Wed 28 Feb 2007, 13:17 DRD - DRDGOLD - Re-Release of the report to shareh
DRD
 DRDD                                                                            
DRD - DRDGOLD - Re-Release of the report to shareholders for the quarter        
and six months ended 31 December 2006                                           
DRDGOLD LIMITED                                                                 
(Incorporated in the Republic of South Africa)                                  
(Registration number 1895/000926/06)                                            
ARB number 086 277 616                                                          
JSE trading symbol: DRD                                                         
ISIN Code: ZAE000058723                                                         
Issuer code: DUSM                                                               
Nasdaq trading symbol: DROOY                                                    
("DRDGOLD" or "the company")                                                    
RE-RELEASE OF THE REPORT TO SHAREHOLDERS FOR THE QUARTER AND SIX MONTHS         
ENDED 31 DECEMBER 2006                                                          
Shareholders are advised that, following today`s announcement of DRDGOLD`s      
unaudited results for the quarter and six months ended 31 December 2006,        
Emperor Mines Limited ("Emperor") has made amendments to its balance sheet,     
following a review by its auditors. Such amendments impact the following        
items on DRDGOLD`s balance sheet as a result of the consolidation of            
Emperor`s financial statements:                                                 
-    assets classified as held for sale;                                        
-    liabilities classified as held for sale;                                   
-    cash and cash equivalents; and                                             
-    provision for environmental rehabilitation.                                
Accordingly, DRDGOLD is re-releasing its unaudited interim financial            
statements for the quarter and six months ended 31 December 2006.               
GROUP RESULTS (Unaudited)                                                       
KEY FEATURES                                                                    
-    Blyvoor wins two safety awards                                             
-    DRDGOLD SA cash costs remain flat at US$505/oz                             
-    DRDGOLD SA records second consecutive quarterly profit                     
-    Prospecting right for ERPM Extension 2 granted                             
-    US$66 million convertible bond fully repaid                                
-    Porgera total reserves increase by 16%                                     
-    Australasian operations pursuing restructuring in order to retire debt     
    and to ensure the full potential value of DRDGOLD assets can be             
achieved                                                                    
KEY RESULTS SUMMARY                                                             
GROUP                               Quarter       Quarter           %           
                                    Dec 06        Sep 06      Change            
Attributable gold production*                                                   
Australasian operations   oz         35 660        41 520        (14)           
                         kg          1 109         1 290        (14)            
Discontinued operation    oz          9 143        17 338        (47)           
Kg            284           539        (47)            
South African operations  oz         87 322        91 339         (4)           
                         kg          2 716         2 841         (4)            
Group                     oz        132 125       150 197        (12)           
kg          4 109         4 670        (12)            
Cash operating costs                                                            
Australasian operations   US$/oz        541           528         (2)           
                         ZAR/kg    127 967       121 792         (5)            
Discontinued operation    US$/oz      1 120           642        (74)           
                         ZAR/kg    265 169       148 006        (79)            
South African operations  US$/oz        505           503          -            
                         ZAR/kg    119 388       115 821         (3)            
Group                     US$/oz        558           526         (6)           
                         ZAR/kg    131 780       121 185         (9)            
Gold price received       US$/oz        617           625         (1)           
                         ZAR/kg    145 909       143 963          1             
Capital expenditure  US$ million       11.5          14.2         19            
                    ZAR million       84.5         101.6         17             
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
Attributable gold production*                                                   
Australasian operations   oz         77 180        75 692     107 336           
                         kg          2 399         2 354       3 340            
Discontinued operation    oz         26 481         8 963      19 434           
Kg            823           279         605            
South African operations  oz        178 661       176 859     139 117           
                         kg          5 557         5 501       4 327            
Group                     oz        282 322       261 514     265 887           
kg          8 779         8 134       8 272            
Cash operating costs                                                            
Australasian operations   US$/oz        534           425         323           
                         ZAR/kg    124 646        86 138      67 891            
Discontinued operation    US$/oz        807           675         559           
                         ZAR/kg    188 436       135 163     117 505            
South African operations  US$/oz        504           509         430           
                         ZAR/kg    117 565       104 334      90 410            
Group                     US$/oz        541           485         375           
                         ZAR/kg    126 144        98 989      78 756            
Gold price received       US$/oz        621           598         467           
                         ZAR/kg    144 892       122 122      98 131            
Capital expenditure  US$ million       25.7          40.9        17.6           
                    ZAR million      186.1         262.6       114.5            
* Emperor consolidated 100% from 6 April 2006 (previously 39.52%                
attributable) and Crown Gold Recoveries (Pty) Limited ("Crown"), which          
included East Rand Proprietary Mines Limited ("ERPM"), consolidated 100%        
from 1 December 2005 (previously 40% attributable).                             
STOCK                                                                           
ISSUED CAPITAL                                                                  
334 823 654 ordinary no par value shares                                        
5 000 000 cumulative preference shares                                          
Total ordinary no par value shares issued and committed: 351 168 446            
STOCK TRADED                     JSE          NASDAQ     FRANKFURT              
Avg. volume for the quarter                                                     
per day (000)                    841           2 945            76              
% of issued stock traded                                                        
(annualised)                      66             230             6              
Price - High                  R10.85         US$1.42     Euro 1.11              
     - Low                   R 6.11         US$0.84     Euro 0.67               
     - Close                 R 6.42         US$0.90     Euro 0.68               
FORWARD LOOKING STATEMENTS                                                      
Many factors could cause the actual results, performance or achievements to     
be materially different from any future results, performance or                 
achievements that many be expressed or implied by such forward-looking          
statements, including, among others, adverse changes or uncertainties in        
general economic conditions in the markets DRDGOLD serves, a drop in the        
gold price, a continuing strengthening of the Rand against the Dollar,          
regulatory developments adverse to DRDGOLD or difficulties in maintaining       
necessary licenses or other governmental approvals, changes in DRDGOLD`s        
competitive position, changes in business strategy, any major disruption in     
production at key facilities or adverse changes in foreign exchange rates       
and various other factors.                                                      
These risks include, without limitations, those described in the section        
entitled "Risk Factors" included in the annual report for the fiscal year       
ended 30 June 2006, which was filed with the United States Securities and       
Exchange Commission on 22 December 2006 on Form 20-F.  Shareholders should      
not place undue reliance on these forward-looking statements, which speak       
only as of the date thereof. DRDGOLD does not undertake any obligation to       
publicly update or revise these forward-looking statements to reflect           
events or circumstances after the date of this report or on the occurrence      
of unanticipated events.                                                        
OVERVIEW                                                                        
Dear shareholder                                                                
Safety                                                                          
It is with deep regret that I record the death of Blyvooruitzicht Gold          
Mining Company Limited ("Blyvoor") employee Nkosana Sikhafungana, Tolukuma      
employees Lawrence Aua and Linus Kopa, along with a Tolukuma contractor and     
a member of the local community, in work-related incidents during the           
quarter under review. Mr Sikhafungana was overcome by noxious gases in the      
underground fire at Blyvoor`s No. 5 Shaft and the deaths at Tolukuma            
resulted from a helicopter crash.                                               
For the quarter, Blyvoor recorded substantial improvements in both its          
disabling injury frequency rate ("DIFR") and reportable injury frequency        
rate ("RIFR"), the former from 13.1 to 6.28 and the latter from 6.55 to         
3.01. Also in January, the mine was awarded the Minister of Minerals and        
Energy`s Safety Flag award for mines in the ultra-deep gold and platinum        
category. To achieve the award, the mine recorded a 33% improvement in its      
RIFR, from 3.34 to 2.23, over a three-year period. The Safety Flag award        
coincided with Blyvoor`s ninth consecutive victory in the annual West Rand      
Mine Managers` Association Inter-mine Safety Competition with an RIFR of        
3.87.                                                                           
The Crown surface operation recorded a significant improvement in its DIFR      
during the quarter, from 9.16 to 3.74. The operation`s RIFR, however,           
deteriorated from 1.14 to 1.26. ERPM, similarly, had a mixed safety             
performance; its DIFR deteriorated from 13.29 to 15.39 while its RIFR           
improved from 6.96 to 5.13.                                                     
At Tolukuma deteriorations were recorded in the lost time injury frequency      
rate ("LTIFR") from 0 to 1.93, in the RIFR from 0 to 7.72, and in the DIFR      
from 2.85 to 7.72.                                                              
A range of programmes are in place at each of the South African and             
Australasian operations, designed to improve safety and health performance.     
Production                                                                      
Total gold production for the quarter was 12% lower at 132 125 oz, mainly       
as a result of a 24% reduction in gold production from the Australasian         
operations. While all three Australasian operations experienced production      
problems, discussed in more detail in the operation-by-operation commentary     
overleaf, the most seriously affected was the Vatukoula operation in Fiji,      
which was placed on care and maintenance in December after a three-month        
review showed that continued mining operations were not economically            
viable. Vatukoula`s production for the quarter was just 9 143 oz, down 47%      
from the previous quarter, reflecting not only the care and maintenance but     
the residual impact of damage and subsequent down-time at Philip Shaft due      
to a skip/cage incident.                                                        
At the South African operations, gold production was 4% lower at 87 322 oz.     
While the Crown surface operation performed better following pipeline           
upgrades and Blyvoor held its own in spite of an underground fire at            
Blyvoor No. 5 Shaft in December, underground faulting encountered at ERPM       
impacted negatively on both volume and grade.                                   
Financial                                                                       
Group financial results for the quarter ended September 2006 have been re-      
stated to account for the discontinuation of operations at Vatukoula and        
are thus comparable with results for the quarter under review. Vatukoula        
incurred a loss of R145.6 million in the quarter ended December 2006 and an     
impairment of R783.1 million.                                                   
Revenue from continuing operations was 5% lower at R548.5 million and cash      
operating costs declined by 4% to R466.3 million, resulting in a cash           
operating profit of R82.2 million, down 7% on the previous quarter.             
Revenue from the South African operations was 4% lower at R390.6 million        
and after accounting for cash operating costs, which was 1% lower at R324.3     
million, cash operating profit was R66.3 million, 14% down on the previous      
quarter.                                                                        
Revenue from the continuing Australasian operations was 6% lower at R157.9      
million but a 10% reduction in cash operating costs to R142.0 million           
resulted in a 39% increase in cash operating profit to R15.9 million.           
In the quarter under review, DRDGOLD repaid its US$66m Convertible Bond.        
Corporate developments                                                          
As was previously announced, I took over from Mark Wellesley-Wood as Chief      
Executive Officer of DRDGOLD with effect from 1 January 2007. Mark served       
the company as Chief Executive Officer and Executive Chairman for more than     
six years. He is the Non-Executive Chairman of DRDGOLD South African            
Operations (Pty) Limited ("DRDGOLD SA"). Group Financial Manager Kobus          
Dissel has been appointed as CFO in an acting capacity.                         
Looking ahead                                                                   
DRDGOLD`s operating and financial performance continued to be marred in the     
quarter under review by the ongoing difficulties of the 78.72%-owned            
Emperor. Shareholders will be aware that Emperor and DRDGOLD recently           
completed a strategic review of the former, which concluded that Emperor        
should consider either the divestment of key assets, or seek a suitable         
merger partner in order to grow the value of its asset base. Emperor            
continues to pursue these restructuring options, with the assistance of         
Rothschild Australia Limited. Meantime, a new short-term finance facility,      
to be re-paid within an agreed timeframe from the proceeds of                   
restructuring, has been arranged with Australia and New Zealand Banking         
Group Limited ("ANZ").                                                          
DRDGOLD regards DRDGOLD SA, in which it holds a 74% stake with black            
economic empowerment ("BEE") partner Khumo Gold, as core to the group.          
While Blyvoor has been adversely affected by illegal industrial action          
during the current quarter, ERPM has received the pleasing news that its        
application to the Department of Minerals and Energy ("DME") for a              
prospecting right over a second portion of the neighbouring Sallies lease       
area has been granted. The area, to be known as ERPM Extension 2, is 5 500      
hectares in extent and has an exploration target of 7-11 million ounces.        
This presents the exciting prospect of a new deep-level mine with a life of     
more than 15 years.  At the Crown surface operation, a R10.5 million            
project for the reclamation of the 3L2 slimes dam has been approved, with       
the prospect of treating through the Crown plant some 270 000 t per month       
at an average yield of 0.3 g/t over a 20-month period. Crown has lodged its     
application for a mining right for the Top Star dump on 1 February 2007.        
John Sayers                                                                     
Chief Executive Officer                                                         
NOTE REGARDING FINANCIAL INFORMATION                                            
The condensed consolidated financial statements below are prepared in           
accordance with International Financial Reporting Standards (IFRS).             
* Period restated to account for the discontinued Vatukoula operation           
 in Fiji.                                                                       
CONSOLIDATED                                  Quarter         Quarter           
Income statement                               Dec 06          Sep 06           
                                                           *Restated            
(Unaudited)                                        Rm              Rm           
Continuing operations                                                           
Gold and silver revenue                         548.5           574.7           
Cash operating costs                           (466.3)         (486.1)          
Cash operating profit                            82.2            88.6           
Corporate administration and other expenses     (69.9)          (43.1)          
Share-based payments                             (0.5)           (3.4)          
Exploration costs                                (2.9)           (4.2)          
Care and maintenance costs                       (2.8)           (2.1)          
Cash profit from operations                       6.1            35.8           
Investments income                               14.7            (9.4)          
Finance charge                                  (24.3)          (15.2)          
Net operating (loss)/profit                      (3.5)           11.2           
Rehabilitation                                   (3.1)           (3.1)          
Depreciation                                    (39.5)          (46.6)          
Loss on financial instruments                    (1.4)           (9.2)          
Movement in gold process                         37.1            16.0           
Loss before taxation                            (10.4)          (31.7)          
Taxation                                         21.0           (15.3)          
Deferred taxation                               (11.2)            2.6           
Loss after taxation                              (0.6)          (44.4)          
Loss on sale of assets/investment                (7.8)              -           
Impairments                                      15.6               -           
Discontinued operations                                                         
Loss for the period from discontinued                                           
operation                                     (145.6)          (36.0)           
Impairment from discontinued operation         (783.1)              -           
Net loss for the period                        (921.5)          (80.4)          
Attributable to:                                                                
Minority interest                             (194.1)          (14.3)           
Ordinary shareholders of the company          (727.4)          (66.1)           
                                              (921.5)          (80.4)           
Headline loss per share-cents                                                   
from continuing operations                     (12.7)          (11.8)           
from total operations                          (47.5)          (20.6)           
Basic loss per share-cents                                                      
from continuing operations                     (10.4)          (11.8)           
from total operations                         (220.9)          (20.6)           
Calculated on the weighted average                                              
ordinary shares issued of:               329 252 570     321 092 406            
Diluted headline loss per share-cents           (12.7)          (11.8)          
Diluted basic loss per share-cents             (220.9)          (20.6)          
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
                                               *Restated                        
Rm            Rm          Rm            
Continuing operations                                                           
Gold and silver revenue             1 123.2         953.9       629.5           
Cash operating costs                 (952.4)       (776.7)     (508.3)          
Cash operating profit                 170.8         177.2       121.2           
Corporate administration and                                                    
other expenses                      (113.0)        (45.0)      (78.4)           
Share-based payments                   (3.9)         (6.5)       (6.8)          
Exploration costs                      (7.1)        (15.6)       (0.9)          
Care and maintenance costs             (4.9)         (4.4)       (4.8)          
Cash profit from operations            41.9         105.7        30.3           
Retrenchment costs                        -             -        (1.0)          
Investments income                      5.3         (85.3)       35.4           
Finance charge                        (39.5)        (19.6)      (23.0)          
Net operating profit                    7.7           0.8        41.7           
Rehabilitation                         (6.2)        (31.2)       (7.8)          
Depreciation                          (86.1)        (72.0)      (71.4)          
(Loss)/profit on financial instruments(10.6)         15.9        (7.5)          
Movement in gold process               53.1         (15.9)       12.1           
Loss before taxation                  (42.1)       (102.4)      (32.9)          
Taxation                                5.7           1.5       (17.3)          
Deferred taxation                      (8.6)        (26.7)       16.5           
Loss after taxation                   (45.0)       (127.6)      (33.7)          
(Loss)/profit on sale of                                                        
assets/investment                     (7.8)         93.0        (3.4)           
Impairments                            15.6          66.3        52.2           
Loss from associates                      -         (72.1)      (79.9)          
Discontinued operations                                                         
Loss for the period                                                             
from discontinued operation         (181.6)         (3.0)       (6.3)           
Impairment from discontinued                                                    
operation                           (783.1)            -           -            
Net loss for the period            (1 001.9)        (43.4)      (71.1)          
Attributable to:                                                                
Minority interest                   (208.4)        (3.2)        (1.2)           
Ordinary shareholders of the                                                    
company                            (793.5)       (40.2)       (69.9)           
                                  (1 001.9)       (43.4)       (71.1)           
Headline loss per share-cents                                                   
from continuing operations           (24.5)       (64.8)       (37.1)           
from total operations                (68.5)       (63.9)       (39.1)           
Basic loss per share-cents                                                      
from continuing operations           (22.1)       (13.8)       (21.0)           
from total operations               (244.0)       (12.9)       (23.1)           
Calculated on the weighted average                                              
ordinary shares issued of:      325 172 488 312 087 964  303 215 809            
Diluted headline loss per share-cents (24.5)       (64.8)       (37.1)          
Diluted basic loss per share-cents   (244.0)       (12.9)       (23.1)          
SEGMENTAL INFORMATION FOR THE QUARTER ENDED 31 DECEMBER 2006                    
                        South Africa  Australasia Discontinued   Other          
                                  Rm           Rm           Rm      Rm          
Gold and silver revenue         390.6        157.9        45.8       -          
Cash operating costs           (324.3)      (142.0)      (75.3)      -          
Cash operating profit/(loss)     66.3         15.9       (29.5)      -          
Corporate administration and                                                    
other expenses                 (18.3)       (33.2)        0.2   (18.4)          
Share based payments                -            -           -    (0.5)         
Exploration costs                   -         (2.9)       (0.6)      -          
Care and maintenance costs          -            -           -    (2.8)         
Cash profit/(loss) from                                                         
operations                      48.0        (20.2)      (29.9)  (21.7)          
Retrenchment costs                  -            -       (27.2)      -          
Investment income                 2.3         (1.5)       (1.6)   13.9          
Finance charge                   (9.3)        (1.5)      (20.0)  (13.5)         
Net operating profit/(loss)      41.0        (23.2)      (78.7)  (21.3)         
Rehabilitation                   (2.3)           -        (0.2)   (0.8)         
Depreciation                    (23.4)       (17.1)      (31.6)    1.0          
Loss on financial instruments       -         (1.4)      (22.3)      -          
Movement in gold process          0.6         36.5       (12.0)      -          
Profit/(loss) before taxation    15.9         (5.2)     (144.8)  (21.1)         
Taxation                         (0.3)        21.2        (0.8)    0.1          
Deferred taxation                   -        (11.2)          -       -          
Profit/(loss) after taxation     15.6          4.8      (145.6)  (21.0)         
SEGMENTAL INFORMATION FOR THE QUARTER ENDED 30 SEPTEMBER 2006                   
                        South Africa  Australasia Discontinued   Other          
                                  Rm           Rm           Rm      Rm          
Gold and silver revenue         406.2        168.5        67.4       -          
Cash operating costs           (329.0)      (157.1)      (79.8)      -          
Cash operating profit/(loss)     77.2         11.4       (12.4)      -          
Corporate administration and                                                    
other expenses                 (14.9)       (16.0)      (13.6)  (12.2)          
Share based payments                -            -           -    (3.4)         
Exploration costs                   -         (4.2)          -       -          
Care and maintenance costs          -            -           -    (2.1)         
Cash profit/(loss) from                                                         
operations                       62.3         (8.8)      (26.0)  (17.7)         
Retrenchment costs                  -            -         1.0       -          
Investment income                 1.4         (2.5)        4.9    (8.3)         
Finance charge                   (2.2)        (7.4)       (3.6)   (5.6)         
Net operating profit/(loss)      61.5        (18.7)      (23.7)  (31.6)         
Rehabilitation                   (2.3)           -        (0.2)   (0.8)         
Depreciation                    (19.5)       (34.4)      (12.9)    7.3          
(Loss)/profit on financial                                                      
instruments                        -         (9.2)        5.0       -           
Movement in gold process          0.8         15.2        (3.2)      -          
Profit/(loss) before taxation    40.5        (47.1)      (35.0)  (25.1)         
Taxation                         (0.1)       (15.2)       (1.1)      -          
Deferred taxation                   -          2.6           -       -          
Profit/(loss) after taxation     40.4        (59.7)      (36.1)  (25.1)         
CONDENSED CONSOLIDATED                                                          
Balance Sheet                                   As at           As at           
                                           31 Dec 06       30 Sep 06            
(Unaudited)                                        Rm              Rm           
Assets                                                                          
Property, plant and equipment                   680.3         2 016.1           
Investments                                      61.8            39.0           
Environmental trust funds                        67.0            62.9           
Other non-current assets                            -           245.7           
Current assets                                1 178.3           928.7           
Inventories                                    109.5           260.5            
Accounts receivables                            68.4           123.8            
Financial assets                                 9.8            12.2            
Cash and cash equivalents                      134.3           517.2            
Assets classified as held for sale             856.3            15.0            
                                             1 987.4         3 292.4            
Equity and Liabilities                                                          
Equity                                          109.5         1 093.3           
Shareholders equity                             77.1           850.2            
Minority shareholders interest                  32.4           243.1            
Long-term borrowings                            278.0           335.9           
Post retirement and other employee benefits      21.1            20.7           
Provision for environmental rehabilitation      281.4           332.4           
Deferred mining and income taxes                 99.5            96.2           
Current liabilities                           1 197.9         1 413.9           
Accounts payable and accrued liabilities       450.5           541.3            
Financial liabilities                          207.5           199.3            
Current portion of long-term borrowings        406.8           673.3            
Liabilities classified as held for sale        133.1               -            
1 987.4         3 292.4            
                                               As at           As at            
                                           30 Jun 06       31 Dec 05            
                                                  Rm              Rm            
Assets                                                                          
Property, plant and equipment                 1 850.6           863.0           
Investments                                      38.9           145.8           
Environmental trust funds                        60.4            55.2           
Other non-current assets                        219.3           243.2           
Current assets                                  835.6           348.6           
Inventories                                    208.7           137.9            
Accounts receivable                            102.1            72.9            
Financial assets                                20.8               -            
Cash and cash equivalents                      489.0           137.8            
Assets classified as held for sale              15.0               -            
                                             3 004.8         1 655.8            
Equity and Liabilities                                                          
Equity                                        1 015.3           507.6           
Shareholders equity                            782.2           479.1            
Minority shareholders interest                 233.1            28.5            
Long-term borrowings                            403.0            11.9           
Post retirement and other employee benefits      24.4            18.0           
Provision for environmental rehabilitation      322.3           289.7           
Financial liabilities                               -             7.5           
Deferred mining and income taxes                 92.0            74.7           
Current liabilities                           1 147.8           746.4           
Accounts payable and accrued liabilities       407.5           380.2            
Financial liabilities                          183.4               -            
Current portion of long-term borrowings        556.9           366.2            
                                             3 004.8         1 655.8            
CONDENSED CONSOLIDATED                        Quarter         Quarter           
Statement of changes in equity                 Dec 06          Sep 06           
(Unaudited)                                        Rm              Rm           
Balance at the beginning of the period        1 093.3         1 015.3           
Share capital issued                             84.7            41.5           
for acquisition finance and cash                88.2            40.0            
for share options exercised                      0.7             0.3            
for increase in share-based payment reserve      0.5             3.4            
for costs                                       (4.7)           (2.2)           
Net loss attributed to ordinary shareholders   (727.4)          (66.1)          
Net loss attributed to minority shareholders   (194.1)          (14.3)          
Increase in minorities                           18.5               -           
Currency translation adjustments and other     (165.5)          116.9           
Balance as at the end of the period             109.5         1 093.3           
Reconciliation of headline loss                                                 
Net loss                                       (727.4)          (66.1)          
Adjusted for:                                                                   
Impairments                                    (15.6)              -            
Impairment from discontinued operation         783.1               -            
Minority share of impairment from                                               
discontinued operations                       (204.4)              -            
Loss on sale of assets                           7.8               -            
Headline loss                                  (156.5)          (66.1)          
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
                                        Rm            Rm          Rm            
Balance at the beginning                                                        
of the period                       1 015.3         507.6       483.1           
Share capital issued                  126.2         111.4        98.4           
for acquisition finance and cash     128.2         105.8        94.1            
for share options exercised            1.0           2.5         1.0            
for increase in share-based payment                                             
reserve                                3.9           6.5         6.8            
for costs                             (6.9)         (3.4)       (3.5)           
Net loss attributed to                                                          
ordinary shareholders               (793.5)        (40.2)      (69.9)           
Net loss attributed to minority                                                 
shareholders                        (208.4)         (3.2)       (1.2)           
Increase in minorities                 18.5         176.6        23.9           
Currency translation adjustments                                                
and other                            (48.6)        263.1       (26.7)           
Balance as at the end of the period   109.5       1 015.3       507.6           
Reconciliation of headline loss                                                 
Net loss                             (793.5)        (40.2)      (69.9)          
Adjusted for:                                                                   
Impairments                          (15.6)        (66.3)      (52.2)           
Impairment from discontinued                                                    
 operation                           783.1             -           -            
Minority share of impairment from                                               
discontinued operations             (204.4)            -           -            
Loss/(profit) on sale of assets        7.8         (93.0)        3.4            
Headline loss                        (222.6)       (199.5)     (118.7)          
CONDENSED CONSOLIDATED                        Quarter         Quarter           
Cash Flow Statement                            Dec 06          Sep 06           
(Unaudited)                                        Rm              Rm           
Net cash out flow from operations               (84.2)          (11.5)          
Working capital changes                          57.2            71.2           
Net cash outflow from investing activities      (72.1)         (105.8)          
Net cash (out)/in flow from                                                     
financing activities                          (203.4)           38.4            
Decrease in cash and cash equivalents          (302.5)           (7.7)          
Translation adjustment                          (46.0)           35.9           
Opening cash and cash equivalents               517.2           489.0           
Closing cash and cash equivalents               168.7*          517.2           
* Closing cash and cash equivalents include R34.4 million classified as         
assets held for sale                                                            
Reconciliation of net cash out flow from operations                             
Net operating (loss)/profit                     (2.7)            11.2           
Net operating loss from discontinued operations(79.5)           (23.6)          
                                              (82.2)           (12.4)           
Adjusted for:                                                                   
Interest provision on convertible bond          (7.0)             7.0           
Amortisation of convertible cost                 1.8              1.7           
Financial instruments                           23.7              4.2           
Unrealised foreign exchange (gain)/loss         (9.8)            16.4           
Growth in Environmental Trust funds             (2.3)            (0.8)          
Other non cash items                            36.8              3.4           
Interest paid                                  (44.3)           (12.2)          
Taxation paid                                   (0.9)           (18.8)          
Net cash outflow from operations               (84.2)           (11.5)          
CONDENSED CONSOLIDATED          6 months to   6 months to 6 months to           
Cash Flow Statement               31 Dec 06     30 Jun 06   31 Dec 05           
(Unaudited)                              Rm            Rm          Rm           
Net cash (out)/in flow from                                                     
operations                           (95.7)        (14.2)        1.0            
Working capital changes               128.4        (145.3)        8.7           
Net cash outflow from investing                                                 
activities                          (177.9)       (135.4)      (97.3)           
Net cash (out)/in flow from                                                     
financing activities                (165.0)        566.5       (27.8)           
(Decrease)/increase in cash and                                                 
cash equivalents                    (310.2)        271.6      (115.4)           
Translation adjustment                (10.1)         79.6        12.0           
Opening cash and cash equivalents     489.0         137.8       241.2           
Closing cash and cash equivalents     168.7         489.0       137.8           
Reconciliation of net cash (out)/in flow from operations                        
Net operating profit                    7.7           0.8        41.7           
Net operating loss from                                                         
discontinued operations             (102.3)        (30.8)       (6.3)           
                                     (94.6)        (30.0)       35.4            
Adjusted for:                                                                   
Interest provision on convertible bond    -          14.0        14.5           
Amortisation of convertible cost        3.5           6.2         3.7           
Financial instruments                  27.9             -        (3.7)          
Unrealised foreign exchange                                                     
loss/(gain)                            6.6          47.7       (28.1)           
Growth in Environmental Trust                                                   
funds                                 (3.1)         (3.0)       (2.6)           
Other non cash items                   40.2           1.8        11.5           
Interest paid                         (56.5)        (31.4)      (19.3)          
Taxation paid                         (19.7)        (19.5)      (10.4)          
Net cash (out)/in flow from                                                     
operations                           (95.7)        (14.2)        1.0            
KEY OPERATING AND FINANCIAL RESULTS (Unaudited)                                 
AUSTRALASIAN OPERATIONS                                                         
Porgera                             Quarter       Quarter           %           
(20% of the Joint Venture)           Dec 06        Sep 06      Change           
Ore milled               t`000          238           262          (9)          
Yield                    g/t           3.09          3.48         (11)          
Gold produced            oz          23 664        29 379         (19)          
                        kg             736           913         (19)           
Cash operating costs     US$/oz         396           401           1           
ZAR/kg      93 834        92 539          (1)           
                        ZAR/t          290           322          10            
Cash operating profit    US$ m          3.3           4.5         (27)          
                        ZAR m         24.2          32.2         (25)           
Capital expenditure (net)US$ m          2.8           1.8         (56)          
                        ZAR m         19.9          12.9         (54)           
                               6 Months to   6 months to   6 month to           
                                 31 Dec 06     30 Jun 06    31 Dec 05           
Ore milled               t`000          500           546         551           
Yield                    g/t           3.30          2.94        4.33           
Gold produced            oz          53 043        51 625      76 613           
                        kg           1 649         1 606       2 384            
Cash operating costs     US$/oz         399           288         274           
                        ZAR/kg      93 117        58 056      57 682            
                        ZAR/t          307           171         250            
Cash operating profit    US$ m          7.8          14.5        14.8           
ZAR m         56.4          91.3        96.6            
Capital expenditure (net)US$ m          4.5           8.2         8.8           
                        ZAR m         32.9          52.0        57.3            
Gold production for the quarter was 19% lower at 23 664 oz, reflecting a 9%     
decline in throughput to 238 000 t and an 11% decrease in yield to 3.09         
g/t.                                                                            
Lower production was a consequence of both a 10-day shutdown to carry out       
remedial work on a ball mill and clave brickwork and the Hides power            
interruptions due to lightening strikes in early December. Lower grades         
from the pit resulted in a lower than expected feed gold grade, 5% lower        
overall than last quarter. Low-grade, long-term stockpiles provided lower       
than expected grades but this was offset by higher-grade open pit and           
underground ore.                                                                
Material mined and moved was below budget due to the removal of the West        
Wall lower buttress and delays to Stage 4 mining associated with high-wall      
rock fall conditions.                                                           
The West Wall cutback excavation is now 75% complete, the West Wall Upper       
Buttress having been completed in December. The removal of the Lower            
Buttress was a key focus of material movement.                                  
Cash operating costs for the quarter were 8% higher at US$396/oz.               
Tolukuma                            Quarter       Quarter           %           
                                    Dec 06        Sep 06      Change            
Ore milled               t`000           45            43           5           
Yield                    g/t           8.29          8.77          (5)          
Gold produced            oz          11 996        12 141          (1)          
                        kg             373           377          (1)           
Cash operating costs     US$/oz         827           835           1           
                        ZAR/kg     195 319       192 634          (1)           
ZAR/t        1 619         1 689           4            
Cash operating loss      US$ m         (1.0)         (3.0)         67           
                        ZAR m         (8.3)        (20.8)         60            
Capital expenditure (net)US$ m          1.6           2.0          20           
ZAR m         11.8          14.3          17            
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
Ore milled               t`000           88            92         101           
Yield                    g/t           8.52          8.13        9.47           
Gold produced            oz          24 137        24 067      30 723           
                        kg             750           748         956            
Cash operating costs     US$/oz         831           718         444           
ZAR/kg     193 969       146 433      93 347            
                        ZAR/t        1 653         1 191         884            
Cash operating (loss)/profit                                                    
                        US$ m         (4.0)         (0.8)        0.1            
ZAR m        (29.1)         (5.0)        0.4            
Capital expenditure (net)US$ m          3.6           0.6         3.6           
                        ZAR m         26.1           3.6        23.7            
Gold production for the quarter was 1% lower at 11 996 oz, due to a 5%          
decline in yield to 8.29 g/t. Throughput was 5% higher at 45 000 t.             
Production for the quarter was negatively affected by the shutdown of the       
SAG mill on 25 November after the discovery of serious damage. The mill re-     
started on 8 December on completion of essential repairs. A helicopter          
crash in October disrupted site logistics and also contributed to reduced       
production.                                                                     
Mill feed from underground mining has been supplemented by low-grade            
surface stocks. Underground mining remains focused on the Zine surface and      
production resumed late in the quarter from the Gulbadi surface.                
Cash operating costs for the quarter were 1% lower at US$827/oz.                
DISCONTINUED OPERATION                                                          
Vatukoula ("Old" Emperor)           Quarter       Quarter           %           
100% Consolidated from 6 April       Dec 06        Sep 06      Change           
2006(Previously 39.52% attributable)                                            
Ore milled               t`000           37            80         (54)          
Yield                    g/t           7.68          6.74          14           
Gold produced            oz           9 143        17 338         (47)          
                        kg             284           539         (47)           
Cash operating cost      US$/oz       1 120           642         (74)          
                        ZAR/kg     265 169       148 006         (79)           
ZAR/t        2 035           997        (104)           
Cash operating loss      US$ m         (4.1)         (1.7)       (141)          
                        ZAR m        (29.4)        (12.4)       (137)           
Capital expenditure (net)US$ m          3.3           5.6          41           
ZAR m         24.7          40.0          38            
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
Ore milled               t`000          117            59         102           
Yield                    g/t           7.03          4.73        5.93           
Gold produced            oz          26 481         8 963      19 434           
                        kg             823           279         605            
Cash operating costs     US$/oz         807           675         559           
ZAR/kg     188 436       135 163     117 505            
                        ZAR/t        1 326           713         701            
Cash operating loss #    US$ m         (5.8)         (5.2)       (4.5)          
                        ZAR m        (41.9)        (32.8)      (29.5)           
Cash operating loss attributable                                                
to DRDGOLD              US$ m         (5.8)         (2.4)          -            
                        ZAR m        (41.9)        (15.6)          -            
Capital expenditure (net) #                                                     
US$ m          8.9           6.7         4.4            
                        ZAR m         64.6          42.4        28.7            
Capital expenditure (net) attributable                                          
to DRDGOLD              US$ m          8.9           3.6           -            
ZAR m         64.6          23.3           -            
# Represents total operation                                                    
Throughput for the quarter was 54% lower at 37 000 t and in spite of a 14%      
increase in yield to 7.68 g/t, there was a 47% decrease in gold production      
to 9 143 oz.                                                                    
Markedly lower production was a consequence of both of the month-long shut      
down of Philip Shaft for repairs and the subsequent mine shutdown in early      
December.                                                                       
As previously announced, a skip-cage conveyance fell down the Philip Shaft      
on 14 October.  This was repaired and returned to service on 14 November.       
On 5 December 2006, after the completion of an extensive three-month            
review, the Vatukoula Mine was placed on care and maintenance.  The results     
of the review concluded that continued mining operations were no longer         
economically viable.  There may be future potential for limited mining at       
Vatukoula and it may be possible to carry out further exploratory work in       
the coming years in order to look for ore resources that could be mined         
profitably, but more work is needed to clarify whether such potential           
exists.                                                                         
SOUTH AFRICAN OPERATIONS                                                        
Blyvoor                             Quarter       Quarter           %           
Dec 06        Sep 06      Change            
Ore milled                                                                      
   Underground          t`000          183           182           1            
   Surface              t`000          896           966          (7)           
Total                t`000        1 079         1 148          (6)           
Yield                                                                           
   Underground          g/t           5.06          5.15          (2)           
   Surface              g/t           0.32          0.33          (3)           
Total                g/t           1.12          1.10           2            
Gold produced                                                                   
   Underground          oz          29 772        30 125          (1)           
                        kg             926           937          (1)           
Surface              oz           9 099        10 352         (12)           
                        kg             283           322         (12)           
   Total                oz          38 871        40 477          (4)           
                        kg           1 209         1 259          (4)           
Cash operating costs                                                            
   Underground          US$/oz         582           627           7            
                        ZAR/kg     137 586       144 491           5            
                        ZAR/t          696           744           6            
Surface              US$/oz         313           293          (7)           
                        ZAR/kg      73 926        67 565          (9)           
                        ZAR/t           23            23           -            
   Total                US$/oz         519           542           4            
ZAR/kg     122 685       124 817           2            
                        ZAR/t          137           137           -            
Cash operating profit    US$ m          3.5           3.2           9           
                        ZAR m         25.4          23.0          10            
Capital expenditure (net)US$ m          2.3           2.7          15           
                        ZAR m         16.9          19.1          12            
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
Ore milled                                                                      
   Underground          t`000          365           349         325            
   Surface              t`000        1 862         1 847       1 787            
   Total                t`000        2 227         2 196       2 112            
Yield                                                                           
   Underground          g/t           5.10          4.93        6.20            
   Surface              g/t           0.32          0.35        0.32            
   Total                g/t           1.11          1.08        1.23            
Gold produced                                                                   
   Underground          oz          59 897        55 362      64 816            
                        kg           1 863         1 722       2 016            
   Surface              oz          19 451        21 027      18 488            
kg             605           654         575            
   Total                oz          79 348        76 389      83 304            
                        kg           2 468         2 376       2 591            
Cash operating costs                                                            
Underground          US$/oz         605           646         469            
                        ZAR/kg     141 059       131 529      98 636            
                        ZAR/t          720           649         612            
   Surface              US$/oz         303           253         242            
ZAR/kg      70 540        51 560      50 887            
                        ZAR/t           23            18          16            
   Total                US$/oz         531           538         419            
                        ZAR/kg     123 772       109 517      88 040            
ZAR/t          137           118         108            
Cash operating profit    US$ m          6.7           4.4         3.5           
                        ZAR m         48.4          27.9        22.6            
Capital expenditure (net)US$ m          5.0           4.6         4.2           
ZAR m         36.0          29.4        27.4            
Total gold production for the quarter was 4% lower at 38 871 oz, reflecting     
a 6% decline in total throughput to 1 079 000 t. Overall yield was 2%           
higher at 1.12 g/t.                                                             
The underground fire in the high-grade area at No. 5 Shaft contributed to       
the quarter`s lower production but 90% of the affected stopes were back in      
production within 48 hours and consequently, the impact was limited to a 1%     
reduction in gold production to 29 772 oz.  While throughput from               
underground rose 1% to 183 000 t, underground yield was 2% lower at 5.06        
g/t. The fire slowed down development, which was 5% lower but opening up in     
the quarter rose by 56%.                                                        
Repairs to the No. 6 Shaft infrastructure damaged in the previous quarter       
continued together with investigative drilling of the Alpha Dyke.               
Gold production for the quarter from surface sources was 12% lower at 9 099     
oz due to the combined impacts of early summer rains, pipe failures and the     
need to raise the tailings dam disposal column.  Surface throughput was 7%      
lower at 896 000 t and surface yield 3% down at 0.32 g/t.                       
Underground cash operating costs for the quarter were 7% lower at US$582/oz     
and in spite of a 7% rise in surface cash costs to US$313/oz, total cash        
operating costs were 4% lower at US$519/oz.                                     
Crown                               Quarter       Quarter           %           
100% Consolidated from 1 Dec         Dec 06        Sep 06      Change           
2005(Previously 40% attributable)                                               
Ore milled               t`000        2 231         2 056           9           
Yield                    g/t           0.41          0.42          (2)          
Gold produced            oz          29 643        27 521           8           
                        kg             922           856           8            
Cash operating costs     US$/oz         399           423           6           
ZAR/kg      94 268        97 453           3            
                        ZAR/t           39            41           5            
Cash operating profit    US$ m          6.2           5.5          13           
                        ZAR m         46.0          39.1          18            
Capital expenditure (net)US$ m          0.5           1.0          50           
                        ZAR m          3.8           7.1          46            
                               6 months to   6 months to 6 months to            
                                 31 Dec 06     30 Jun 06   31 Dec 05            
Ore milled               t`000        4 287         4 016       2 149           
Yield                    g/t           0.41          0.36        0.42           
Gold produced            oz          57 164        47 036      28 923           
                        kg           1 778         1 463         899            
Cash operating costs #   US$/oz         411           495         382           
                        ZAR/kg      95 801       100 659      80 276            
                        ZAR/t           40            37          34            
Cash operating profit #  US$ m         11.7           4.7         4.7           
ZAR m         85.1          29.8        30.6            
Cash operating profit attributable                                              
to DRDGOLD              US$ m         11.7           4.7         0.9            
                        ZAR m         85.1          29.8         5.5            
Capital expenditure (net) #                                                     
                        US$ m          1.5           2.9         2.0            
                        ZAR m         10.9          18.4        13.2            
Capital expenditure (net)                                                       
attributable to DRDGOLD US$ m          1.5           2.9         0.5            
                        ZAR m         10.9          18.4         3.1            
#Represents total operation                                                     
Reflecting the positive impact of pipeline upgrades in the previous             
quarter, throughput increased by 9% to 2 231 000 t. In spite of a 2%            
decline in yield to 0.41 g/t, gold production rose by 8% to 29 643 oz for       
the quarter.                                                                    
Cash operating costs for the quarter were 6% lower at US$399/oz as a            
consequence of the higher gold production.                                      
A R10.5 million capital project for the reclamation of the 3L2 dam has been     
approved. It is expected to recover from the site, and to retreat through       
the Crown plant, some 270 000 t per month at an average yield of 0.3 g/t        
over a 20-month period.                                                         
The company lodged its application to the DME for a mining right for the        
Top Star mine dump on 1 February 2007, while its contesting of a two-year       
moratorium on the recovery of the dump granted to heritage authorities is       
scheduled to be heard in April.                                                 
ERPM                                Quarter       Quarter           %           
100% consolidated from               Dec 06        Sep 06      Change           
1 Dec 2005(Previously                                                           
40% attributable)                                                               
Ore milled                                                                      
Underground              t`000           64            76        (16)           
   Surface              t`000          388           435        (11)            
Total                t`000          452           511        (12)            
Yield                                                                           
   Underground          g/t           7.06          7.49         (6)            
   Surface              g/t           0.34          0.36         (6)            
Total                g/t           1.29          1.42         (9)            
Gold produced                                                                   
   Underground          oz          14 532        18 325        (21)            
                        kg             452           570        (21)            
Surface              oz           4 276         5 016        (15)            
                        kg             133           156        (15)            
   Total                oz          18 808        23 341        (19)            
                        kg             585           726        (19)            
Cash operating costs                                                            
   Underground          US$/oz         627           510        (23)            
                        ZAR/kg     148 044       117 481        (26)            
                        ZAR/t        1 046           880        (19)            
Surface              US$/oz         704           599        (18)            
                        ZAR/kg     166 173       137 949        (20)            
                        ZAR/t           57            49        (16)            
   Total                US$/oz         644           529        (22)            
ZAR/kg     152 166       121 879        (25)            
                        ZAR/t          197           173        (14)            
Cash operating (loss)/                                                          
   profit               US$ m         (0.7)          2.1       (133)            
ZAR m         (5.1)         15.1       (134)            
Capital expenditure (net)US$ m          1.2           1.1         (9)           
                        ZAR m          8.5           8.1         (5)            
                               6 months to   6 months to 6 months to            
31 Dec 06     30 Jun 06   31 Dec 05            
Ore milled                                                                      
   Underground          t`000          140           149         76             
   Surface              t`000          823         1 011        587             
Total                t`000          963         1 160        663             
Yield                                                                           
   Underground          g/t           7.30          8.50       7.88             
   Surface              g/t           0.35          0.39       0.41             
Total                g/t           1.36          1.43       1.26             
Gold produced                                                                   
   Underground          oz          32 857        40 735     19 264             
                        kg           1 022         1 267        599             
Surface              oz           9 292        12 699      7 626             
                        kg             289           395        238             
   Total                oz          42 149        53 434     26 890             
                        kg           1 311         1 662        837             
Cash operating costs #                                                          
   Underground          US$/oz         562           475        447             
                        ZAR/kg     130 998        96 548     94 025             
                        ZAR/t          956           821        752             
Surface              US$/oz         647           550        456             
                        ZAR/kg     150 938       111 737     95 857             
                        ZAR/t           53            44         40             
   Total                US$/oz         581           493        450             
ZAR/kg     135 394       100 158     94 525             
                        ZAR/t          184           144        126             
Cash operating profit #  US$ m          1.4           5.2        0.6            
                        ZAR m         10.0          33.2        3.8             
Cash operating profit attributable                                              
to DRDGOLD              US$ m          1.4           5.2       (0.6)            
                        ZAR m         10.0          33.2       (3.9)            
Capital expenditure (net) #                                                     
US$ m          2.3           1.4        0.7             
                        ZAR m         16.6           9.2        4.5             
Capital expenditure (net) attributable                                          
to DRDGOLD              US$ m          2.3           1.4        0.2             
ZAR m         16.6           9.2        1.4             
# Represents total operation                                                    
Total gold production for the quarter was 18 808 oz, 19% down on the            
previous quarter, reflecting lower gold production from both underground        
and surface sources.                                                            
Lower extraction rates due to faulting in the eastern portion of the            
underground mining area led to a 16% decline in underground throughput to       
64 000 t. This, together with the mining of higher volumes of lower grade       
material from above 70 level, contributed to a 6% decline in underground        
yield to 7.06 g/t. Consequently, underground gold production was 21% lower      
at 14 532 oz.                                                                   
Installation of both a new surface compressor and mud-pumping                   
infrastructure continued during the quarter. The latter, scheduled for          
completion by the end of the December 2007 quarter, is expected to yield        
some 6 kg of gold a month from the treatment of 2 000 t of mud with an          
average grade of 3.0 g/t.                                                       
ERPM`s ambitious, three-phase plugging project, designed to protect the         
mine`s underground operations from rising water levels in the Central           
Witwatersrand Basin, has progressed according to schedule and is expected       
to be completed by the end of the June 2007 quarter.                            
Surface gold production for the quarter was 15% lower at 4 276 oz. An 11%       
decline in throughput to 388 000 t resulted from water shortages, pipe and      
pump failures, cable theft and power outages.  Work to change the Cason         
Dump face shape to improve safety and environmental controls led to a 6%        
drop in yield to 0.34 g/t.                                                      
A project has begun to recover and treat residual surface material from the     
ERPM lease area.  It is expected to treat between 10 000 and 15 000 t per       
month at an average grade of 1.00 g/t until December 2007, generating           
revenue while substantially reducing environmental obligations.                 
Total cash operating costs for the quarter increased by 22% to US$644/oz,       
reflecting lower gold production. Underground cash costs rose by 23% to         
US$627/oz and surface cash costs by 18% to US$704/oz.                           
CASH OPERATING COSTS RECONCILIATION                                             
AUSTRALASIAN OPERATIONS (R000 unless otherwise stated)                          
                            Tolukuma  Porgera  Continued Discontinued           
                                      JV (20%)Operations    Vatukoula           
Total cash costs                                                                
        Dec 06 Qtr            90 006   39 474    129 480     114 894            
        Sep 06 Qtr            72 686   84 853    157 539      95 607            
        6 months to Dec 06   162 692  124 327    287 019     210 501            
Movement in gold in process                                                     
        Dec 06 Qtr            (4 017)  40 494     36 477     (12 002)           
        Sep 06 Qtr            11 241    3 968     15 209      (3 215)           
        6 months to Dec 06     7 224   44 462     51 686     (15 217)           
Less: Exploration, production                                                   
taxes, rehabilitation and other                                                 
        Dec 06 Qtr             5 847    7 836     13 683         620            
        Sep 06 Qtr             4 437    1 325      5 762           -            
6 months to Dec 06    10 284    9 161     19 445         620            
Less: Retrenchment costs                                                        
         Dec 06 Qtr                -        -         -       27 162            
         Sep 06 Qtr                -        -         -       (1 009)           
6 months to Dec 06        -        -         -       26 153            
Less: Corporate and general                                                     
administration costs                                                            
         Dec 06 Qtr            7 288    3 070    10 358         (198)           
Sep 06 Qtr            6 867    3 008     9 875       13 626            
         6 months to Dec 06   14 155    6 078    20 233       13 428            
Cash operating costs                                                            
         Dec 06 Qtr           72 854   69 062   141 916       75 308            
Sep 06 Qtr           72 623   84 488   157 111       79 775            
         6 months to Dec 06  145 477  153 550   299 027      155 083            
Gold produced (kg)                                                              
         Dec 06 Qtr              373      736     1 109          284            
Sep 06 Qtr              377      913     1 290          539            
         6 months to Dec 06      750    1 649     2 399          823            
Cash operating costs (R/kg)                                                     
         Dec 06 Qtr          195 319   93 834   127 968      265 169            
Sep 06 Qtr          192 634   92 539   121 791      148 006            
         6 months to Dec 06  193 969   93 117   124 647      188 436            
Cash operating costs (US$/oz)                                                   
         Dec 06 Qtr              827      396       541        1 120            
Sep 06 Qtr              835      401       529          642            
         6 months to Dec 06      831      399       535          807            
SOUTH AFRICAN OPERATIONS (R000 unless otherwise stated)                         
                               Crown       ERPM   Blyvoor     Total             
Total cash costs                                                                
         Dec 06 Qtr           93 703   94 829   153 520      342 052            
         Sep 06 Qtr           89 650   94 418   162 201      346 269            
         6 months to Dec 06  183 353  189 247   315 721      688 321            
Movement in gold in process                                                     
         Dec 06 Qtr               33      187       419          639            
         Sep 06 Qtr              241      (38)      587          790            
         6 months to Dec 06      274      149     1 006        1 429            
Less: Exploration, production                                                   
taxes, rehabilitation and other                                                 
         Dec 06 Qtr            2 943    2 064     1 443        6 450            
         Sep 06 Qtr            2 643    1 960     1 374        5 977            
6 months to Dec 06    5 586    4 024     2 817       12 427            
Less: Retrenchment costs                                                        
         Dec 06 Qtr                -        -         -            -            
         Sep 06 Qtr                -        -         -            -            
6 months to Dec 06        -        -         -            -            
Less: Corporate and general                                                     
administration costs                                                            
         Dec 06 Qtr            3 878      3 935     4 170      11 983           
Sep 06 Qtr            3 828      3 936     4 270      12 034           
         6 months to Dec 06    7 706      7 871     8 440      24 017           
Cash operating costs                                                            
         Dec 06 Qtr           86 915     89 017   148 326     324 258           
Sep 06 Qtr           83 420     88 484   157 144     329 048           
         6 months to Dec 06  170 335    177 501   305 470     653 306           
Gold produced (kg)                                                              
         Dec 06 Qtr              922        585     1 209       2 716           
Sep 06 Qtr              856        726     1 259       2 841           
         6 months to Dec 06    1 778      1 311     2 468       5 557           
Cash operating costs (R/kg)                                                     
         Dec 06 Qtr           94 268    152 166   122 685     119 388           
Sep 06 Qtr           97 453    121 879   124 817     115 821           
         6 months to Dec 06   95 801    135 394   123 772     117 565           
Cash operating costs (US$/oz)                                                   
         Dec 06 Qtr              399        644       519         505           
Sep 06 Qtr              423        529       542         503           
         6 months to Dec 06      411        581       531         504           
EXPLORATION AND DEVELOPMENT                                                     
FIJI                                                                            
Vatukoula                                                                       
Limited underground exploration was undertaken in the Philip Shaft section      
prior to the cessation of mining.                                               
A commercial and technical review of mine site and near mine exploration        
was completed. This involved data compilation, integration and                  
interpretation and was aimed at identifying new near mine exploration           
targets. A number of target areas have been defined to be of interest.          
Fiji Regional                                                                   
No regional exploration work was carried out elsewhere in Fiji.  Historical     
data on the Tuvatu Project was reviewed in preparation for additional work      
in this area. Regional programs for all other surface permits were              
reviewed.                                                                       
PAPUA NEW GUINEA                                                                
Tolukuma                                                                        
Exploration activity at Tolukuma continued to concentrate on the Zine and       
Fundoot structures. Minor drilling was undertaken on the Triple M structure     
to the east of Zine. Surface trenching aimed at generating drill targets        
continued in the Degot/Fundoot area and in areas further south of the           
lease.  An exploration review workshop conducted during the month of            
November identified multiple exploration targets within the Tolukuma            
corridor. From late November to December exploration activity was scaled        
down (as a result of the SAG mill breakdown) and is yet to return to full       
capacity.                                                                       
In the next (January - March 2007) quarter exploration will continue to be      
focused on delineation and extensional drilling of the Zine and Fundoot         
South structures. Intensive drilling is planned to fully test the Zine          
structure as soon as access to appropriate underground locations become         
available. Surface trenching and mapping will continue to the southern part     
of the lease into the Aivelolop and Kagam structures. The Aivelolop             
structure will be tested with several drill holes both from the surface and     
underground.                                                                    
Zine Exploration Drilling & Underground Development                             
The Zine structure continued to be tested by drilling and underground           
development in an effort to define the extents of the mineralisation.           
Within the Zine Mid section underground development has been carried out        
from 1525 up to 1565 and down to 1505 levels. On 1505 level development         
face grades of up to 1.8m @ 190.7 g/t Au (uncut) have been obtained from        
the central section of the Zine Mid pod. Drilling to date has indicated         
mineralisation within the Zine Mid pod to extend at least 160m below            
current developments at 1505 level. Initial surface drilling results of the     
Zine North section have not been encouraging but the presence of the            
structure has been confirmed and the lower sections (below 1495 level) are      
yet to be tested. Further testing is yet to be carried out in the Zine          
South and Zine Far South areas.                                                 
Drilling Results from October - December 2006*                                  
Hole No. Intersection            Comments          RL (m)    Core               
                                                          Recovery %            
TU084    2.08m @ 2.25 g/t Au     Zine Mid North    1322       100               
and 4.4 g/t Ag                                                          
TU085    No significant          Zine Mid South    1405       100               
        mineralisation                                                          
ZN087    0.62m @ 6.38 g/t Au     Zine North        1556        96               
and 24.6 g/t Ag                                                         
ZN088    2.0m @ 0.86 g/t Au      Zine North        1510       100               
        and 13.5 g/t Ag                                                         
ZN089    0.40 @ 6.23 g/t Au      Zine North        1495        70               
and 24.9 g/t Ag                                                         
* Assay results are uncut; Intersection widths calculated based on angle to     
core axis                                                                       
Fundoot Exploration                                                             
The upper zones of the Fundoot structure continued to be tested from the        
surface with mixed results. A mechanical trenching exercise using an            
excavator to expose the top of the vein (in areas of overburden cover) is       
planned for a 150m wide zone.                                                   
Drilling Results from October - December 2006*                                  
Hole No. Intersection            Comments          RL (m)     Core              
                                                          Recovery %            
IV026    0.40m @ 34.08 g/t Au    Fundoot           1600       100               
and 5.21 g/t Ag                                                         
TU027    0.75m @ 5.31 g/t Au     Fundoot           1600       100               
        and 25.0 g/t Ag                                                         
ZN028    No significant          Fundoot           1632       100               
mineralisation                                                          
ZN029    0.27m @ 39.73 g/t Au    Fundoot           1584       100               
        and 121.0 g/t Ag                                                        
ZN031    0.30m @ 21.21 g/t Au    HW Splay          1560       100               
and 43.4 g/t Ag                                                         
ZN033    0.83 @ 10.39 g/t Au     Fundoot           1585       100               
        and 161.5 g/t Ag                                                        
ZN034    0.77 @ 2.93 g/t Au      Fundoot           1529       100               
and 21.2 g/t Ag                                                         
ZN035    0.95@ 0.35g/t Au        Fundoot           1643        86               
        And 24.1 g/t Ag                                                         
*Assay results are uncut; intersection widths calculation based on angle to     
drill core axis                                                                 
Regional Program                                                                
The company maintains eleven Exploration Licenses.  A major technical           
review of all exploration tenements completed earlier this year highlighted     
multiple prospects with several areas requiring advanced stage exploration      
and drilling. Field work in EL1271 and 1366 has commenced and planning for      
work in ELs 894 and 683 is underway.  Weather problems difficulty in            
employing additional geologists and field personnel and the unavailability      
of helicopters greatly restricted the scope of work. Further data               
interpretation is in progress.                                                  
An assessment of the porphyry associated copper and gold potential within       
Emperor`s regional ELs is underway.                                             
Field work was completed in the Ipi Creek EL1352 during the previous            
quarter. Compilation of field results has shown that porphyry copper type       
alteration and mineralisation occurs in the area centered on a small            
intrusive stock. A collapsed diatreme breccia has also been interpreted to      
occur in the Ipi area and further work is aimed at delineating the diatreme     
and to further map and sample the area.                                         
Results of soil sampling at Belavista in EL1284 during the previous quarter     
has shown a 1 km x 1 km area to be anomalous in Au with co-incident As, Hg      
and Pb anomalies. This is interpreted to be due to mineralisation within        
the regional Goilala Fault structures that occur in the area. Samples taken     
across discrete structures within the Goilala Fault zone returned assays of     
0.46 ppm Au, 5.5 ppm Ag, 0.14% Cu and 0.1% As, and 6.32 ppm Au, 20 ppm Ag,      
0.12% Cu and 0.7 % As. Further work is planned for the area to test strike      
extensions of the two structures and to expose additional structures that       
may be responsible for the soil anomaly observed in the area.                   
Porgera Joint Venture                                                           
The Porgera Deeps drilling program continued with 2 holes being drilled,        
one a re-drill that was again abandoned due to difficult drilling               
conditions.                                                                     
Drilling at Tupagai (located immediately north of Porgera) is expected to       
commence in the first quarter of 2007. Work continued on the interpretation     
of historical mapping data. Additional targets have been identified based       
on coincident geochemical and geophysical anomalies in favourable litho-        
structural positions within the Porgera Transfer Zone.                          
SOUTH AFRICA                                                                    
ERPM                                                                            
ERPM Extension 1 (Sallies)                                                      
The second and third exploration boreholes have been completed and surveyed     
to assist with geological interpretation. Assays and check assays have been     
conducted.                                                                      
Borehole assay results:                                                         
BH No. 2 Channel Value 11.11 g/t / 64 cm (715 cmgt)                             
BH No. 3 Channel Value 2.45 g/t / 227 cm (556 cmgt)                             
A fourth exploration borehole is being drilled to determine extent of           
paleohigh and is currently at 32.3 m. An additional machine has begun           
drilling within the ERPM lease area.                                            
On completion of the fourth borehole, drilling will be concentrated within      
the mine lease area to firm up on geological structures.                        
ERPM Extension No. 2                                                            
The prospecting right for ERPM Extension 2 was granted. The area covers 5       
500.231 hectares to the east of the ERPM Extension 1 (Sallies) prospecting      
area, which incorporates the southern sections of the old Van Dyk mining        
lease area and a small portion of Sallies. The area has a potential             
exploration target of some 7-11 million ounces, which could result in the       
development of a deep-level mine with a life of mine in excess of 15 years.     
BLYVOORUITZICHT                                                                 
Savuka Exploration - Alpha Dyke                                                 
The current depth of the exploration borehole, drilling of which was            
suspended during the quarter due to the Blyvoor No. 5 Shaft underground         
fire, is 81.4 m.                                                                
Tenders for the diamond drilling contract closed on 23 January 2007. On         
awarding of the contract, additional drilling will be undertaken to firm up     
on geology and valuation down dip of current mining operations.                 
CROWN                                                                           
Elsburg exploration drilling results:                                           
4L50 dump: 17 holes were drilled on a 200 x 200 m grid. A resource of 18.6      
million tons at 0.251 g/t has been determined.                                  
4L 48 dump: 24 holes were drilled on a 200 x 200 m grid. A resource of 80.8     
million tons at 0.351 g/t has been determined.                                  
4L 47 dump: 32 holes were drilled on a 200 x 200 m grid. A provisional          
valuation of 37.8 million tons at 0.261 g/t has been determined and while       
test work remains to be completed, no significant changes are expected.         
3/L/10 and Angelo: drilling of the ERGO portions has been completed and         
assay results are awaited.                                                      
WPU Slime Roodepoort: drilling of slimes for toll treatment has been            
completed and results are awaited.                                              
ARGONAUT                                                                        
A desktop survey has been conducted, using historical geophysical               
information, to confirm that the proposed borehole is sited favourably in       
terms of structure and grade.                                                   
INVESTOR RELATIONS                                                              
DIRECTORS - (*British)(**Australian)(***American)                               
Executive:                                                                      
JWC Sayers (Chief Executive Officer)                                            
Non-executives:                                                                 
J Turk ***                                                                      
Independent non-executives:                                                     
DJM Blackmur** (Senior Non-Executive Director); GC Campbell*(Non-Executive      
Chairman); RP Hume                                                              
Alternate:                                                                      
JH Dissel                                                                       
Group Company Secretary:                                                        
TJ Gwebu                                                                        
INVESTOR RELATIONS                                                              
For further information, contact Ilja Graulich at:                              
Tel: (+27-11) 219-8700, Fax: (+27-11) 476-2637,                                 
e-mail: ilja.graulich@za.drdgold.com,                                           
website: http://www.drdgold.com                                                 
Ebsco House 4, 299 Pendoring Avenue,                                            
Blackheath, Randburg, South Africa.                                             
PO Box 390,                                                                     
Maraisburg, 1700,                                                               
South Africa.                                                                   
Johannesburg                                                                    
28 February 2007                                                                
Date: 28/02/2007 13:17:01 Produced by the JSE SENS Department.                  
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: