predominantly comprising oxidised material) was      
196,000 tons at the end of the half year.  During the first six months, a   
    total of 988,000 tons were processed, a 34% increase period on period.      
    The plant head grade averaged 3.18g/t for the first six months.  Plant      
    recoveries increased significantly by 12% to 69%, resulting in production   
of 69,941 PGM ounces, up a substantial 45% increase period on period.       
    Operating Cash Costs                                                        
    Cash costs averaged R312 per ROM ton for the period.  Cash costs per PGM    
    ounce decreased by 5% to R4,405 period on period.  Indeed cash costs in the 
second quarter, decreased by 12% to R4,147 per PGM ounce compared with the  
    first quarter, reflecting the improving cost performance at Marikana.       
    Marikana: Operating Costs                                                   
                                                                                

               4E (Pt+Pd+Rh+Au)   6E (Pt+Pd+Rh+Ir+Ru+Au)  6E net of by-         
                                                          products (Ni&Cu)      
    Marikana   R4,405 per PGM     R3,623 per PGE ounce    R3,754 per PGE        
ounce                                      ounce                 
    New Marikana Dense Media Separation Plant                                   
                                                                                
                                                                                

    View from North of DMS tower      DMS tower in centre, with fines           
    with sink screen in the           section on the left. Background           
    foreground.                       shows coarse ore silos fed by             
overland conveyor from ROM pad.           
    Contractor dispute with Moolman Mining                                      
    Moolman Mining was the primary opencast mining contractor employed at the   
    Marikana Mine from start up in May 2002 until December 2005.  In December   
2005, AQPSA resiled from the contract with Moolman Mining on discovering    
    misrepresentations by Moolman, which induced the contract.  Moolman has     
    been replaced by MCC as opencast contractor and MCC has since improved      
    production from the opencast mine significantly at no additional cost over  
the disputed Moolmans contract rates.                                       
    In April 2006, AQPSA instituted action against Moolman arising from the     
    misrepresentation.  The action includes a damages component.  In May 2006,  
    AQPSA served an application to stay the arbitration in respect of the Rise  
and Fall claim pending the determination of the action.  In September 2006, 
    AQPSA received Moolmans` response in the application to stay the            
    arbitration as well as a plea to the action.  Moolmans delivered a          
    conditional counterclaim, comprising four components in an aggregate amount 
of ZAR472 million.  The AQPSA legal team is in the process of preparing a   
    reply in the application proceedings and a plea to the conditional          
    counterclaims.  During the course of this process, AQPSA has requested      
    further documentation from Moolmans relating to the Marikana contract.  The 
process of finalising the replying affidavit and inspection of documents    
    continues and is expected to be finalised in the Third Quarter of the 2007  
    financial year.                                                             
    It is anticipated that legal proceedings relating to the dispute may take   
years to resolve.                                                           
                                                                                
    Everest Platinum Mine                                                       
    Safety                                                                      
The (12 month rolling average) DIIR for the half year improved to 0.52      
    compared with 1.18 in the previous corresponding period.                    
    Mining                                                                      
    *    Underground ramp-up resulted in production rise to 810,540 tons        
*    Opencast production was reduced to 452,811 tonnes in favour of         
         underground production                                                 
    *    Opencast mining extended through development of the South-West Pit     
         adding 320,000 tons to the opencast reserve                            

    Processing                                                                  
    Total 1.3 million tons processed                                            
    Significant improvement in recoveries to 72% reflecting increased           
underground to openpit production blend                                     
    Production ramps up to 82,908 PGM ounces                                    
                                                                                
    Revenue                                                                     
The PGM basket price increased period on period by 34% to $1,188 per PGM    
    ounce.  The strong increase in prices, combined with significantly higher   
    volumes as the operation continues to ramp up and the positive impact of a  
    weaker average Rand Dollar exchange rate, resulted in revenues of R652      
million.  This is a significant contribution to group earnings compared     
    with R31 million in the previous corresponding period when the mine was     
    established and awarded operational status.  Although still in a ramp-up    
    phase, Everest achieved a 59% cash margin.                                  

    Operations                                                                  
    Operational ramp-up continued with opencast and underground producing a     
    total 1,263,351 tons.  Through the half year, the production of underground 
to open pit ore shifted firmly in favour of the higher quality underground  
    ore.                                                                        
    The opencast mining contractor (MCC Mining) continues to perform well.  In  
    line with the shift towards more favourable underground production,         
opencast mining declined to 452,811 tons.  As the North Pit was depleted,   
    the opencast reserve was boosted through the establishment of an extension  
    at the South-West Pit, adding an additional 320,000 tons to the opencast    
    reserve.  The opencast ROM grade fell over the period with more production  
coming from the low-grade area in the North Pit and shallow oxidised reef   
    from the South-West Pit extension.  It is anticipated that opencast grades  
    will improve during the remainder of the 2007 financial year as mining      
    extends into the deeper areas of the South-West pit yielding more competent 
reef.                                                                       
    On-reef decline development and the establishment of stoping sections       
    continued during the half year, resulting in underground production of      
    810,540 tons.  The underground head grade average 2.80g/t during the first  
six months.                                                                 
    Concentrator throughput was 1.3 million tons milled for the period          
    including stockpile consumption.  At the end of the period, the surface     
    stockpile totalled 13,743 tons.                                             
Metallurgical recoveries improved to an average 72% for the first six       
    months compared with 55% in the previous corresponding period, reflecting   
    the larger underground contribution in the feed blend.  Looking to enhance  
    recoveries further, advanced flotation process control systems were         
implemented towards the end of the period and a reduction in oxidised       
    material will result in improved recoveries during the next quarter.        
    Production for the first six months totalled 82,908 PGM ounces.  It is      
    anticipated that the ramp-up at Everest will continue through the second    
half of the 2007 financial year and that full production rates are          
    achievable in the first quarter of the 2008 financial year (Quarter to      
    September 2007).                                                            
    Operating Cash Costs                                                        
Cash costs for the period increased to R212 per ROM ton milled as a result  
    of the higher consumption of underground production, which has not yet      
    achieved steady-state and the unit cost increase from higher opencast       
    stripping ratios during the establishment of the South-West Pit.            
Consequently, cash costs per PGM ounce for the period increased by 3% to    
    R3,234 per PGM ounce.                                                       
    It is anticipated that unit costs will reduce as the underground volumes    
    ramp up to steady-state production and metallurgical recovery and head      
grade improvements are realised.                                            
                                                                                
    Everest Operating Costs                                                     
                                                                                

             4E (Pt+Pd+Rh+Au)    6E                  6E net of by-              
                                 (Pt+Pd+Rh+Ir+Ru+Au) products (Ni&Cu)           
    Everest  R3,324* per PGM     R2,735 per PGE      R2,714 per PGE             
ounce               ounce               ounce                      
    *Included in the cash cost is IFRIC-4 (determining whether an arrangement   
    contains a lease) for R128 per PGM ounce.                                   
                                                                                
Mimosa Mine (Aquarius 50%)                                                  
    Safety                                                                      
    The 12-month rolling average DIIR deteriorated to 0.47 for the period.      
    Regrettably, a fatality occurred during the half year when an Underground   
Team Leader was fatally injured by a fall of ground.                        
    Mining                                                                      
    *    Wedza Phase IV Expansion Project completed and Phase V Expansion       
         Project announced                                                      
*    Underground production increased to 935,000 tons                       
    *    The surface stockpile increased by 33% to 308,383 tons at the end of   
         the period                                                             
    Processing                                                                  
*    Tons processed increased 8% to 833,000 tons period on period despite   
         plant shutdowns                                                        
    *    Average concentrator plant recoveries steady at 78%                    
    *    Total mine production increased 6% to 76,078 ounces period on period   
(Aquarius attributable: 38,039 PGM ounces)                             
                                                                                
    Revenue                                                                     
    The PGM basket price for the period averaged $949 per PGM ounce, a 49%      
increase period on period.  The average nickel price over the period        
    averaged 63% higher at $11 per pound from and copper 125% higher at $3.40   
    per pound.  With base metals contributing approximately 33% of gross        
    revenue, sales revenue for the period was $91 million (Aquarius             
attributable: 50%), a 65% increase period on period.                        
                                                                                
    Operations                                                                  
    During the period mining operations hoisted 935,143 tons compared with      
861,995 tons in the previous corresponding period.  Tons milled during the  
    quarter totalled 833,000 tons, with the surface stockpile at the end of the 
    period 308,383 tons.                                                        
    The average plant head grade for the period was steady at 3.66 g/t.  During 
November, the plant underwent a planned major maintenance shut down,        
    resulting in a budgeted production shortfall over the previous quarter.  In 
    addition, during October the plant suffered an unplanned mill breakdown due 
    to a bearing failure, which had been scheduled to be changed concurrently   
with the November planned maintenance shut down.  This resulted in          
    additional unbudgeted production shortfall.  While the lost time resulted   
    in a build up of the stockpile and ultimately lost production, the plant is 
    now operating at capacity, and no shutdowns or maintenance stoppages are    
envisaged for the second half of the year.                                  
    Recoveries for the period were steady at 78%.  Despite the plant shutdowns, 
    production for the period increased 6% to 76,078 PGM ounces (Aquarius       
    attributable: 38,039 PGM ounces.  This increase is a consequence of the     
Phase IV expansion project, completed during the period.  In January 2007,  
    a new Phase V expansion was announced, targeting an annual 195,000 PGM      
    ounces, with full production anticipated in July 2007.                      
    Operating Cash Costs                                                        
Cash costs for the period increased to $36 per ROM ton and by 16% to $395   
    per PGM ounce period on period.  The increase in cash costs was             
    attributable to high Zimbabwe dollar denominated costs, mainly due to       
    disparity between inflation rate and exchange rate and lower production     
throughput due to the plant shutdown.                                       
    Cash costs net of by-products were -$10 per PGM ounce, a significant        
    windfall, even compared with $96 per PGM ounce in the previous quarter.     
    Mimosa Operating Costs                                                      

                                                                                
                4E              6E                   4E net of by-products      
                (Pt+Pd+Rh+Au)   (Pt+Pd+Rh+Ir+Ru+Au)  (Ni, Cu& Co)               
Mimosa      $395 per PGM    $374 per PGE ounce   ($10) per PGE ounce        
                ounce                                                           
    AQUARIUS PLATINUM (SA) CORPORATE SERVICES (PTY) LTD                         
    Chromite Tailings Retreatment Plant (CTRP) (Aquarius Platinum 50%)          
Safety                                                                      
    The DIIR is zero.  No Lost-Time Accidents have occurred since the project   
    commenced.                                                                  
    Processing                                                                  
*    70,000 ton of feed processed                                           
    *    Average recoveries for the period increased to 48%                     
    *    3,576 PGM ounces produce (Aquarius attributable: 1,788 PGM ounces) a   
         45% increase compared with the previous corresponding period           

    Revenue                                                                     
    The PGM basket price for the period increased 57% to $1,606 per PGM ounce.  
    The CTRP enjoys a high rhodium content hence the higher basket prices       
achieved.  The strong basket price and weaker Rand Dollar exchange rate     
    resulted in revenues more than doubling to R35 million (Aquarius            
    attributable: 50%).  The cash margin for the period was 78%.                
                                                                                
Operations                                                                  
    The dump material project successfully commissioned during the first        
    quarter resulted in a 68% increase in tons processed in the second quarter  
    and 70,000 tonnes for the first half in total..  Over the period the ROM    
grade improved 37% to 4.04g/t compared with the previous corresponding      
    period.  Average recoveries were 45% higher at 48% period on period,        
    however, while a substantial improvement in throughput was experienced in   
    the second quarter, lower recoveries resulted compared with the first       
quarter due to oxidisation of dump materials.  To rectify the situation, a  
    project to reconfigure the flotation circuit has commenced.                 
                                                                                
    Operating Costs                                                             
Cash costs decreased by 32% to R 2,172 per PGM ounce.  The decrease in      
    costs is a result of higher volumes.                                        
                  4E (Pt+Pd+Rh+Au)  6E (Pt+Pd+Rh+Ir+Ru+Au)   6E net of by-      
                                                             products           
CTRP          R2,172 per PGM    R 1,510  per PGE ounce   R931 per PGE       
                  ounce                                      ounce              
    CORPORATE MATTERS                                                           
    Development of Prospective Platinum Properties in South Africa with Bakgaga 
Mining (Pty) Ltd                                                            
    In October 2006 Aquarius announced the signing of a farm-in agreement       
    between its wholly owned subsidiary Aquarius Platinum (SA) Corporate        
    Services (Pty) Ltd and Bakgaga Mining (Pty) Ltd to drill and conduct        
feasibility work at prospective Platinum Group Metals (PGMs) bearing        
    properties on South Africa`s Bushveld.                                      
    An initial site investigation was undertaken during September 2006 with     
    subsequent field mapping during October 2006.  Historical exploration data  
for the farms adjacent to the farms in the Bakgaga Project areas was        
    obtained in December 2006. This data is currently being evaluated to        
    determine the exploration programme going forward.                          
                                                                                
Appointment of New Broker                                                   
    On 13th December, Aquarius announced the appointment of Investec Bank (UK)  
    Limited and Morgan Stanley & Co International Limited as joint corporate    
    brokers to Aquarius Platinum on the London Stock Exchange.                  
Further Expansion in Production Announced at Mimosa                         
    Subsequent to the end of the half year, on 9th January 2007, Aquarius       
    announced an approved low capital cost expansion to increase annual         
    production capacity to 195,000 PGM ounces (100,000 platinum ounces in       
concentrate) at the Mimosa Platinum Mine in Zimbabwe.                       
    The expansion project, known as "Wedza Phase V", follows four earlier       
    successful expansion projects at Mimosa and is expected to increase annual  
    PGM production from 168,750 PGM ounces to 195,000 PGM ounces.  The increase 
in mining will come from the South Hill ore body where current operations   
    are based, increasing throughput by 17% from 150,000 tons to 175,000 tons   
    milled per month.  The expansion will not have an impact on day-to-day      
    operations, or have any material impact on the life-of-mine.                
Total capital cost of the expansion, which has an estimated payback period  
    of twenty-four months, is forecast at $23.2 million.  It will be funded     
    from retained cash flows at Mimosa level.                                   
    Conversion of Mining Licenses to New Order Rights                           
On 24th October 2006 Aquarius announced that the South African Department   
    of Minerals and Energy (DME) approved AQPSA`s applications for the new      
    order mining rights conversions in respect of all three of its mines:       
    Kroondal, Marikana and Everest.  Consequently, AQPSA is now in full         
compliance with the South African Mineral and Petroleum Resources           
    Development Act 2002, having exceeded the requirement for 26% Black         
    Economic Empowerment ownership by 2014.                                     
                                                                                
Aquarius purchases 3.5% of South African subsidiary from SavCon             
    On 7th November 2006, Aquarius announced that an agreement was reached with 
    Black Empowerment partner SavCon for the acquisition by AQP of a 3.5%       
    equity interest in AQPSA from SavCon for a cash consideration of R342.5     
million.  The transaction represented a partial implementation of the final 
    phase of the Black Economic Empowerment transaction approved by             
    shareholders in Special General Meeting on 11 October 2004 and increased    
    AQP`s equity interest in AQPSA from 50.5% to 54%.  Implementation requires  
South African DME approval as per section 9 of the AQPSA`s converted mining 
    rights.                                                                     
    Board of Directors                                                          
    Subsequent to the end of the half year, Mr Zwelakhe Sisulu has resigned     
from the Board of Aquarius effective 6th February 2007 due to an increasing 
    work load in South Africa. The Board wish to record their appreciation of   
    Mr Sisulu`s contribution as director to the Company. Mr Kofi Morna who      
    currently acts as Mr Sisulu`s alternate director will join the board        
effective immediately. Mr Zwelakhe Mankazana will act as Mr Morna`s         
    alternate director.                                                         
                                                                                
                                                                                

Statistics               Kroondal       Marikana                                
                        P&SA1          P&SA2                                    
             Unit       6       6      6       6                                
months  months months  months                           
                        Dec     Dec    Dec     Dec                              
                        2006    2005   2006    2005                             
Safety                                                                          
DIIR          Rate/200,  0.93    0.96   0.43    0.76                            
             000 man                                                            
             hrs                                                                
Revenue                                                                         
Gross         Millions   1,917   1,227  580     197                             
revenue                                                                         
PGM basket    $/oz       1,299   879    1,276   863                             
Price                                                                           
Gross cash    %          64      53     47      14                              
margin                                                                          
Nickel Price  $/lb       14.11   6.17   14.11   6.17                            
Copper Price  $/lb       3.35    1.83   3.35    1.83                            
Ave R/$ rate             7.23    6.52   7.23    6.52                            
Cash Costs on-mine                                                              
Per ROM ton   R/ton      204     179    312     374303                          
             $/ton      28      27     43      47                               
Per PGM       R/oz       2,866   2,458  4,405   4,642                           
(3E+Au)                                                                         
             $/oz       396     377    609     712                              
Per PGE       R/oz       2,359   2,025  3,623   3,857                           
(5E+Au)                                                                         
             $/oz       326     311    501     592                              
Capex                                                                           
Current/Sust  R`000s     124,65  33,525 25,507  6,746                           
aining 100%              1                                                      
             $`000s     17,241  5,145  3,528   1,035                            
Expansion     R`000s     -       57,936 90,996  8,147                           
100%                                                                            
$`000s     -       8,891  12,586  1,250                            
Mining Processed                                                                
Underground   ROM ton    3,103   2,911  343     36                              
             `000s                                                              
Open Pit      ROM ton    255     285    645     700                             
             `000s                                                              
Total         ROM ton    3,358   3,195  988     736                             
             `000s                                                              
Grade                                                                           
Plant Head    g/t PGM    2.86    2.92   3.18    3.25                            
Recoveries    %          77      78     69      62                              
PGM Production                                                                  
Platinum      Ozs        143,76  138,95 42,215  30,131                          
                        1       9                                               
Palladium     Ozs        68,914  67,752 20,162  13,288                          
Rhodium       Ozs        24,974  24,672 7,039   4,327                           
Gold          Ozs        1,253   1,155  526     365                             
Total PGM     Ozs        238,90  232,53 69,941  48,111                          
(3E+Au)                  2       7                                              
Total PGE     Ozs        290,22  282,26 85,039  57,887                          
(5E+Au)                  2       8                                              
Base Metals Production                                                          
Nickel        Tons       230     222    121     72                              
Copper        Tons       100     98     65      41                              
Chromite      Tons       197     258    57      104                             
(000)         `000s                                                             
Continued                                                                       
Statistics               Everest        Mimosa          CTRP                    
Unit       6       6      6       6       6      6                 
                        months  months months  months  months months            
                        Dec     Dec    Dec     Dec     Dec    Dec               
                        2006    2005   2006    2005    2006   2005              
Safety                                                                          
DIIR          Rate/200,  0.52    1.18   0.47    0.12    0      0                
             000 man                                                            
             hrs                                                                
Revenue                                                                         
Gross         Millions   652     31     91      55      35     17               
revenue                                                                         
PGM basket    $/oz       1,188   886    949     637     1,606  1,024            
Price                                                                           
Gross cash    %          59      28     72      61      78     44               
margin                                                                          
Nickel Price  $/lb       14.11   6.09   11.27   6.53    14.11  6.17             
Copper Price  $/lb       3.35    2.08   3.40    1.60    3.35   1.83             
Ave R/$ rate             7.23    6.35           -       7.23   6.52             
Cash Costs on-mine                                                              
Per ROM ton   R/ton      212     168    -       -       111    95               
$/ton      29      27     36      32      15     15                
Per PGM       R/oz       3,234   3,136          -       2,172  3,268            
(3E+Au)                                                                         
             $/oz       447     494    395     343     300    501               
Per PGE       R/oz       2,735   2,695          -       1,510  2,318            
(5E+Au)                                                                         
             $/oz       378     424    374     323     209    356               
Capex                                                                           
Current/Sust  R`000s     71,190  -      -       -       -      -                
aining 100%                                                                     
             $`000s     9,846   -      5,123   4,327   -      -                 
Expansion     R`000s     21,117  349,18 -       -       -      378              
100%                             9                                              
             $`000s     2,921   55,026 1,453   3,581   -      58                
Mining Processed                                                                
Underground   ROM ton    809     39     935     862     -      -                
`000s                                                              
Open Pit      ROM ton    456     89             -       -      -                
             `000s                                                              
Total         ROM ton    1,265   129    935     862     70     98               
`000s                                                              
Grade                                                                           
Plant Head    g/t PGM    2.80    3.12   3.66    3.74    4.04   2.95             
Recoveries    %          72      55     78      78      48     33               
PGM Production                                                                  
Platinum      Ozs        46,954  4,161  38,423  36,509  2,155  1,801            
Palladium     Ozs        27,624  2,351  29,342  27,497  783    632              
Rhodium       Ozs        7,535   532    2,987   2,797   631    458              
Gold          Ozs        795     67     5,326   4,959   7      6                
Total PGM     Ozs        82,908  7,111  76,078  71,762  3,576  2,897            
(3E+Au)                                                                         
Total PGE     Ozs        98,047  8,223  38,423  -       5,143  4,085            
(5E+Au)                                                                         
Base Metals Production                                                          
Nickel        Tons       113     13     1,023   1,000   2      -                
Copper        Tons       57      5      852     832     4      -                
Chromite      Tons       -       -      31      30      -      -                
(000)         `000s                                                             
    *Data reflects 100% of operations                                           
    Aquarius Platinum Limited                                                   
Incorporated in Bermuda                                                     
    Exempt company number 26290                                                 
                                                                                
    Board of Directors                                                          
Nicholas Sibley          Non-executive Chairman                             
    Stuart Murray            Chief Executive Officer                            
    David Dix                Non-executive                                      
    Tim Freshwater           Non-executive                                      
Edward Haslam            Non-executive                                      
    Kofi Morna               Non-executive                                      
    Sir William Purves       Non-executive                                      
    Patrick Quirk            Non-executive                                      
Zwelakhe Mankazana       Alternate to Kofi Morna                            
                                                                                
    Audit/Risk Committee                                                        
    Sir William Purves (Chairman)                                               
David Dix                                                                   
    Edward Haslam                                                               
    Nicholas Sibley                                                             
                                                                                
Remuneration/Succession Planning Committee                                  
    Edward Haslam (Chairman)                                                    
    Nicholas Sibley                                                             
                                                                                
Nomination Committee                                                        
    The full Board comprises the Nomination Committee                           
                                                                                
    Company Secretary                                                           
Willi Boehm                                                                 
                                                                                
    Issued Capital                                                              
    At 31 December 2006, the Company had on issue:                              
84,575,558 fully paid common shares and 2,020,320 unlisted options          
      Substantial Shareholders 31      Number of      Percentage                
      December 2006                    Shares                                   
      Impala Platinum Holdings Ltd     7,127,276      8.43                      
Nutraco Nominees Limited         5,877,403      6.95                      
    Trading Information                                                         
    ISIN number BMG0440M1029                                                    
Broker (LSE) (Joint)          Broker (ASX)            Sponsor (JSE)             

    Morgan Stanley & Co      Euroz Securities        Investec Bank              
    International Limited    Level 14, The Quadrant  Limited                    
    20 Cabot Square          1 William Street        100 Grayston Drive         
Canary Wharf             Perth WA 6000           Sandown                    
    London, E14 4QW                                  Sandton 2196               
                                                                                
    Telephone: +44 (0)20     Telephone: +61 (0)8     Telephone: +27 (0)11       
7425 8000                9488 1400               286 7326                   
    Facsimile: +44 (0)20     Facsimile: +61 (0)8     Facsimile: +27 (0)11       
    7425 8990                9488 1478               291 1066                   
                                                                                
Investec Securities                                                         
    Limited                                                                     
    Investec Bank (UK)                                                          
    Limited                                                                     
2 Gresham Street                                                            
    London,  EC2V 7QP                                                           
                                                                                
    Telephone: +44 (0)20                                                        
7597 5970                                                                   
    Facsimile: +44 (0)20                                                        
    75975120                                                                    
Aquarius Platinum (South Africa) (Proprietary) Ltd.                             
50.5% Owned                                                                     
(Incorporated in the Republic of South Africa)                                  
Registration Number 2000/000341/07                                              
Block A, 1st Floor, The Great Wall Group Building                               
5 Skeen Boulevard, Bedfordview                                                  
South Africa 2007                                                               
P O Box 1282                                                                    
Bedfordview South Africa 2009                                                   
Telephone:     +27 (0)11 455 2050                                               
Facsimile:     +27 (0)11 455 2095                                               
Email:         info@aquariussa.co.za                                            
Aquarius Platinum Corporate Services Pty Ltd                                    
100% Owned                                                                      
(Incorporated in Australia)                                                     
ACN 094 425 555                                                                 
Level 4, Suite 5, South Shore Centre,                                           
85 The Esplanade, South Perth, WA  6151, Australia                              
PO Box 485                                                                      
South Perth, WA 6151, Australia                                                 
Telephone:     +61 (0)8 9367 5211                                               
Facsimile:     +61 (0)8 9367 5233                                               
Email:    info@aquariusplatinum.com                                             
AQPSA Management                                                                
Stuart Murray            Executive Chairman                                     
Gert Ackerman            Managing Director                                      
Ayanda Khumalo           Finance Director                                       
Anton Wheeler            Operations Director                                    
Graham Ferreira          General Manager Finance & Company Secretary            
Hugo Holl                General Manager Everest                                
Robert Mallinson         General Manager Marikana                               
Gordon Ramsay            General Manager Projects                               
Abraham (Rudi) Rudolph   General Manager Kroondal                               
Gabriel de Wet           General Manager Engineering                            
Mimosa Mine Management                                                          
Alex Mhembere            Managing Director                                      
Winston Chitando         Finance Director                                       
Herbert Mashanyare       Technical Director                                     
Peter Chimboza           Operations Director                                    
    Glossary                                                                    
    A$             Australian Dollar                                            
Aquarius       Aquarius Platinum Limited                                    
    ABET           Adult Basic Education Training programme                     
    APS            Aquarius Platinum Corporate Services Pty Ltd                 
    AQPSA          Aquarius Platinum (South Africa) Pty Ltd                     
ASACS          Aquarius Platinum (SA) (Corporate Services) (Pty) Limited    
    CTRP           Chromite Ore Tailings Retreatment Operation                  
    DIFR           Disabling Injury Incidence Rate - being the number of lost-  
    time injuries expressed as a rate per 1,000,000 man-hours worked            
DIIR           Disabling Injury Incidence Rate - being the number of lost-  
    time injuries expressed as a rate per 200,000 man-hours worked              
    DME            South African Government Department of Minerals and Energy   
    DMS            Dense Media Separation                                       
Dollar or $    United States Dollar                                         
    EMPR           Environmental Management Programme Report                    
    Everest        Everest Platinum Mine                                        
    Great Dyke Reef     A PGE bearing layer within the Great Dyke Complex in    
Zimbabwe                                                                    
    g/t            Grams per tonne, measurement unit of grade (1g/t = 1 part    
                   per million)                                                 
    JORC code      Australasian code for reporting of Mineral Resources and Ore 
Reserves                                                                    
    JSE            JSE Limited                                                  
    Kroondal       Kroondal Platinum Mine or P&SA1 at Kroondal                  
    LHD            Load Haul Dump machine                                       
Marikana       Marikana Platinum Mine or P&SA2 at Marikana                  
    Mimosa         Mimosa Mining Company (Private) Limited                      
    NOSA           National Occupational Safety Association                     
    PGE(s) (6E)    Platinum Group Elements plus Gold.  Five metallic elements   
commonly found together which constitute the platinoids (excluding Os       
    (osmium)).  These are Pt (platinum), Pd (palladium), Rh (rhodium), Ru       
    (ruthenium), Ir (iridium) plus Au (gold)                                    
    PGM(s) (4E)    Platinum Group Metals plus Gold.  Aquarius reports the PGMs  
as comprising Pt+Pd+Rh plus Au (gold) with the Pt, Pd and Rh being the most 
    economic platinoids in the UG2 Reef.                                        
    P&SA1          Pooling & Sharing Agreement between AQPSA and RPM Ltd on     
    Kroondal                                                                    
P&SA2          Pooling & Sharing Agreement between AQPSA and RPM Ltd on     
    Marikana                                                                    
    R              South African Rand                                           
    RK1            Consortium comprising Aquarius Platinum (SA) (Corporate      
Services) (Pty) Limited (ASACS), Ivanhoe Nickel and Platinum Limited and    
    Sylvania South Africa (Pty) Ltd (SLVSA).                                    
    ROM            Run of Mine.  The ore from mining which is fed to the        
    concentrator plant.  This is usually a mixture of UG2 ore and waste.        
RPM            Rustenburg Platinum Mines Limited                            
    SavCon         The Savannah Consortium. The principal Black Empowerment     
    Investor in Aquarius Platinum                                               
    TKO            TKO Investment Holdings Limited                              
Ton            1 Metric tonne (1,000 kg)                                    
    UG2 Reef       A PGE bearing chromite layer within the Critical Zone of the 
    Bushveld Complex                                                            
    Z$             Zimbabwe Dollar                                              
For further information please contact:                                     
    In Australia:                                                               
    Willi Boehm                                                                 
    Aquarius Platinum Corporate Services Pty Ltd                                
+61 (0)8 9367 5211                                                          
    In the United Kingdom:                                                      
    Nick Bias                                                                   
    BuckBias Limited                                                            
+ 44 (0)7887 920 530                                                        
    In South Africa:                                                            
    Stuart Murray                                                               
    Aquarius Platinum (South Platinum) (Pty) Ltd                                
+27 (0)11 455 2050                                                          
                                                                                
                                                                                
    or visit aquariusplatinum.com                                               
Date: 07/02/2007 11:03:01 Produced by the JSE SENS Department.
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: