Not logged in
  Home   Markets   Shares   Funds   Portfolio   Toolbox   Charting   Alerts   Directory   
 Admin   

Fri 23 Mar 2007, 12:34 GBG - Great Basin Announces Discovery Of More High
GBG
 GBG                                                                             
GBG - Great Basin Announces Discovery Of More High Grade Gold And Silver Veins  
                At Hollister Development Block                                  
Great Basin Gold Limited                                                        
(Incorporated in Canada and registered as an External Company in South Africa)  
(Registration No. 2006/021304/10)                                               
Share Code: GBG & ISIN Number: CA3901241057                                     
("Great Basin" or "the Company")                                                
GREAT BASIN ANNOUNCES DISCOVERY OF MORE HIGH GRADE GOLD AND SILVER              
VEINS AT HOLLISTER DEVELOPMENT BLOCK                                            
March 22 2007, Vancouver, BC - Great Basin Gold Ltd. (TSX: GBG; AMEX: GBN; JSE: 
GB Gold) ("Great Basin Gold" or the "Company") announces further results from   
underground drilling at the Hollister Development Block ("HDB") Project on the  
Carlin Trend in Nevada, USA.  Drilling has taken place at 100 ft (30 m) spacing 
to fill in gaps from surface drilling within the Clementine and Gwenivere vein  
systems.                                                                        
One hundred percent of the planned 55,000 ft (16,750 m) of underground drilling 
has been completed.  Analytical results for the final holes are being released  
as they are received.  The following results are for 19 holes, shown in the     
attached Table of Assay Results - Underground Drilling, are mainly from drill   
holes in and nearby to the Clementine vein system.  As indicated in the Table,  
several new veins have been discovered during the drilling within this system.  
These veins are being more fully explored in another phase of work that has now 
been initiated at site.  This continued phase of drilling includes plans for an 
additional 53,000 ft of drilling designed to address gaps in the drilling       
completed to date as well as targeting new areas.  A number of drill holes are  
designed to test areas where infrastructure might be developed.                 
Great Basin Gold recently announced that it will purchase Hecla Mining Company`s
50% earn-in rights to the HDB.   The 55,000 foot drilling program was carried   
out by Hecla over the past twelve months as part of an earn-in program that     
would have included a feasibility study and other work directed toward          
development of the HDB project.  Progress has been made toward the completion of
the feasibility study and it now expected to be completed by the end of June    
2007.                                                                           
Highlights include:                                                             
Hole HDB-098 intersected 1.5 ft (0.5 m) grading 1.30 oz/t (44.67 g/t) Au and    
12.27 oz/t (420.69 g/t) Ag from 211.4-213.7 ft (64.4-65.1 m).                   
Hole HDB-107 intersected 4.1 ft (1.2 m) grading 0.39 oz/t (13.37 g/t) Au and    
0.19 oz/t (6.5 g/t) Ag from 202.1-206.6 ft (61.6-63.0 m).                       
Hole HDB-113 intersected 2.2 ft (0.8 m) grading 9.09 oz/t (311.66 g/t) Au and   
29.53 oz/t (1012.5 g/t) Ag from 205.2-207.5 ft (62.5-63.2 m) and 7.5 ft (2.3 m) 
grading 0.351 oz/t (12.03 g/t) Au and 1.23 oz/t (42.2 g/t) Ag from 300.0 -308.0 
ft (91.4-93.0 m).                                                               
Hole HDB-114 intersected 3.5 ft (1.1 m) grading 1.18 oz/t (40.46 g/t) Au and    
10.5 oz/t (360.0 g/t) Ag from 223.8-227.5 ft (85.1-86.5 m).                     
Hole HDB-121 intersected 2.5 ft (0.8 m) grading 1.05 oz/t (36.0 g/t) Au and 4.24
oz/t (145.37 g/t) Ag from 221.9-224.4 ft (84.4-85.4 m).                         
Hole HDB-122 intersected 4.4 ft (1.3 m) grading 0.408 oz/t (14.0 g/t) Au and    
2.18 oz/t (74.4 g/t) Ag from 291.2-297.4 ft (88.8-90.6 m).                      
Hole HDB-126 intersected 2.8 ft (0.9 m) grading 1.56 oz/t (53.66 g/t) Au and    
22.14 oz/t (759.1 g/t) Ag from 276.5-279.3 ft (84.1-85.1 m).                    
After a delay of several months due to the lack of available drills, the surface
drilling program undertaken by GBG has also be initiated this month at          
Hollister.  Twenty-eight drill holes, totaling 48,850 ft (14,890 m) are planned 
on the Hollister property.  Of these, 11 holes, totaling 14,450 ft (4,400 m) are
planned to test five targets within the HDB and 17 holes, totaling 31,400 ft    
(9,570 m) are planned in four target areas outside the HDB area.                
-2-                                                                             
Gernot Wober, P.Geo., a qualified person and Exploration Manager of Great Basin 
Gold, is monitoring the program on behalf of Great Basin and has reviewed this  
news release.                                                                   
Great Basin Gold has two advanced stage gold projects in two of the world`s best
gold environments: the Hollister property on the Carlin Trend of Nevada, USA,   
and the Burnstone Gold Project in the Witwatersrand Goldfield of South Africa.  
For more information on Great Basin and its projects, please visit the Company`s
website at www.greatbasingold.com or call Investor Services at 604-684-6365 or  
within North America at 1-800-667-2114.                                         
Ferdi Dippenaar                                                                 
President and CEO                                                               
Samples collected from the Hollister Development Block Project are stored in    
Hecla`s secure facility until picked up by Inspectorate America Corporation     
(Inspectorate) of Sparks, Nevada.  Vein samples are analyzed by either metallic 
screen or standard fire assay procedures.  For metallic screen analyses, vein   
sample preparation consists of drying and jaw-crushing the entire sample to 90% 
passing 10-mesh, taking a 500 g sub-sample using a rotary splitter, and then    
pulverizing the 500 g sub-sample to 90% passing 150-mesh using a large capacity 
ring and puck pulverizer.  Gold and silver determinations are by metallic screen
analysis, with two 1 assay-ton (30 g) fire assays completed on the fine         
fraction; the coarse fraction is fire assayed in its entirety.  For standard    
fire assay, vein sample preparation consists of drying and jaw-crushing the     
entire sample to 90% passing 10-mesh, taking a 300 g sub-sample using a Jones   
splitter, and then pulverizing the 300 g sub-sample to 90% passing 150-mesh     
using a large capacity ring and puck pulverizer.  A 30 g charge is fire assayed.
All metal determinations are by gravimetric finish.  Vein samples analyzed by   
standard fire assay will be re-assayed using metallic screen procedures.        
Laboratory Quality Assurance/Quality Control (QA/QC) is monitored using coarse  
reject blanks and assay standards submitted by Hecla, duplicate fire assays, and
Inspectorate`s internal standards and blanks.  Coarse blanks (barren rhyolite or
landscape marble) and assay standards are inserted by Hecla into the sample     
sequence as blind samples prior to submitting the samples to the laboratory.    
Inspectorate also inserts assay standards and blanks into the sample stream.    
QA/QC results are within acceptable limits.                                     
No regulatory authority has approved or disapproved the information contained in
this news release.                                                              
This release includes certain statements that may be deemed "forward-looking    
statements". All statements in this release, other than statements of historical
facts, that address possible future commercial production, reserve potential,   
exploration drilling results, development, feasibility or exploitation          
activities and events or developments that Great Basin Gold expects to occur are
forward-looking statements. Although the Company believes the expectations      
expressed in such forward-looking statements are based on reasonable            
assumptions, such statements are not guarantees of future performance and actual
results or developments may differ materially from those in the forward-looking 
statements. Factors that could cause actual results to differ materially from   
those in forward-looking statements include market prices, exploitation and     
exploration successes,  delay in the completion of the feasibility study,       
continuity of mineralization, and continued availability of capital and         
financing, and general economic, market or business conditions. Investors are   
cautioned that any such statements are not guarantees of future performance and 
those actual results or developments may differ materially from those projected 
in the forward-looking statements. For more information on the Company,         
Investors should review the Company`s annual Form 20-F filing with the United   
States Securities and Exchange Commission and its home jurisdiction filings that
are available at www.sedar.com.                                                 
HOLLISTER DEVELOPMENT BLOCK UNDERGROUND DRILLING ASSAYS RESULTS                 
Drill                From   To    Drilled    Est.     Au (opt)  Ag              
Hole ID   Vein                    Thickness  True               (opt)           
                                 (ft)       Width                               
                                            (ft)                                
HDB-097   Clementine 69.4   70.3  0.9        0.8      0.054     0.78            
130.5  131.3 0.8        0.5      0.496     0.95             
                    217.5  219.2 1.7        1.3      0.013     0.62             
HDB-098   Clementine 61.3   62.5  1.2        1.2      0.285     3.02            
                    120.5  121.6 1.1        0.7      0.118     0.12             
211.4  213.7 2.3        1.5      1.304     12.27            
                    264.9  272.7 7.8        5.0      0.003     0.01             
HDB-104   Clementine 246.5  248.0 1.5        1.1      0.077     2.99            
                    248.0  255.7 7.7        5.7      0.019     1.10             
255.7  259.3 3.6        2.8      0.187     1.68             
HDB-106              191.0  191.5 0.5        0.5      0.005     0.01            
                    303.0  308.0 5.0        4.3      0.020     0.40             
HDB-107              109.5  110.6 1.1        0.8      0.435     0.33            
202.1  206.6 4.5        4.1      0.393     0.19             
                    298.0  299.3 1.3        1.3      0.388     1.02             
HDB-108              63.0   68.4  5.4        4.1      0.008     0.11            
                    107.4  108.0 0.6        0.5      0.644     1.86             
112.4  113.0 0.6        0.5      1.312     4.16             
                    226.2  229.5 3.3        3.2      0.102     1.83             
HDB-109              240.5  241.3 0.8        0.7      0.061     0.19            
                    263.7  264.8 1.1        1.0      1.475     0.76             
264.8  275.0 10.2       8.4      0.143     0.15             
                    361.7  363.0 1.3        1.2      0.117     0.52             
HDB-110              280.3  281.3 1.0        0.8      0.996     0.31            
                    320.8  321.6 0.8        0.7      0.280     0.15             
HDB-111              233.5  234.8 1.3        1.2      0.285     6.07            
                    186.2  187.8 1.6        1.5      pending   pending          
HDB-112              75.8   76.6  0.8        0.7      0.297     pending         
                    87.5   88.5  1.0        0.7      0.013     0.16             
222.5  223.2 0.7        0.6      1.366     2.84             
                    229.3  230.3 1.0        1.0      0.880     3.46             
                    260.8  261.8 1.0        0.6      0.023     0.19             
                    327.6  328.8 1.2        0.8      0.330     pending          
HDB-113              133.9  134.9 1.0        0.9      0.370     0.60            
                    205.2  207.5 2.3        2.2      9.088     29.53            
                    267.0  267.4 0.4        0.4      0.051     0.99             
                    300.0  308.0 8.0        7.5      0.351     1.23             
HDB-114              63.0   63.8  0.8        0.7      0.518     0.67            
                    223.8  227.5 3.7        3.5      1.180     10.50            
                    285.3  286.5 1.2        1.2      0.200     2.39             
Drill               From  To     Drilled   Est.     Au (opt)  Ag                
Hole ID Vein                     Thickness True               (opt)             
                                (ft)      Width                                 
                                          (ft)                                  
HDB-116             320.0 322.0  2.0       1.3      0.289     6.63              
HDB-121             98.0  98.3   0.3       0.3      0.102     1.12              
                   221.9 224.4  2.5       2.5      1.050     4.24               
HDB-122 Clementine  291.2 297.4  6.2       4.4      0.408     2.35              
                   291.2 292.0  0.8       0.6      1.803     0.34               
292.0 293.3  1.3       0.9      0.011     0.07               
                   293.3 294.4  1.1       0.8      0.030     3.52               
                   294.4 295.4  1.0       0.7      0.002     0.04               
                   295.4 297.4  2.0       1.4      0.520     5.16               
HDB-124             12.8  14.0   1.2       1.2      0.282     0.62              
                   55.9  57.9   2.0       1.0      0.152     0.51               
                   57.9  59.0   1.1       1.1      0.591     0.89               
                   67.4  68.5   1.1       1.1      0.296     0.89               
189.2 190.2  1.0       1.0      0.235     0.06               
                   211.7 212.9  1.2       1.0      0.107     0.26               
                   230.5 231.9  1.4       1.3      1.117     26.55              
HDB-126             276.5 279.3  2.8       2.8      1.565     22.14             
HDB-130             217.4 219.1  1.7       1.5      0.803     2.180             
                   329.2 332.0  2.8       2.1      0.230     0.716              
                   417.7 420.0  2.3       1.6      0.223     0.930              
                   422.7 422.9  0.2       0.2      0.278     0.627              
23 March 2007                                                                   
Date: 23/03/2007 12:34:50 Produced by the JSE SENS Department.                  
Profile Group (Pty) Ltd. has taken care in preparing all information on this website, but does not accept any liability for errors or out-of-date information.
Other Profile Group sites: FundsData Online (unit trust data)  |  Profile Group corporate site
[  Terms of Use |  Privacy Policy |  PAIA manual |  FAQs/Help |  Site Map |  © Copyright Reserved 2026  ]
  


Powered by ProfileData

Profile Mobile App Google Play Store Apple App Store


Follow us on: